一项工程范文

时间:2023-03-27 08:56:44

导语:如何才能写好一篇一项工程,这就需要搜集整理更多的资料和文献,欢迎阅读由公务员之家整理的十篇范文,供你借鉴。

一项工程

篇1

An elderly carpenter was ready to retire. He told his employer of his plans to leave the house building business and live a more leisurely life with his wife and his extended family. He would miss the paycheck, but he needed to retire. They could get by (通过).

 

一位上了年纪的木匠打算退休了。他把自己的想法告诉了老板。木匠说自己打算离开房屋建筑这个行业,因为他想和妻子、家人一起享受更悠闲的生活。虽然他会失去这份收入,但他的确该退休了。至于生活还可以维持下去。

 

The employer was sorry to see his good worker go and asked if he could build just one more house as a personal favor. The carpenter said yes, but in time it was easy to see that his heart was not in his work. He resorted to shoddy (劣质的) workmanship and used inferior (差的,次等的) materials. It was an unfortunate way to end his career.

 

老板看到木匠要走了,感到很难过。他问木匠能否帮他个忙再建一座房子。木匠同意了,但他显然有点儿心不在焉了。他失去了往日的工作热情,他的工艺粗糙,选用低劣的材料。就这样,他以令人遗憾的方式结束了自己的职业生涯。

 

When the carpenter finished his work and the employer came to inspect the house and handed the front-door key to the capenter. “This is your house,” he said, “My gift to you.”

 

当木匠干完活,老板来验收时,他把房子前门的钥匙递给木匠,然后说:“这是我送给你的礼物。”

What a shock!What a shame!If he had only known he was building his own house, he would have done it all so differently. Now he had to live in the house he had built none too well.

 

木匠先是感到震惊,然后又感到羞辱。如果早知道他在盖自己的房子,他的干法会截然不同。现在他不得不住在这座不能令他感到满意的房子里。

So it is with us. We build our lives in a distracted (分心) way, reacting rather than acting, willing to put up less than the best. At important points we do not give the job our best effort. Then with a shock we look at the situation we have created and find that we are now living in the house we have built. If we had realized, we would have done it differently.

 

其实我们每个人都曾面对和这位木匠一样的情形:我们没能精心的打造自己的生活,我们宁愿消极的等待,也不愿积极的争取;我们宁愿中途放弃,也不愿追求完美。在关键时刻,我们不能全力以赴。因此,当我们生活在自己所建造的房子里,注视着眼前的一切时,我们不禁大吃一惊。如果我们能意识到自己在干什么,我们的人生会大不一样。

 

Think of yourself as the carpenter. Think about your house. Each day you hammer a nail, place a board, or erect (树立,建筑) a wall. Build wisely. It is the only life you will ever build. Even if you live it for only one day more, that day deserves to be lived graciously and with dignity (尊严). The plaque (匾) on the wall says, “Life is a do-it-yourself project”. Who could say it more clearly?

篇2

帕金森病(又称震颤麻痹),是一种常见于中老年人的神经变性病,男性稍多于女性,发病率随年龄增加而提高,世界每年约有500万人发病。中国有200万以上的人患有此病。

症状及病因

在脑组织的中脑有一群神经细胞,叫做黑质神经元,它们合成一种叫做“多巴胺”的神经递质,对大脑的运动功能进行正常调控。当这些黑质神经元变性死亡至60%以上时,大脑内的神经递质多巴胺便减少到不能维持调节神经系统的正常功能,便出现帕金森病的症状,主要表现为患者手脚或身体的其他部分的静止性震颤, 动作缓慢, 身体失去了柔软性,变得僵硬,不稳。多数患者起病缓慢,且前述表现逐一出现,逐渐加重。症状多先从一侧肢体出现,逐步扩展至对侧或全身。帕金森病具有一些典型的体征,如面具脸(面部表情减少、呆板)、慌张步态(走路时小碎步且越走越快)、小写症(写字越来越小)、行走时上肢无前后摆动等。在疾病晚期,患者僵卧在床,生活完全不能自理。

帕金森病本身不是一种致命的疾病,一般不影响寿命。如果患者没有得到及时和合理的治疗,很容易导致身体机能下降,甚至生活不能自理,最后出现各种并发症,如肺炎、泌尿系感染等。每个人的病情进展也不一样,个体差异很大,少数患者数年内就会迅速进展,而许多患者病程进展相对较慢,经过合理的治疗,15~20年还能保持较好的功能。

如果一个人有了静止性震颤、僵硬和运动迟缓中的任何两个症状,首先要排除是原发性(就是前边所讲的震颤麻痹)还是其他继发性帕金森综合征(如脑中风、脑外伤、脑肿瘤、甲减等引起)的临床症状,服用左旋多巴制剂后症状改善明显,在临床上可以诊断为帕金森病。但要真正诊断帕金森病需要脑组织的病理诊断,目前,没有一种仪器或化验检查可以诊断帕金森病。临床进行的一些检查(头CT和核磁MRI),主要是为了排除其他一些能导致帕金森病综合征的疾病。

迄今为止,帕金森病的病因仍不十分清楚,倾向于与年龄老化、遗传易感性和环境毒素的接触等综合因素有关。由于多种原因引起,病机不十分清楚,治疗无根治,多年来一直引起学术界关注。

目前的治疗手段

治疗一直是临床医生面临的挑战,已成为世界性的研究难题之一。

综合治疗是关键,目前治疗主要是多巴胺替代及神经保护治疗。左旋多巴药物治疗是治疗的金标准,但仅为症状缓解,黑质神经细胞仍在持续坏死。其死亡原因至今不详,尽管左旋多巴暂时缓解一些症状,但是,长期治疗(五年),50%病人将产生严重的并发症(如波动和小腿痛性肌痉挛、步态冻结及全身晨僵等运动障碍)。

(一)日常生活方面:

1.活动和积极锻炼:增强体质对延缓疾病进展大有裨益,肢体经常的活动锻炼有助于缓解关节的不灵活。

2.合理饮食:低蛋白饮食、减少肉类食品,多食含酪胺酸的食物,如瓜子、杏仁、芝麻、脱脂牛奶等,可促进脑内多巴胺的合成,有“开-关现象[指症状突然缓解(开期)与加重(关期)]”的患者,在食物中加入蚕豆,能使体内左旋多巴和甲基多巴肼复合药物(如息宁)的释放时间从通常的2小时延长至5小时。蚕豆的这种功能可能对帕金森病的治疗有所帮助,但仍需作进一步的实验证明。

3.医疗条件和家庭的关怀很重要:多数学者同意:饮食问题既不是帕金森病的主要原因,也不是治疗疾病的主要手段。均衡营养有助于病情的改善,尤其可以提高多巴制剂的吸收和生物利用度。这除了与帕金森病本身有关以外,很大程度上还取决于患者本身的心理素质、医疗条件和家庭的关怀。许多患者在患病后会出现情绪不稳、焦虑、恐惧或自暴自弃,这些都是由于对疾病缺乏认识所致。患者心理状况的好坏会影响治疗效果,医务人员和家属应向患者解释病情,增强其战胜疾病的信心;那些保持乐观心情、意志坚强和有和谐家庭关系、良好家庭护理的患者,加上合理及时的医治,病人大多都能保持长久的生活自理能力,病情发展相对较慢。该病治疗周期长,常需要终生治疗,至于疗效好坏则与患者的精神、情绪、身体素质等有关。因此,帕金森病的治疗常被喻为一项“复杂的系统工程”。

(二)药物治疗:

主要采用药物替代疗法,纠正多巴胺能和胆碱能系统的不平衡,常选用抗胆碱脂酶类药物(如安坦)和多巴胺替代剂(如左旋多巴、美多巴)、多巴受体激活剂(如溴隐亭)等等。这些药物的使用要从小剂量开始,精细搭配与调节,同时要注意副作用,治疗并发症。

(三)手术治疗:

在多年药物治疗失效后,可考虑立体定向的手术治疗,但要严格掌握适应症。

(四)针灸、按摩等,对维持肢体功能有一定帮助:

对于早期的病人尤其不可忽视运动疗法、物理疗法、心理疗法等,包括参加一定的体力劳动,加强日常生活中动作、平衡机能的锻炼,关节活动范围和肌力的锻炼,以及言语机能的锻炼。

(五)定期复查:

患者应定期到医院复诊,以便医师动态观察病情变化,及时调整药物和判断疗效。

篇3

技术背景

物联网技术在行业应用的比例逐年提高,并逐步渗透到生产制造、健康医疗、汽车等行业。万物互联时代正以极其迅速的脚步走进我们的生活。而“万物互联”实现的基础之一在于数据的传输,不同的物联网业务对数据传输能力和实时性都有着不同要求。

物联网通信技术有很多种,从传输距离上区分,可以分为短距离通信技术和广域网通信技术。短距离通信技术代表技术有Zigbee、Wi-Fi、Bluetooth、Z-wave等,典型的应用场景如智能家居;广域网通信技术代表有LPWAN(低功耗广域网),典型应用场景有智能抄表。低功耗广域网LPWAN技术又可分为两类,一是工作在非授权频段的技术:如Lora、Sigfox等。另一类是工作在授权频段的技术,如GSM、CDMA、WCDMA等较成熟的2G/3G蜂窝通信技术,以及目前逐渐部署应用、支持不同category终端类型的LTE及其演进技术。

关键技术

NB-IoT从立项到协议冻结仅用时不到8个月,成为史上建立最快的3GPP标准之一。在2016年9月完成性能标准制定、12月完成一致性测试后,几大运营商目前都在争相布局NB-IoT基站网络,因此,可以预见NB-IoT即将进入大规模商用阶段。

NB-IoT之所以可以解决室内覆盖增强、支持巨量低速率设备接入、低时延敏感、超低设备成本、低功耗和网络架构优化等问题,主要得益于其自身的几大关键技术。

NB-IoT支持独立部署、保护带部署、带内部署三种部署方式。通过三种不同方式的网络部署,NB-IoT充分有效地利用了频谱资源。

在3GPP R13版本中, NB-IoT仅支持FDD半双工Type B模式。而在Type B下,UE在发送上行信号时,其前面的子帧和后面的子帧都不接收下行信号,使得保护时隙加长,这对于设备的要求降低,且提高了信号的可靠性。通过NB-IoT的半双工Type B模式,有效降低了终端的成本和功耗。

NB-IoT系统下行链路的传输带宽为180kHz,采用现有LTE相同的15kHz子载波间隔,下行多址方式为OFDMA、帧结构和物理资源单元也都尽量沿用现有LTE的设计。

针对180kHz下行传输带宽的特点及满足深度覆盖的需求,NB-IoT系统缩减了下行物理信道的类型,重新设计了部分下行物理信道、同步信号和参考信号。NB-IoT系统上行链路传输带宽为180kHz,支持两种子载波间隔。3.75kHz和15kHz。对于覆盖增强场景,3.75kHz子载波间隔比15kHz子载波间隔可以提供更广的覆盖范围。

上行链路支持单子载波Single-tone和多子载波Multi-tone传输,子载波间隔可配置为3.75kHz或15kHz,对于多子载波传输,采用15kHz子载波间隔。上行都是基于SC-FDMA的多址技术。对于15kHz子载波间隔,NB-IoT上线帧结构和LTE相同,对于3.75kHz子载波间隔,NB-IoT新定义了一个2ms长度的窄带时隙,一个无线帧包含5个窄带时隙,每个窄带时隙包含7个符号,并在每个时隙之间预留保护间隔,用于最小化NB-IoT符号和LTE探测参考SRS之间的冲突。NB-IoT系统上行也缩减了上行物理信道类型,重新设计了部分上行物理信道。

覆盖增强技术

在3GPP标准中,要求NB-IoT的路径损耗可高达164dB,以满足布建在小区边缘或地下室等信道质量较低的NB-IoT终端设备。涵盖范围延伸(Coverage Enhancement, CE) 共分为三种等级,分别为达到可对抗最大耦合损失MCL为144dB、154dB、164dB的信号能量衰减。基站与NB-IoT终端间会根据所在的CE Level来选择相对应的信息重复传送次数。

NB-IoT为了解决深度覆盖问题,通过基站与NB-IoT终端之间采用较少数量的子载波与将欲传递的数据作重复传送以利于接收端提高正确解出数据的成功率。依照目前规格的规范,在随机存取信道、控制信道与数据信道所传递之信息的重复传送次数最高可高达2048次。

NB-IoT的重传机制,不是简单的数据重复,而是将数据进行重新排序后再传输的方式,类似于时域分集的理念。

低功耗技g

NB-IoT借助PSM和eDRX可实现更长待机。PSM(Power Saving Mode) 节电模式。R12中新增的功能,在此模式下,终端仍旧注册在网但信令不可达,从而使终端更长时间驻留在深睡眠状态以达到省电的目的。eDRX(Enhanced Discontinuous Reception)延长非连续接收。R13中新增的功能,进一步延长终端在空闲模式下的睡眠周期,减少接收单元不必要的启动,相对于PSM,大幅度提升了下行可达性。NB-IoT目标是对于典型的低速率、低频次业务模型等容量电池寿命可达10年以上。根据TR45.820的仿真数据,在耦合耗损164dB的恶劣环境下,PSM和eDRX均部署,如果终端每天发送一次200字节报文,5瓦时电池寿命可达12.8年。NB-IoT虽然是基于LTE技术的演进,但是,NB-IoT的技术特点决定了它自身的独特之处,因此,NB-IoT的测试同样也需要完全按照3GPP标准的要求进行。

面临挑战

网络未动,测试先行,对于NB-IoT产业也同样如此。相比于现在的LTE技术,NB-IoT的信道宽带、双工方式、无线信道类型、帧结构、资源分配方式等方面均发生了改变,相应的空闲模式流程、随即接入、RRC连接管理、连接重配置、无线链路监测以及可能的重定向等流程也都进行了调整。

因此,在功能方面无法复用LTE测试仪表,需要将NB-IoT视为一项全新的技术进行测试,并覆盖所有的协议功能点。而在RF性能方面,同样将涉及各类发射机/接收机、解调等测试项目。

在通信网络的部署当中,测试仪器对于网络性能的验证至关重要。罗德与施瓦茨公司一直走在NB-IoT测试的最前沿,在2016年6月NB-IoT标准冻结之日,罗德与施瓦茨测试仪表的NB-IoT功能也随之正式。2016年底,与三大运营商和几大设备厂商(包括中兴、华为、爱立信、大唐等)之间就已经完成了NB-IoT基站的摸底测试。

篇4

用发展工业的理念抓农业

记者:2011年绵江新农村示范片农业总产值预计达到5.46亿元,增长50%以上,特别是农民年人均纯收入预计达到10800元,增长26%左右,增幅很明显。我在大康镇星火村马兰种植基地、西屏乡獭兔循环产业生态园实地调研印象很深,没有想到作为传统工业市的江油农业也发展得风生水起。

宋开慧:其实早在2007年,江油市委、市政府就研究制定了《关于推进现代农业发展的意见》,确立了全市蔬菜、獭(肉)兔两大特色产业和优质粮油、生猪、优质林果三大传统主导产业的“2+3”大产业、大基地、大带动发展战略,着力构建现代农业大市。之所以制定这样的发展战略,是因为江油的地形地貌90%以上是丘陵和山区,只有10%的平坝,全市88万多人口中,农村人口占到近60万,两极分化严重。同时,经过科学分析,对比仁寿、安岳、三台、射洪这些百万人口的农业强县,我们认识到,只有通过实施差异化竞争策略,用发展工业的理念抓农业,抓住优势产业、龙头企业,实施标准化生产,才能有效地促进农民增收。

记者:培育多元带动主体,引导农民广泛参与是江油版新农村建设的一个显著特色,在这方面,你们的具体做法有哪些?

宋开慧:新农村建设,农民是参与主体和受益主体。在推进现代农业发展中,我们的做法概括起来有这样几条:首先是大力培育龙头企业,实施产业化带动。目前,全市已培育和发展了清香园、皇钦沅、五洲农业、德华皮革、恒源药业等一批龙头企业,覆盖了蔬菜、粮油、林果、獭兔、生猪产业,形成了完善的种子(种苗、种畜)提供、产品加工、冷藏保鲜、物流配送产业链条。目前,全市有绵阳市级以上重点龙头企业38家,带动11.5万农户,建成40万亩种植业基地、2000万头(只)养殖基地。其次,加大农民专业合作社的培育。全市共培育了生产联合、资金股份、土地股份等多种形式的农民专业合作社220个,组建了蔬菜、獭兔两个产业合作总社,社员总数达到3.5万余人,带动农户7万多户,建成基地32万亩,为农民创收19.8亿元,带动农户户均增收1.3万元。第三,大力推进现代农业产业园建设。目前已基本建成九岭蔬菜、武都香葱、新安水果等7个现代农业产业园,以此为新品种新技术示范推广平台、种苗繁育基地、产品加工基地、物流中心的产业带动载体,辐射带动周边区域加快形成规模农业产业发展区。

农民主体作用调动起来后,潜力大得很。拿方水乡西林村来说,政府投入200万元解决了基础设施问题,全村老百姓主动调整农业结构,大力发展草莓种植,现已建成草莓基地近千亩,突出了“一村一品”的特色,仅此一项,就使全村农民年人均纯收入一跃超过万元,成为当年全市的3个万元村之一。

创新机制,切实保障农民利益

记者:这几年来,你们是如何深化机制体制创新,切实保障农民利益的?

宋开慧:首先是加大政府对农业、农村发展的投入。农业投入大、周期长、见效慢,需要政府大规模持续投入。过去的做法不但没有持续投入,而且投入也很分散。

中央、省、市都把“三农”工作作为“重中之重”,作为一项长期战略来抓,因此我们编制预算时,不但持续投入,而且还建立了一套完善的财政投入增长机制,同时,整合国家、省级项目资源,引导民间资金投入,算下来每年都有数十亿元的投入。拿农业基础设施建设这一块来说,近3年全市整合项目资金累计投入86亿元,完成微型水利工程建设,新增和改善灌溉面积11.5万亩;硬化乡村道696公里、机耕道425公里;实施土地整理18万亩等。这为带动农民发展现代农业、带动农民持续稳定增收提供了强有力的支撑。

第二是持续探索机制创新。一是完善利益机制。就是说,全面建立了“龙头企业+基地+农户”、“龙头企业+专合社+农户”、“市场+专合社+农户”的利益联结机制,实行二次、甚至多次分利制度,保障参与农户享受到最大利益。二是深化组织模式,成立了江油市现代农业蔬菜产业园、江油市现代农业獭兔产业园两个管理机构,挂牌九岭镇和西屏乡,实行两块牌子、一套人马,赋予跨乡镇区域的产业发展管理职能。三是创新经营模式。我们探索了资金股份合作、土地股份合作等多种合作经营模式。比如在獭兔产业发展上实行社员资金入股、共建小区、统一饲养、统一核算、“保底+二次分利”模式发展养殖合作社19个。而在大康镇星火村实行土地股份合作,以村组建农业(种植)、养殖、劳务三大公司,统一公司化经营,按股分红,实现农民增收。2011年,该村农民人均纯收入11000多元。

记者:市场是企业生产经营、带动农民发展现代农业的起点和归宿,闯市场离不开品牌,这些年你们打造了哪些全省及全国知名品牌?

宋开慧:到目前,打造了“江油蔬菜”、“江油獭兔”、“江油仔猪”、“中坝附子”、“中坝酱油”等系列全省及全国知名品牌。

“十二五”的目标是实现农民收入翻一番

记者:通过近几年的加快发展,目前全市已建成商品蔬菜基地25.8万亩,成为全省现代农业产业基地20强县;年出栏獭(肉)兔达到600万只,成为西部獭兔第一县和国家级标准化獭兔养殖示范区;能繁母猪数量已超过10万头的发展目标,年产仔猪200万只,出栏生猪80多万头,已成为四川种猪繁育大县,被列为全省畜牧产业20强县等。应该说农业现代化建设成果斐然,从中有哪些收获和启示?

宋开慧:是的,成效比较显著。2011年,全市农民人均纯收入达到了7150元,增长18%左右,农民人均纯收入超万元村也达到了20多个。这5年我们获得的农业奖励确实囊括了省、市两级所有奖项,2010年还获得省上农业发展资金2000万元奖励。我们也及时总结了发展经验。首先,党委和政府要把“三农”发展放在各项经济社会发展工作的首位来抓。第二,要明确思路,正确决策。我们坚持不搞“小而全”,而是注重规模化、特色化、标准化、现代化,突出抓好几大特色主导产业,建设大基地、发展大产业、适应大市场,凸显规模效益。第三,要不断创新和完善体制机制,为现代农业发展、新农村建设提供坚实的制度保障。

记者:实现农业现代化就是一项最大的民生工程。“十二五”期间是江油全面建设小康社会的关键阶段,如何进一步夯实“三农”工作?

篇5

(河南 安阳 455000)

【摘 要】计价工作是工程项目管理中的一项重要工作,主要分为对上计价和对下计价。本质上可以概括为资金的流入和流出。这两项工作开展的基础是基于对工程项目的分析、施工风险的预估,只有了解和注意常见的计价工作注意事项,才能做好整个项目的计价工作,确保项目顺利实施。

关键词 工程项目;计价工作;注意事项;分析

Project Measurement Bulletin Work Matters Needing Attention and Analysis

WANG Ke

(Anyang Henan 455000, China)

【Abstract】Measurement bulletin work, which is consist of 2 parts, namely measurement bulletin to the employer and measurement bulletin to the construction teams plays an important role in the project management. Essentially, it can be summarized as the inflow and outflow of funds. The foundation of the work is based on the of the project analysis, construction risk estimation. Only understand and pay attention to the common matter that needs to notice, can the the entire project measurement bulletin work be done well, which ensures the smooth implementation of the project.

【Key words】Project; Measurement bulletin work; Matters needing attention; Analysis

作者简介:王珂(1984—),女,河南安阳人,工学学士,助理工程师,主要从事工程造价、招投标管理、计划合同管理方面的工作与实用方法研究。

一直以来工程项目的造价工作体系,具体为成本、计价、计划、合同四大版块。其中计价工作是项目造价工作的基础,计价工作在具体工程项目中,根据业务对象又分为对上计价、对下计价两个部分。开展对上计价,确保资金正常流入;开展对下计价,产生预期利润。

因此,站在业主、施工、监理、咨询的不同角度,对工程项目计价工作的注意事项进行认真总结,并结合具体业务进行实用分析,非常具有现实意义。

1 对上计价

对上计价就是要钱,这是确保一个工程项目正常运转的基础,这项工作是否及时、质量好坏将关系到工程项目的正常生产、成本利润实现等。主要工作内容是根据合同清单,依据实体工程完成进度进行对上计价。

1.1 熟悉计价规则和合同清单

在工程项目进场后,要及时分析清单中哪些是特殊报价(为了调整总报价)、哪些是隐含报价(单价包含的工作内容)、组价的方式、临建及标准化工地、安全管理、技术提案、间接费核算等方面的思路,以便清晰实际计价工作的开展的方向,从项目利润最大化的角度对项目施工方案提出指导意见。

1.2 运用二次经营策略

二次经营,就是在一次经营投标报价的基础上,基于对合同清单和计价规则理解的基础上,综合分析清单报价对于项目实施的利弊。对于优势报价,我们要确保工程数量的足额完成甚至变更设计多完成,从而确保收益。对于劣势单价,要通过改变施工方案、优化设计、或者单价变更等途径来规避风险。

1.3 重视质检资料的汇编和签认工作

在合同清单的范围下,根据工程实体编制工程量三级台账,即投标清单工程量台账、施工图工程量台账、现场实测工程量台账,并根据台账录入对上计量台账,然后对照台账采取销号的方式及时完成质检资料的编制。

质检资料的汇编是一项复杂的工作,工程项目必须设立专人负责对上计价资料的管理工作。在现场实体工程完成后,要及时完成现场实体工程的资料编制和监理签认,确保及时提交质检资料。

1.4 变更工程的对上计量工作

工程项目在实施过程中,不可避免的会因为地质变化、设计缺陷、方案变更、业主变更需求等方方面面的原因,发生各类工程变更,建设工程领域常见的工程变更大致分为以下几类情况。

1.4.1 地质变化

如果是地质变化造成建筑基础需要进行换填,或者变更基础的施工方式等,需要保存好变更设计文件、会议纪要,现场地质影像,并做好相关文件的签认。

1.4.2 设计缺陷

如果是设计缺陷引起的工程变更,需要保留好图纸审查报告、会议纪要、设计院反馈、确认的工程量变更对比表等相关文件。

1.4.3 方案变更

在实际工程项目实施中因为施工的实际条件的变化,需要对施工方案进行变更,此类变更有些会对项目的成本产生明显的影响,常见的情况有:调整工程质量等级发生的措施费,建筑材料标准变更等。这时就需要对单项工程或者是项目整体,进行施工成本、工期成本、资源成本等的全面评估和测算,重新调整工程单价。

1.4.4 注意工作的及时性特点

变更工程的对上计价特别要讲究及时性,因为工程资料的签认过程往往是一个繁琐耗时的过程。期间,很容易发生各类变故,诸如相关见证人员离开工程、资料修改等。因此,针对变更工程的对上计量要注意对上计价的及时性特点,维护项目利益。

1.5 建立计价台账

对上计价工作是一个周期较长贯穿项目始终直至收尾的工作,需要建立起整个工程项目的对上计价台账。这个台账应该是根据合同清单和工程量三级台账,建立起的被监理单位、业主单位认可的台账。

每期计量采取销号的方式计量,并需要相应的批复和拨款台账,其中变更工程对上计价要单独建立台账。从而确保漏计、现场已施工未计价、批复计量未拨款、资料整改下棋再报等具体情况的详细记载。

2 对下计价

对下计价就是花钱,这样工作好比一个项目的“水龙头”,该支付的钱必须及时支付,才能推动项目的进展;不能浪费的就一滴也不能浪费。同样,对下计价工作需要专项开展工作,认真进行工作梳理,建立完成的工作体系。

2.1 合理测算对下计量单价和任务分包

合理测算对下计价单价是项目顺利实施的内在动力,前提是确保项目本体和工程实施者的双方共赢。只有做到这些,项目的具体实施者才有内在动力,项目本级进而实现利润和工期进度的目标。

想要利用好对下单价的杠杆作用,就要充分考虑人员工资、设备台班单价、施工材料市场行情、施工工艺、征地拆迁及水电等外界影响等,以及适当的利润空间,一个合理单价才能顺利被双方接收,进而促使项目的顺利实施。

2.2 对下计量单价的主要特征

对下计量单价因为它是在项目本级和下级之间实行的,具有内部性、协商性、综合性三大特征。项目下级实施者在完成一定量的工程数量获得利润的同时,应该是安全措施、文明施工、职业健康、环境保护、临建设施等各项费用都包含在其利润之中。

2.3 重视对下计价的及时性

对下计价是由项目本级牵头开展的工作,主动权掌握在项目管理者的手中。如何开展好这项工作,要求项目本级计价人员灵活掌握,并且及时对下计价。同时,为了确保项目的经济状况良性可控,规避相关隐性财务风险,也要求按时完成对下计价工作。

2.4 透过对下计价,分析项目管理状况

对下计价工作不仅仅是站在项目本级的角度上,开展对下计价工作。更重要的是,我们能够通过对下计价工作的开展,分析出当月的材料消耗、间接费、人员工资等间接费等指标,便于项目管理者及时调整施工安排。

3 结束语

项目的计价工作,不仅仅是做好工作本身,更要透过工作的开展,深入研究分析其背后的意义,从而促进项目管理的各项工作有针对性的开展,进而取得丰硕果实。

以上总结的对上计价和对下计价的注意事项和分析,是基于多个工程项目的从业实例,站在业主、监理、施工方、咨询等不同角度上的提炼,这些工作思路和方法具有很强的针对性和实用性,对工程项目的计价工作有很强的借鉴意义。

参考文献

[1]刘晓君.建设项目投资决策理论与方法[M].北京:中国建筑工业出版社,2009-07-01:96-113.

[2]全国造价工程师执业资格考试培训教材编审委员会[M].6版.北京:中国计划出版社,2013-05-01:182.

篇6

程,而且建筑规模越来越大,建筑外形也是越来越奇特,比如备受争议的中央广播电视台。在建筑工程的整体施工过程中,各种施工技术及设计对整体建筑都产生重要的影响,因此采取行之有效的的建筑技术及施工形式能够很大程度上提高建筑物的整体质量和有效缩短工期。本文主要对建筑技术中的土方工程施工技术以及绿色建筑的高科技技术等方面出现的常见技术问题进行了详细的阐述和分析。

关键字: 工程项目;施工技术;问题;影响

Abstract: with the reform and opening up, the rapid development of China's economic and social, speeded up the process of urbanization of our country directly, and the construction scale is more and more big, the building form is also more and more strange, such as the controversial the central radio and TV station. In the whole construction process of construction projects, all kinds of construction technology and design have important influence on the overall architecture, so take effective construction technology and construction form can largely improve the overall quality of the buildings and effectively shorten the construction period. This article mainly discusses the construction technology of the earthwork construction technology and green building technology and so on the common technical problems are analyzed in detail and.

Key words:engineering projects; The construction technology; Problem; Influence;

中图分类号:TU74文献标识码:A文章编号:

一个建筑或一个建筑群的建成,需要许多分部工程组的大力配合。而这些分部工程的施工,都可以采用不同的施工方案,不同的施工技术和机械设备,不同的劳动组织和施工组织方法来完成的。如何根据施工对象的特点和规模,地质水文和气候条件,机械设备和材料供应等客观条件,从运用先进技术,提高经济效益出发,做到技术和经济统一,选择各分部工程最合理的施工方案, 研究其施工规律,是建筑施工质量的保障,建筑施工技术这一环节的运用起着至关重要的作用,首先说一下土方工程施工技术这一方面。

建筑施工中的土方工程施工技术

土方工程施工的分类

在建筑工程中土石方工程是建设工程施工的主要工程之一。土方工程包括一切土的挖掘、填筑和运输等过程以及排水、降水、土壁支撑等准备工作和辅助工程。 最常见的土方工程包括场地平整、基坑(槽)开挖、地坪填土、路基填筑及基坑回填土等。包括土石方的开挖、运输、填筑、平整与压实等主要施工过程,以及场地清理、测量放线、排水、降水、土壁支护等准备工作和辅助工作。

土方工程施工时应注意的问题

土方工程在实际工程中,对计算所得的设计标高,还应考虑下述因素进行调整,此工作在完成土方量计算后进行。考虑土的最终可松性,应相应提高设计标高,以达到土方量的实际平衡;还应考虑工程余土或工程用土,相应提高或降低设计标高;根据经济比较结果,如采用场外取土或弃土的施工方案,则应考虑因此引起的土方量的变化,需将设计标高进行调整。场地设计面的调整工作也是比较繁琐的,如修改设计标高,则须重新计算土方工程量。土方工程施工往往工程量大,劳动繁重和施工条件复杂等特点,土方工程施工又受气候、水文、地质、地下障碍等客观因素的影响极大,不可确定因素也很多,施工条件也较为复杂。因此在组织土方工程施工前,必须详细分析与核实各项技术资料,比如工程地质、地下管道、水文地质、电缆及土方施工图等,相关人员必须进行仔细负责的现场调查并根据现有施工条件,制定出切实可行的施工方案,经济合理的设计图纸。土方工程的顺利施工,不但能提高土方施工的劳动生产率,而且为将要实施的工程奠定了一个良好的基础,对加快基本工程的建设速度有极大意义。

另一方面地基的施工技术更是决定着一个工程的成败,地基打不稳出现质量事故问题往往是无法弥补的,造成的不仅仅是经济上的巨大损失,而是直接危及人们的生命和财产安全。地基的处理方法一定程度上讲,建设工程一旦建成投入使用,由它所带来的损失,远比地基基础工程建设所要投入的成本大得多。不管是选择场地、勘察设计,还是施工质量问题,地基基础工程一旦出现质量问题,往往会引起地基失稳,建设工程整体结构的破坏,是建设工程致命性、毁灭性的重大质量事故。

当地基土为淤泥,上层土层又较为单薄时,应采取避免施工中对淤泥 和淤泥土扰动的措施。如果是冲填土、建筑物垃圾废料,当均匀性和密实度较好时均可利用作为持力层,对于有机质含量较多的生活垃圾和对基础有侵蚀性的工业废料等杂填土,未经处理不能作为持力层。在选择地基处理方法时,应综合工程地质和水文地质条件、建筑物对地基要求,建筑结构类型和基础型式,周围环境条件、材料供应情况、施工条件等因素,经过技术经济指标比较分析后择优采用。

在进行地基处理时,必须采取有效措施,加强局部结构的刚度和强度,为的是增加建筑物对地基不均匀变形的适应能力,其中对已确定的地基处理方法,进行必要的测试,同时为施工质量提供相关依据。地基处理后,建筑地錾变形应满足现行有关规范要求,并在施工期间进行沉降观测。

二、低碳建筑中的施工技术

随着国家倡导可持续发展的推进,节能型建筑势在必行。目前低碳建筑已逐渐成为国际建筑界的主流趋势。下面是关于节能建筑技术的简要介绍,并就这一技术介绍了低碳建筑施工节能技术方面的一些注意事项及处理。

1、低碳建筑的分类所谓的低碳建筑是指在建筑材料与设备制造、施工建造和建筑物使用的整个生命周期内,减少化石能源的使用,提高能效,降低二氧化碳排放量。低碳建筑采用结构体系、地能热泵系统、智能布线配电系统、太阳能综合利用、节能门窗、雨水收集中水利用及其他低碳使用技术。

低碳建筑技术不仅可以大幅度降低能耗,同时可使建筑碳排放水平降低50%左右。它主要有以下几种技术形式组成。外墙节能技术包括墙体的复合技术有内附保温层、外附保温层和夹心保温层三种。我国采用夹心保温作法的较多;在欧洲各国,大多采用外附发泡聚苯板的作法,另外还有屋顶节能技术即利用智能技术、生态技术来实现建筑节能的愿望,如太阳能集热屋顶和可控制的风屋顶等。制冷和照明是建筑能耗的主要部分,如使用地(水)源热泵系统、置换式新风系统、地面辐射采暖;新能源的开发利用:太阳能热水器、光电屋面板、光电外墙板、光电遮阳板、光电窗间墙、光电天窗以及光电玻璃幕墙等。

2、低碳建筑技术注意事项及处理

(1)建筑门窗的节能设计。据统计资料,在我国既有的高耗能建筑中有40%的耗能是通过门窗散失的。因此,解决好门窗节能的问题相当重要。门窗的节能设计主要考虑以下几个方面: ①控制建筑不同朝向的窗墙面积比。②设置各种形式的外遮阳。③合理地组织门窗的通风换气,尽量采用自然通风,少用、不用空调通风;④严寒、寒冷地区建筑的外门宜设门斗或采取其它减少冷风渗透的措施,其它地区建筑外门也应采取保温隔热节能措施;⑤选择节能性能高的建筑门窗和幕墙。 (2)建筑物围护结构细部的节能设计。细部的节能设计对于建筑物的整体节能也非常重要,应从以下各部位着手:①热桥部位应采取可靠的保温与“断桥”措施;②外墙出挑构件及附墙部件均应采取隔断热桥和保温措施;③窗口外侧四周墙面应进行保温处理;④门、窗框与墙体之间的缝隙,应采用高效保温材料填堵;⑤门、窗框四周与抹灰层之间的缝隙,宜采用保温材料和嵌缝密封膏密封;⑥采用全玻璃幕墙时,隔墙、楼板或梁与幕墙之间的间隙,应填充保温材料。

另外合理选用建筑节能材料也是全面实现建筑节能的一个重要方面。建筑材料的选择应遵循健康、高效、经济、节能的原则。

结论:

总而言之,建筑施工贯穿一个工程的始终,是一项工程成功的保证之一,而施工技术的运用技巧也随着科学技术的迅猛发展,将会有更多优良的建筑材料和先进的建筑技术被运用到现代建筑施工工程当中。由于人们对建筑工程质量与功能要求的不断提高,因此充分利用现有的技术手段与高水平管理人才,不断加强建筑工程的技术管理和施工现场的管理迫在眉睫,所以我们要坚持科技创新,实现更好的建筑技术开发,为我国的现代建筑事业做出应有的贡献,此外还应更加注重研究开发和推广应用低碳建筑。

参考文献:

篇7

1.项目管理概述

项目管理是工程项目从计划、可行性分析到设计、执行和完工考评等整个过程统。它主要包括以下起始阶段、执行阶段和结束阶段。起始阶段为整个项目准备资源和制定各种计划;执行阶段是监督和指导项目的实施、完善各种计划并最终完成项目的目标;结束阶段是对项目进行总结、评价及各种善后工作。20世纪50年代后期,美国出现了关键路线CPM即统筹法和计划评审技术(PERT),是近现代项目管理成熟的重要标志。

2.路桥工程管理的指导思想

一般的路桥公司,不太可能有足够的资金投资这种投资巨大、见效慢的工程,所以这就需要借助各方面的力量来进行路桥筹资。通常情况下,具有社会公益性投资的路桥工程建设首先得基于结合城乡布局和城乡规划的基础上,分析其社会效益的可行性,在此基础上做是否投资的决策。大程度上,这种决策属于政府投资的,注重社会效益的公益或半公益。

工程项目管理者应该在以下的几个方面来加大管理:第一个是在项目工程进行规划时,统筹兼顾和确定投资、效率、质量三大目标的标准要尽可能的合理。在三项目标之间要进行慎重的考虑,不断的进行权衡利弊和反复协调,只有这样才能做到需求与目标的统一。第二个是要全方位的进行系统控制整个工程项目实施,这样做的目的是最大限度的防止发生盲目追求单一目标击或干扰其他目标的现象,避免最后对整个工程产生影响。

3.路桥工程管理实施时遇到的问题及若干策略

3.1 项目管理方法和项目实施方法

路桥项目管理方法是关于如何进行路桥项目管理的方法,是可在大部分路桥项目中应用的方法,它是对路桥工程项目的整体规划。而项目实施方法指的是在项目实施中为完成确定的目标如某项路桥工程的设计、施工而采用的技术方法。项目实施方法所能适用的项目范围会更窄些,通常只能适用于具体路桥项目的设计和实施。在一个合理的项目组织机构中,必须保证项目经理和体系结构设计师的有效配合。

3.2 路桥工程在投资方面的控制

各阶段的测定及控制方式分别被称作:投资估算,具体有项目建议书投资估算,工程可行性投资估算、概预算,比如设计概算,修正概算及施工图预算,标底、合同价、工程决算。为了在路桥工程管理中实现经济效益最大化, 业主事前需要聘请专业咨询人员研究投资的最佳机会,预算项目投资额,分析项目投资回报率并选择最优投资方案以及进行工程投标标底的编制、投资额的变更幅度控制、竣工决算审查办法,项目建成后的新增固定资产价值的核定、投产项目投资效果的分析考核和项目使用费的经济分析与管理等一系列工作。可以说,路桥工程投资控制是一种“事前”行为:一方面,是实现固定资产更新、改造或增长,另一方面,也是以一定的资金投入为代价, 是一项投资者由此取得满足社会需求,增加资金收益和国民收入的经济活动。此外,投资涉及路桥工程项目的投资机会研究、可行性研究、设计、施工和运营,直到工程项目完成,贯穿整个路桥工程项目各个阶段。且每个阶段及分阶段均需作不同的投资测定。

4.路桥项目工程管理的措施

4.1 投资前选择正确的投资方案

在纷繁众多的投资机会面前,路桥公司应当通过加强可行性研究即从多个层面对投资项目进行认真分析,最终做出决策。通常情况下,路桥项目管理者首先要准确把握社会政治经济形势,重点分析国家经济政策、资源供求等情况,正确选择投资的时机。其次,从企业选择项目决策上,主要选择正确的分析方法, 利用各种分析指标,测算各种投资预期收益率,现金流量等指标,来选择正确的投资方案。

4.2 分散项目风险

任何经济活动都具有相应的风险,它是由不确定性引发的。高效的路桥项目管理就是要通过一系列的方式方法,多元化的投资组合控制风险,使其发生的概率降到最小。一般来说,多个项目分散投资风险小于单个项目的投资风险。路桥工程建设筹资与其他用途筹资一样,必须进行成本、风险与效益的权衡,兼顾时效性与科学性。这需要管理团队同时具备筹资与投资管理的统一:即筹资成本、筹资风险与效益回报的权衡。在适度的风险下,做到筹资成本最低,实现投资效益最大,作为一种事前的决策行为, 投资效益回报是可以在投资之前通过过可行性分析预算出的结果。因此,在筹资决策中,效益性原则就是做到筹资成本最低,在筹资财务上,筹资成本最低等价于筹资的结果将得到最优的财务资本结构。

4.3 提高路桥工程质量,把效率放在优先位置

提高路桥工程的质量和效率可以从两个方面考虑,其一是提高工程的投资效益,即促使建设工程收益最大化,一个是降低工程投资的建设成本,即促使路桥工程成本最小化。投资效益包括经济效益和社会效益,投资的效益控制重点在于对工程项目在其设计前进行经济和技术的可行性分析;而工程项目的成本控制不仅包括工程设计时对其成本进行控制,还应将重点放在对工程施工阶段的成本进行控制。

4.4 加强专业化发展与国际高水品项目管理团队的交流合作

篇8

关键词:装修工程;电气施工;注意事项

中图分类号:TU767文献标识码: A 文章编号:

装修工程在建筑工程中师一项必不可少的工程任务。然而一些装饰企业在发展起步上却比建筑企业更晚。在目前一些大城市地区,规模较大,经验较为丰富的装饰企业数量相对较少。而对于另外一些规模较小,经验较少的装饰企业,其施工的质量、队伍技术水平、团队管理能力则与相关标准要求不符,其单位的电气施工人员对于相关的施工标准和制度了解不够完善彻底,这也使得施工单位在电气施工过程中屡屡出现问题,电气工程的质量得不到保障,甚至给装修工程留下了严重的安全隐患。本文就电气施工中的一些问题和注意事项进行了分析探讨。

1、施工人员盲目施工和设计

在现在的一些房地产市场中,毛胚房大量流通。这些没有经过装修和加工的房子,需要居民根据自身需求和标准进行装修。一些居民为了节约装修的费用,缺乏理性,擅自雇佣一些资质和技术不达标准要求的施工单位。这些施工单位的施工人员素质低下,施工技术水平低下,缺乏相关的理论培训和实践锻炼,这也让一些装修工程在施工过程中达不到居民的正常要求和国家规范要求。电气施工中电气设备种类繁多,其安装更需要结合电气负荷的计算进行科学施工,如果让这些水平资质不够的施工单位对其进行施工,那么建筑本身的安全问题和质量问题都得不到保障,甚至埋下严重的安全隐患。

以下是一些电气施工的工序:

1.1 建筑装修是一项提高人们生活水平,满足人们居住条件和内心追求的一项建筑工程,对现代社会的居民而言,是一件十分重要的大事。因此建筑的装修工程需要选好施工单位,选择一个有资质、高技术的施工团队,有利于保证居民自身房屋的功能特点,对居民的自身利益和安全也起到了保障。在电气施工方面,装修单位需要根据居民房屋的功能特点进行装修设计,电气设备的安装也需要结合建筑物的电气负荷大小进行科学合理地安装。一些人对于电气负荷的认识并没有深入去理解,盲目地安装过多的电气设备,造成了电气事故的发生。一般的建筑物在建筑完工之后,自身安装的变压器和供给电源的电气负荷是有所限制,过多地安装电气设备,则会造成建筑物的自身负荷严重超标,电源和变压器的自身负荷加重的情况下,建筑物的使用居民的安全问题也将得不到保障。

1.2 房屋的装修图纸在设计完之后,需要选择资质较好、装修技术较高的施工团队进行装修施工。一家拥有好的工作作风和职业精神的装修单位,才能真正对一项建筑装修工程认真负责和落实,。装修单位在施工之前需要先配置一名较为专业的电工人员,对施工现场进行认真严格监督。有一些居民为了节省装修的费用,将房屋的装修工程交给了一些不正规的装修公司。这些装修公司的工作作风和职业精神都较为低下,对居民的房屋装修设计和施工没有认真落实和负责,经常为了赶工期而忽视房屋的装修施工质量,居民的房屋功能和特点也因此被埋没。一些电气施工队伍可能甚至会因为居民对电气知识的不了解而对电气施工做手脚,施工人员偷工减料,盲目进行电气设备的安装。这样的装修工程在完工之后存在着大量的安全隐患,居民的生活要求和身体健康得不到任何的保障,有些施工队伍甚至在施工过程中因为自身的忽视导致了一系列的安全事故的发生,装修工期被不断地拖延,对居民和单位都造成了巨大的影响。

1.3 电气施工工程的装修质量需要相关的装修单位和建筑用户引起重视,加大监督力度和控制手段。建筑物在电气施工之前,单位人员要认真选择合适的电气材料,保证施工材料的质量的性能。施工材料在采购过程中,单位人员不应该以材料的价格为重点,而应该更多的关注材料的质量和用途。质量太差的电气材料,在施工过程中会对建筑物的整体施工质量造成影响,存在大量的安全隐患,甚至危及居民的生命安全。因此,材料的采购和选择需要认真进行,最好选择规模较大、质量较好的厂家进行购买。

1.4 电气施工工程在施工过程中,装修单位对一些施工问题要进行认真探讨和分析,对不太了解的难点要进行专业书籍的查阅,进行分析再进行措施定夺,切不可因为工期的问题而盲目应付,这样对工程的质量和居民的安全都是不负责任的体现,甚至也会导致工程出现返工现象。

2、施工中的常见质量问题

2.1线导管的敷设

装修施工图纸在设计完工后,根据图纸的要求一般会对居民房屋的插座、灯具等电气设备进行适当的增加,相应的电气线路的数量也会有所增加。这些增加的线路需要穿电线管,这样能够对导线起到保护作用,对后期维修也起到了有利作用。一些施工单位为了自身利益,将设计图纸中的导线直接敷设于吊顶和地面,这样将无法保证导线的正常使用寿命,导线出现问题也将无法进行维修。有一些施工单位对导线进行了穿管保护,然而这些电线管的质量和性能并不符合相关的要求和规定,电线管壁太过薄弱,弯曲处没有存在弯曲度被直接折弯,电线管的弯曲半径太小,连接部位没有接头,敷设导管布置不够规则,强电和弱电使用同一条线路等。这些常见的导线安装问题都需要施工单位多加注意。弹簧弯管的选择需要结合PVC管的自身内径数值,不同的内径对应着不同的规格型号。只有这样,才能保证管子在投入使用后不会出现褶皱、开裂和变质情况。配管的配置也有所要求,对于只有一个90度弯角的明配管,其弯曲半径需要大于或等于管外径的4倍,而相同情况下的暗配管的弯曲半径则需要大于或等于管外径的6倍。PVC线管在接头部位要选择合适的对接方法,一般建议选择用套管进行对接,并加以粘牢固定。对于强电和弱电的线路的线路安装需要分开进行敷设,切不可在同一个管道内进行敷设安装,造成强弱电路电磁波的互相干扰。

2.2 导线的敷设

导线的敷设在电气施工中也是需要加强注意的,其敷设过程中需要的分支回路不能过少,一般情况下要求灯具设备为一路,空调为两路,插座为三四路,这样做可以保证回路与回路间不会互相影响。一些装修单位在装修过程中分不清导线的颜色、电线管内进行接头时没有对接头处进行必要处理、照明设备和插座的接地安装被忽视等。因此,施工人员要对导线的颜色进行区分,电线管内禁止进行接头,接头处需要进行涮锡处理和缠绕处理。设备的地线安装也需要引起重视。

2.3 开关安装

电气设备的开关安装需要控制安装的质量,保障居民的使用安全。因此开关的选择也需要挑选质量性能较好的品牌,对于湿度较大的场所还需要对插座的防水功能要更高要求。

2.4 灯具安装

灯具的安装工程也需要进行相关的处理。一些用户可能对与灯具的造型和设计有所要求,因此对灯具的选择更加倾向于美观,而忽视了其质量和性能。一些灯具可能自身的受热性能不符合要求,存在着安全隐患。因此需要用户加强与施工单位的协商和配合。

结束语:

建筑装修是一项顺应时展的项目工程,然而不可忽视其内部的质量问题,尤其是电气施工,施工单位要在满足用户要求的同时保障施工的质量和安全,对一些注意事项更要加大执行力度。

参考文献:

篇9

[关键词]国际工程融资项目

一个工程项目的各个阶段的参与者不止一个国家,并且用国际通用的管理模式来管理的工程就是国际工程。国际工程承包是随着资本主义经济发展兴起的,至今已有近百年的历史了,是一项国际经济交易活动。各国的咨询公司、工程承包公司和投资单位不在本国参与建设和投资的工程的总和,就形成了全部的国际工程。

在项目的实施过程及投标过程中获得足够的资金支持定义为融资。历来国际承包商最关切的问题之一就是资金问题。企业确定市场竞争力的关键也是企业根据对外投资,生产经营和调整资金结构和对外投资的需要,通过资金市场和筹资渠道来经济有效的筹措资金的能力,其主要表现在融资能力和经营管理两个方面。中国企业承包项目的类型有:现汇项目、中国政府支持的双多边合作框架下的合作项目、投融资类项目。近年来,随着中国国力的增强,中国的政策性银行或者商业银行向与中国长期友好的一些国家就具体的合作项目提供了具有优惠性质的贷款和商业贷款,由中国承包企业具体实施,此类项目在中国承包企业的主营业务中也占了相当大的比例。但是与国际知名承包商相比,中国企业通过不同形式的融资获取项目的能力和数量还相当有限,融资能力对承包竞争力的影响也没有得到相关的重视。

一、我国国际工程企业融资存在的问题

随着我国经济的发展和国际交流能力的增强,我国国际工程企业的融资能力得到了很大的发展,然而同时也存在着许多的问题。

首先,世界经济市场大环境的不景气,以及发展中国家经济困难,使得国际工程承包商的资金压力越来越大,对我国承包企业融资产生了不利影响。同时世界债务危机也使得银行等国际金融机构对贷款和投资更为谨滇,解决其资金的渠道也更加受到阻滞。承包工程公司数量的增加和国际承包市场的建设项目的减少也导致了竞争日益加剧。

其次,除了国际市场环境而导致的融资困难,中国的对外承包公司还有自身的特殊因素。第一,相关政策以及经济运行机制的影响,我国的一些政策法规都不太完善,同时也却缺乏相关的法律法规和协调机构。使得中国承包企业受现有体制限制,对投融资类项目原动力不足。同时中国现有的鼓励承包企业参与投融资项目的信用保险体系也不够完善。第二,银行业对承包企业的影响。在我国,国有银行正处于发展之中,商业银行对其提供的政策性支持逐渐消退。在银行的具体信贷业务中,银行对国际承包业务支持不足,服务品种也比较少。同时,我过大多数国际承包工程企业多数存在资产质量不高,资本不足和资产负债比率等问题,也使得商业银行望而却步。第三,我国国际承包企业自身的局限性。我国大多数的国际工程承包企业大多数属于国有企业,其传统的运营机制还都处于改革和运行之中,所以存在很多的问题,比如:经营方式和经营组织落后,历史包袱较重,资产负债不合理和企业资产结构不合理,具有海外投融资经验的专业人才不足等。简而言之,我国承包企业从传统的现汇项目领域向融资类项目发展需要全方位的提升,尚有很长的路要走。

综上所述,一个国家的综合国力,该国与世界经济的互补程度以及该国市场的认同认知程度以及该国市场所具有的优势劣势等因素,可以影响其国际承包事业的发展。要使得我国国际承包工程事业获得发展,必须着力于我国法律法规和政策的调整,企业自身竞争力的增强,以及资金等方面的问题。

二、增强我国国际工程企业融资能力的策略

要想增强我国国际工程企业融资能力:

首先,政府应该完善相应的政策法规。统一和完善各个政府部门的政策法规,使得各部门政策一致。此外还要加强国外承包市场协调机构的作用,建立完善的国外投资政治风险担保制度。建立专业性的金融机构从而对国外工程承包提供服务,加快国有企业重组,深化企业承包改革,以及国有企业股份制改造的进程,同时让财政部门对国际工程承包企业提供政策上的支持。

其次,要加强我国国际工程企业的金融机构支持。积极采用银企合作的模式开拓此类项目,扬长避短,扩大国际承包工程的商业信贷资源,尽快改善买方信贷政策,尽快制定一套外汇政策,适合工程承包业务的。对国外承包企业提供,增强银行的功能,建立集中高效的信用体制。建议选择传统的有各类可调动资源的国家挖掘有潜力的项目源进行尝试,采取灵活的模式寻找切实可行的项目资金解决方案。

第三,对我国国际工程企业自身能力的建设也进行加强。对国际工程企业存在的问题加强政策支持力度,同时加强与跨国企业的合作,灵活的利用外资,利用政府出口信贷与对外经援优惠贷款相结合,从而降低国际工程企业的融资成本,扩大国际工程企业进行国际采购的途径,以企业自己所经营的主业为突破口,向主营业务产业链逐步延伸,逐渐积累经验,拓展更广泛的业务领域和空间。

总而言之,任何一家成功的国际工程承包公司,之所以能够成功,不仅仅取决于其管理经验,技术支持以及它在商务交易中赢得的信誉,还要看它使用资金的能力和筹集资金的本领。国际工程承包工程是具有广阔发展前景且利国利民的事业,国家也给予了高度的重视,只要我们客观的承认自己与国际先进承包商的差距,并采取相关策略付出更多努力,相信我国的国际工程承包业务也必然会迈上一个新台阶。

参考文献:

[1]R尼尔.国际工程项目管理综述.水利电力出版社,1995.

[2]AD.F普赖斯.国际工程财务.水利电力出版社,1995.

[3]宋均发等.企业融资渠道与与技巧.1994.

篇10

关键词:市政工程;给排水;施工管理;注意事项

在我国的城市建设中,市政给排水工程是人民群众日常生活的保障,也是城市建设的基础性工程,还是城市基础设施和环境建设的重要组成部分。给排水工程的科学规划与建设不仅关系着城市的基础设施发展完善状况,也影响着城市功能的良好发挥、城市化水平的提高以及市民居住的环境质量。为此,城市规划者和建设者必须提高市政给排水工程的整体水平。

1 市政给排水工程的特殊性

市政排水分为雨水排水和污水排水,市政给排水工程的特殊性包括:它的多数工作运行装置如管道位于地下,不易于日常的检测和管理,若出现问题,也很难及时发现和解决,甚至还会引发更大的危害;排水管道为无压管道,所以必须保证较大的铺设坡度;为了保证水的顺利排放,同时又考虑到高峰排水,因此排水管道管径较大,不便于市政排水工程的施工。

由于市政给排水工程施工具有上述多项特殊性,因此,在实际施工过程中,严格的管理将会是十分必要的。

2 市政给排水工程的施工管理

2.1 施工项目生产要素方面的管理

施工项目的生产要素包括:人力、材料、机械设备、施工方法和施工环境等。其中,人员的管理需要做到合理的组织、使用和管理劳动力;培养提高劳动者素质;激发劳动者的积极性和创造性,提高劳动生产率,全面完成工程合同,获取更大利益等这三点。材料管理主要包括制定材料采购计划、材料采购、材料的运输和装卸、材料入库、库存保管、材料的领取、加工使用和再利用等。对于机械设备管理,城市规划者应优化选择和配置施工机械设备,对其进行合理使用,定期进行维修保养。除上述几方面外,市政给排水工程施工项目的资金管理也是工程管理当中的重要环节。项目施工的资金管理是指专业管理人员结合当前市政给排水工程的施工方案而做出的资金收入及支出预测、并编制书面计划。根据计划向社会各方筹集施工资金(此处记作工程收入)包括政府拨款、向银行贷款等,资金的使用(此处记作支出)包括购买材料、雇佣工人等、资金的核算与分析等一系列Y金管理工作。资金的使用贯穿市政给排水工程施工的整个流程,对工程的顺利完工起着至关重要的作用,因此,部门工作人员对这一方面的管理更应高度集中注意力。

2.2 项目施工现场安全管理

在安全管理中,施工现场的安全检查作为主要内容之一,应当引起大家的高度重视。各施工承包商应坚持安全第一原则,加大对施工现场的安全检查力度,及时发现并纠正施工中的安全问题,如错误指挥、违章操作等,及时解决安全问题,消除不安全隐患,使工程的安全施工处在严格的控制之下,最大限度地降低危险事故发生的几率。安全建设,人人有责。大到公司领导、工地领导、专业技术监管人员,小到施工班、组的班长、组长,技术工作人员都应尽职尽责,为市政给排水工程的施工安全保驾护航。具体要求如下:

一方面,从各施工承包商的角度来看,各施工承包商应当建立系统、具体的施工安全文明管理体系,包括建立施工安全保证体系和施工安全检查体系,健全完善本公司的施工安全文明管理制度,并严格按照体系和制度行事,同时建立严格的奖惩制度,对遵守者予以嘉奖,对违规者则按照制度从严处理;应把对工作人员的安全教育放在安全工作的首位,定期组织工作人员进行安全守则的学习和考试,不断巩固安全学习成果;激发员工学习安全守则的积极性和创造性,在创新性的活动中达到提高工作人员安全意识和自我保护意识的目的;对新加入该项市政给排水工程施工工作的员工应依法按照安全教育规定对其进行全面的安全指导,未进行安全教育或考核不通过者不得参与该项市政给排水工程的施工工作。另一方面,从工程施工人员的角度来看,各分包商的施工人员应当服从安排,以积极的态度对待总承包商提供的安全守则教育,不得借口逃避培训和考试;增强安全学习意识,提高安全学习能力,为市政工程贡献力量。

2.3 施工流程中技术方面的管理

面对市政给排水工程建设流程中技术方面的管理,各城市规划者和建设者要做到以下几点:首先是在施工前,调查部门应认真组织工作人员考察施工周围地形,现存设施以及居民情况,对调查结果进行细致分析,为工程规划奠定基础;组织多名工程设计人员根据调查部门提供的调查报告,设计多个预选方案,通过模拟实验,排除不合理因素,最终确定内容完整的可行性方案;施工方在进行市政给排水工程建设前,应对全部工程设备进行严格检查,包括设备的完整性、安全性以及运行状况等方面,做好开工前的设备准备工作;严格执行开工报告制度,每一项新工程的开工,施工方都应向委托方作详细的开工报告,共同商讨并及时发现问题,解决问题,主动接受委托方的技术帮助,经双方共同表决通过后即可开工建设;施工方应严格遵守施工技术交底制度的各项规定,每项工程施工前应组织全部参与该项市政给排水工程建设的工作人员进行施工技术交底,施工技术交底要全面、详细,并具体落实到每一个工作人员,要求职责清晰、分工明确,并要求全部参加技术交底的工作人员都应在交底书上签字,没有参加技术交底的不得参加该项市政给排水工程的施工建设,同样,若工程没有进行细致的技术交底不允许开工建设。其次是在施工过程中,施工方应严格进行施工的技术控制,完善质量控制方式;每一位技术工人在施工过程中应认真做好技术工作,严格执行施工规范和方案要求,切实保证施工质量;各级技术管理与监督人员也应做好技术指导、管理与监督工作,发现不符合方案要求的情况应及时纠正,认真做好工程的施工技术记录,记录应当具体、全面、真实,不得有虚假记录出现。若施工中发现重大问题,应及时通知各相关部门,相关部门在收到通知后应当尽快处理,不得借故推辞、拖延;技术工人应自觉接受管理人员的技术监督,一切以工程项目质量为重。最后是在工程完工后,施工方应主动接受委托方的技术审查,自愿接受委托方的技术点评和审核。

3 市政给排水工程施工的注意事项

3.1 管道预留预埋要求

一是管道的预留预埋位置应当在合理估计预埋管集水范围的基础上加以确定。二是根据当地情况确定预埋管管径,如若城市存在河流、河涌,可减半设计流量,从而减小预留预埋管管径;若建设地为公园或绿地,也可相应减小预埋管管径。三是管道预留预埋间距问题,对于旧路改造,周围建筑已形成,一般不留或少留用户支管,这一部分让工作人员施工时根据现场情况定;对于新建道路通常预留间距在100到200米之间。

3.2 管网埋深以及排水降水工作要点

据了解,通常在城市地下的干燥土壤中,管网的最大埋深为8米,最小埋深则为管直径与管网上面的最小覆土深度之和,对于管网的最大埋深和最小埋深以及最小覆土深度,工作人员应当结合工程施工地区的具体情况加以分析确定。

地下水位以下开挖土方时,应采取有效措施做好坑槽底部排水降水工作,确保干槽开挖,必要时可在槽坑底预留20厘米的厚土层,待后续工序施工时随挖随封闭。

4 结语

城市市政给排水设施作为城市基础设施的重要组成部分,影响着居民的日常生活,关系着城市的卫生条件、市容市貌。因此,建设好市政给排水设施,确保其施工质量至关重要。尽管城市基础设施的施工存在种种困难,但我们相信,通过对给排水工程的细致研究,加上管理部门的严格把关,工作人员的严谨操作,在各方的共同努力下,所有市政给排水工程定能如期竣工,为城市居民带去完美的服务!

参考文献