岩土工程勘测设计范文
时间:2023-12-19 18:02:34
导语:如何才能写好一篇岩土工程勘测设计,这就需要搜集整理更多的资料和文献,欢迎阅读由公务员之家整理的十篇范文,供你借鉴。
篇1
关键词:岩土工程;勘察设计;抗震
Abstract: With the continuous development of infrastructure in our country city, many new problems in geotechnical engineering an important part of basic construction encountered, such as the selection of construction technology under complex geological conditions, design of operational issues, identify problems of mechanics model and design parameters, the influence of groundwater problems, it has made some the conventional design method cannot adapt to, especially for excavation problems. Because the excavation is a temporary project, too much to consider security issues will lead to excessive investment and wasteful, too much to consider economic problems may lead to instability of foundation pit and the cause of the accident, had many lessons in this two aspects.
Keywords: geotechnical engineering investigation and design; seismic;
中图分类号:P25
1.动态设计法
1)工程地质和水文地质条件变化复杂,勘察报告提供的数据具有较大的离散性和局限性,往往难以真实反映土层的分布情况和力学特性及地下水情况。
2)周围环境条件复杂,邻近建筑物、构筑物、道路和地下设施(管道、电缆及防空洞等)都在一定程度上制约着所采用的岩土工程措施。
岩土工程的复杂性和诸多的不确定性,使设计者在设计时不可能考虑到所有因素。为了减少工程事故,保证工程的质量和安全,提高工程效益,近年来在岩土工程中引进了动态设计方法。所谓动态设计方法,就是根据场区环境和工程地质条件的特点,提出相应的设计方案,并根据施工中出现的具体问题和监测结果不断修改方案,进行优化设计的方法,这种方法较好地实现了设计、施工和监测三者的有机统一。从现有的文献资料来看,动态设计主要指根据实测的位移情况来反演土体性态参数及结构力学参数,确保设计参数合理。目前,根据施工情况确定土体抗剪强度值的动态设计方法是反分析方法,这是一种根据支挡结构的位移情况和土压力分布模式来反演分析土体抗剪强度C,值的方法。由于相同的位移采用不同的土压力模式会反演分析出不同的抗剪强度c,妒值,因而,该方法所得到的C,值只是理论值而非实际值。这里介绍一种我们在工程实践中总结的根据滑裂面来反分析土体抗剪强度c,值的动态设计方法。由于土体发生滑动时,首先要达到极限平衡状态,其滑裂面几何参数反映了土体抗剪强度。以滑裂面为基础的动态设计方法从极限平衡的概念出发,运用工程类比的方法,通过调查滑裂面几何参数临界深度和滑裂面倾角就可以来反演分析土体抗剪强度c,值。工程经验告诉我们,基坑工程往往至少有一侧比较宽阔,可以自然放坡,并且施工场地地质条件比较单一、变化不大。在土方施工中,可以先开挖这一侧,然后根据该侧成坡情况来研究确定其土层抗剪强度C,值,从而推断出相邻侧甚至整个施工场地的土层抗剪强度C,值。由此,我们可以将此经验作进一步的推广,即先开挖基坑中部的土方,以观察土体的自然稳定情况,从而确定土层的c,9值,这一点对于采用自然放坡的支护形式和按照“逐层开挖,逐层支护”原则进行施工的喷锚支护形式尤其适用。
2地层剪切波速的确定
弹性波速测试的方法有:跨孔法、单孔波速法(层检法)和面波法。在工程上,对于多层体系常用跨孔法,直接测定不同深度岩土层的波速;当土层软硬变化大(模量有突变)和层次较少或基岩上为覆盖层时,可用单孔法;面波法在工程上较少用。在岩土工程勘察中,主要要求是测定覆盖层且主要是20m深度范围内土层的波速,采用单孔层检法最为简便,是现场波速试验最常用的方法。
2.1钻孔剪切波测试方法及原理
野外剪切波测试仪器为SE2404型综合工程测仪(其它浅层地震仪亦可),配合井下三分量检波器进行剪切波测试。测试方法多采用单孔叩板法(层检法),即:先在井口附整出一小块空地,安放厚木板(厚10~20cⅡ1、长150300cm),木板上压上重物,使木板紧贴地面。木板放置方向应尽量使木板中心和井口的连线垂直于木板长轴方向,板以靠近孔口1-5m为好。然后用大锤(木锤为最好)沿水平方向在木板两端各激烈敲击一次,将同一个检波器得到的两张剪切波记录相比较,利用它们相位反相的特点,判读剪切波(S波)的初至时。这种方法的优点是:不受试验场地的限制,较为适合于市区内的地基勘探,而且能直接可靠地给出隐蔽层(或薄夹层)的准确位置、厚度及其波速。需注意的是:检波器应紧贴孔壁,木板紧贴地面,当重锤敲击木板时尽可能沿水平方向敲击,尽可能避开在有较大背景干扰信号的情况下进行剪切波测试,或设法改变工作方式压制干扰信号。
2.2剪切波(v)的计算
根据野外实测剪切波波形记录判读剪切波的初至时,据地层厚度计算出各地层的剪切波(V,)。
3场地类别划分
根据《建筑抗震设计规范》(GB50011-2001)的规定,建筑场地的类别划分,应以土层等效剪切波速和场地覆盖层厚度为准,建筑场地覆盖层厚度的确定,一般情况下,应按地面至剪切波速>500m/s的土层顶面的距离确定。土的类型根据土层剪切波速按表1划分为四类;建筑的场地类别应根据土层等效剪切波速和场地覆盖层厚度按表2划分为四类。在岩土工程勘察实践中发现,岩土层结构和强度变化较为复杂,如何确定覆盖层厚度很困难,各种规范对覆盖层厚度的取值规定有些差异,也有些勉强;建筑抗震设计规范规定,建筑场地覆盖层厚度的确定,应符合下列要求:
(1)一般情况下,应按地面至剪切波速大于500m/s的土层顶面的距离确定;
(2)当地面5m以下存在剪切波速大于相邻上层土剪切波速2.5倍的土层,且其下卧岩土剪切波速均不小于400m/s时,可按地面至该土层顶面的距离确定;
(3)剪切波速大于500m/s的孤石、透镜体,应视同周围土层;
(4)土层中的火山岩硬夹层,应视为刚体:①场地土层剪切波速随深度呈递增趋势;②将剪切波速大于50Ore/s的硬土层定义为基再根岩,作为输入基准界面;③相邻土层剪切波速差异大于2.5倍视为土层刚度突变,作为边界条件;④松散层中孤立的硬夹层予以,、忽略;⑤与基岩相连的硬夹层(如坚硬的侵入岩岩脉)作为输入边界考虑,计算覆盖层厚度时扣除硬夹层的厚度。尽管有准确的实测的剪切波速,由于场地岩土层分布不均匀,可能并非整个场地均属于同一场地类别,即可能部分地段为Ⅱ类,部分地段为I类或Ⅲ甚至Ⅳ类,这对建筑物的场地类别确定造成困难,当建筑物由不相连的单体组成时,可按单体分别考虑,否则应根据上述各影响因素综合考虑确定,选择合适的基础形式,加强结构抗震措施。
4.土层抗剪强度c,值的确定
下面我们以上述思想来确定土层抗剪强度c,值,基坑滑裂面情况见图1。即内摩擦角值等于滑裂面倾角或稳定坡面倾角,这与砂土的内摩擦角值等于其休止角的结论一致;对于粘土而言,由于土坡滑裂面为圆弧形,土坡滑裂面倾角指圆弧弦AB倾角。C值越小、圆弧角越大,c值为0、圆弧角为180。,故砂土滑裂面可以看成粘土滑裂面的一个特例。在实际工程中,我们多用自然放坡形成的稳定坡面来代替滑裂面。由于人工放坡形成的稳定坡面倾角肯定要不大于滑裂面倾角,故用O/代替来计算土压力是偏于安全的。支护桩的实测内力与其理论值往往有很大出入的一个重要原因是参数取值与实际情况不尽相符。如沈阳市工程基坑均采用自然放坡,坡面稳定倾角在55。~58。左右,施工场地地质条件比较单一,而地质报告提供的=36。,若按妒=36。来计算其他侧支护桩内力,显然实测值与理论值会有很大的差异。下面我们来确定C值。如图1所示,土层临界开挖深度为zn,由朗肯理论可知:在根据式(1),式(2)来确定土层c,值时,有一个问题很值得注意。我们所观察到的坡体稳定状态是在特定条件下的稳定,不是在任何条件下都能保证其稳定的。因此,应在充分研究地质报告的基础上,根据岩土性质的相似性、坡体稳定的诱发因素以及工程性质来对调查的成果c,值进行相应的调整。具体内容如下:
1)岩土性质的相似性:对于土层,应注意比较土层类型、厚度、成因、状态、原位测试以及土工试验成果的相似性;对于岩层,应注意比较岩石类型、矿物成分、风化程度、解理构造等的相似性。
2)坡体稳定的诱发因素:主要有水的困素(包括渗入坡体的水、坡或坑顶是否有硬覆盖以及是否有可靠的排水措施等)、地震因素和人为因素。
3)工程性质:包括工程类型(如:边坡加固工程是永久性工程,而基坑支护工程是临时性工程)和工程的重要性等级。
4)应考虑支护方式和地下水控制方式对c,‘D值的影响。注意区别注浆类(如锚杆、土钉等)和非注浆类(如内支撑、悬臂桩等)不同类型支护方式的影响。同时应注意:基坑降水时由于降水漏斗的存在,基坑开挖面以上的土层在基坑内外均处在非饱和状态;基坑止水时由于止水帷幕的存在,基坑开挖面以上的部分土层(甚至全部土层)在基坑内为非饱和状态而基坑外为饱和状态。
5)一定要认真分析地质特点,不要被开挖过程中所观察到的表面现象所迷惑。
篇2
【关键词】地基设计;岩土工程勘察;常见问题;对策
近些年来,随着我国社会经济的快速发展,对各种建筑工程的需求也不断增加,促进了建筑工程的进步,建筑工程的安全成为人们关心的重点问题。地基设计和岩土工程勘察是建筑工程的重要基础,但是在实际当中,却存在着诸多问题,比如设计与勘察的脱离等,影响了地基设计与岩土勘察工作的效果,给建筑工程的安全埋下隐患。
1 地基设计与岩土勘察过程中的常见问题分析
1.1 准备工作不到位
在开始地基设计与岩土勘察工作之前,需要进行一些必要的准备工作,才能确保地基设计与岩土勘察工作的顺利进行。但是,在实际当中,准备工作不到位现象十分普遍,这主要体现在以下几方面:
首先,相关资料收集不充分,无论是地基设计还是岩土勘察,都需要在详细了解目标区域内的地形、地貌、水文等资料的基础上进行,如果某些资料收集不完全,就可能给岩土勘察和地基设计工作埋下隐患。
其次,勘察工作缺乏严格规划。岩土工程的勘察是一项十分复杂的工作,只有根据全面、科学、合理的规划,才能确保勘察工作的顺利进行,规划的不严格,是岩土勘察受阻的主要原因[1]。
1.2 工作过程不规范
地基设计与岩土勘察的规范使建筑工程施工顺利开展的重要保障,但是,在实际当中,地基设计与岩土工程勘察不规范现象十分严重,增加了建筑工程施工的难度,这种不规范包括以下两方面:
首先,在地基设计中,由于岩土勘察的范围十分有限,地基设计的依据并不完整,其设计方案的准确性、合理性自然也得不到保障,在实际应用过程中,经常发生与实际不相符的问题,影响建筑工程设计和施工的合理性。
其次,在岩土工程勘察过程中,只勘察了建筑工程的重点区域,忽视了其他非重点区域的勘察,得到的勘察结果并不全面,加上勘察报告各项力学指标取值过于保守,勘察结果与实际偏差较大,也会给建筑工程设计和施工造成影响。
1.3 勘察方法不合理
在岩土工程勘察过程中,由于地质结构、地层性质的差异,需要使用的勘察方法也有所不同,但是,在实际勘察工作中,由于勘察单位资质、技术水平、人员素质、勘察费用等诸多因素的影响,其运用的勘察方法过于简单、单一,有很多地质问题并无法准确勘察出来,严重降低了岩土工程勘察工作结果的可靠性和经济合理性。
同时,在勘察报告中,对相关数据的分析只注重了定性分析,忽视了定量分析的重要性,分析得到的结论是片面的,影响了勘察报告的准确性,进而给地基设计和建筑工程施工造成不良影响。
1.4 部门间缺乏交流
地基设计与岩土工程勘察是由不同的工作部门分别完成的,但两者之间存在着密切联系,只有部门之间的协同工作,才能确保地基设计与岩土工程勘察的效果。但是,在实际当中,部门之间的交流效率十分低,大多依靠纸质媒介作为资料传递的方式,经常容易出现重要信息遗漏、信息流通不畅等问题,给彼此工作的开展造成阻碍,降低了地基设计与岩土工程工作的效率和效果。
1.5 设计与勘察脱节
地基设计与岩土工程勘察之间是相辅相成的,地基设计为岩土工程勘察提供相应的工作目标,指导勘察的取样方法、手段和设备等内容,岩土工程勘察数据是地基设计的重要依据。但是,从实际情况来看,地基设计与勘察工作之间存在较为严重的脱节现象,地基设计人员无法全面了解岩土工程勘察的情况,只是依靠以往的经验和主观判断进行设计,而勘察工作缺乏明确的目标,勘察的数据较为混乱,没有系统性[2]。
1.6 设计过于理想化
地基设计并不是作为一个个体单独存在的,地基性质与周边的环境有着密切联系,但是,在地基设计中,尤其是复杂环境中的地基设计时,许多设计人员为了简便,通常会忽略建筑工程的环境因素,没有深入、全面分析周边环境对地基设计可能造成的影响,设计方案过于理想化,缺乏足够的实用性,给建筑工程施工造成妨碍,甚至会引起安全事故。
2 解决地基设计与岩土工程勘察过程常见问题的对策
2.1 加强对相应准备工作的重视和检查
准备工作是地基设计与岩土工程勘察开展的重要基础,设计和勘察单位应该加强对准备工作的重视,在正式工作开展之前,派遣专门的人员收集相关的资料,包括建筑工程项目的计划书、相关文件以及合同,项目施工区域内的地质、水文、地下管线以及周边建筑等各种信息,根据对这些资料的分析,来确定周边环境因素对地基设计可能形成的影响、岩土工程勘察应使用的方法、勘察的范围、勘察的深度等内容,为地基设计与岩土工程勘察工作的顺利开展奠定良好的基础。
2.2 编写地基设计和岩土工程勘察纲要
纲要的编写对于地基设计和岩土工程勘察工作的进行起着重要的指导作用,在纲要当中,首先要制定地基设计和岩土工程勘察的每一个阶段的具体目标,保证工作开展的井然有序;其次要对地基设计和岩土工程勘察制定相应的制度和规范,确保所有工作采用统一的标准,工作所得的结果具有可靠性、准确性,尽量避免结果不真实等问题,以防给建筑工程造成负面效果。
2.3 做好部门之间的信息交流与共享
地基设计与岩土工程勘察部门之间信息的良好交流和共享,对于设计和勘察工作效率、效果的提升也有着至关重要的作用。对此,可以通过采用先进的信息技术,在两个部门之间建立统一的信息平台,实现信息的及时、高效传递,以便及时发现工作中存在的方向偏离等问题并作出纠正,有效避免设计与勘察工作的成本浪费,提高设计、勘察工作的水平,为建筑工程施工的顺利开展创造条件[3]。
2.4 加强对地基设计和岩土工程勘察人员培训
设计和勘察人员素质水平对于地基设计、岩土工程勘察工作的水平起着决定性的作用,因此,加强对人员的培训具有十分重要的意义。
首先,加强对人员专业技能的培训,开展相应理论知识的学习,了解先进的设计理念和勘察方法,提升人员的专业素养,为工作水平的提高奠定基础。其次,加强对人员实践经验的培训,设计和勘察部门应安排相应人员参与到工作的第一线,展开各种形式的实践,提高相应人员的实践经验,使其加强对设计、勘察工作的深入理解,在实际工作中能够更好地把握设计、勘察工作的重点和方向,从而有效提升设计与勘察工作的水平。
2.5 加强对施工区域性差异的重视
我国幅员辽阔,地质环境特点十分复杂,在不同的区域内,地形地貌有着十分大的差异,适用的地基设计方法和岩土工程勘察手段有着极大的不同。因此,低地基设计和岩土工程勘察过程中,要充分重视施工区域性的差异,加强对地形特点、地理环境的了解,选择与之适应的勘察和设计方法,保证勘察数据的准确性、合理性,确保地基设计方案的可行性。
3 结语
综上所述,地基设计和岩土勘察过程中还存在着许多问题,这些问题也是建筑工程安全事故发生的主要原因,给人们的生命财产安全造成了严重威胁。因此,加强对地基设计和岩土勘察过程相关问题的分析和研究,探索相应的处理对策,是相关建设部门和企业的重要工作,对于建筑工程的良好发展有着重要的作用。
参考文献:
篇3
关键词:岩土工程勘察;地质研究;问题;措施
中图分类号:G406文献标识码: A 文章编号:
一、岩土工程勘察概况
岩土工程勘察是岩石工程研究乃至地质工程研究的重要分支,在我国地质勘察研究中国占据重要地位。岩土工程勘察其本质是指通过一定技术手段对工程现场的土质、岩层、土壤成分进行具体勘察。岩土工程勘察通常通过对工程建设地质信息进行勘察、采样、试验、测试得出结果,并对结果进行理论分析,以保证了工程建设的顺利进行。在工程建设中,高质量的岩土工程勘察工作必须按照工程建设相应规范来进行,得出的岩土工程勘察报告要能够以客观角度出发真实反映工程建设勘察场地的、地貌、地下水、地层构造、地形、岩土性质等问题。
岩土工程勘察工作所包含的范围十分广泛,对社会的发展也起着重要的推动作用。岩土工程勘察工作的主要目的是避免工程建设建造过程中出现些土质、地质相关问题,为工程设计、工程建设、工程施工提供精确可靠的工程地质勘察数据及不同地点的岩土工程参数。无论是哪些工程项目,在项目工程实施前都必须对建设现场进行严格细致的岩土工程勘察工作。在我国,公路工程、工程建筑、水利工程及铁道建设都是岩土工程勘察的研究领域。现如今,随着工程建设的管理、建造、信息化操作的提高,岩土工程勘察工作与以往相比已有很大程度的进步在引进国外先进地质勘察技术的基础上,我国近年来的岩土工程勘察工作及研究已经获取了众多成果。
二、岩土工程勘察研究中存在的问题
岩土工程勘察工作随着我国工程建设的发展受到了越来越多人的关注,但是当前我国岩土工程勘察或多或少存着岩土工程勘察方案、岩土工程勘察人员技术、岩土工程勘察试验、现场岩土工程勘察等方面的问题。下面就以上这些问题进行分析探讨。
1、岩土工程勘察方案方面
在我国,随着市场工程建设企业的增多,与之相适应的岩土工程勘察部门也逐渐增多,这势必增强了工程勘察市场内部激烈的竞争力。所以很多岩土工程勘察机构为增加中标机率,在岩土工程勘察方案制定中忽略了客观因素,为达到招标方需求任意改动岩土工程勘察项目进程,无法为后期工程建设提供充足可靠的程勘察依据。
2、岩土工程勘察人员技术方面
尽管目前我国的岩土工程勘察相关研究领域已经有许多成绩,但纵观勘察领域的研究现状来看,很多勘察工作人员的技术水平不够达标,且勘察工作中所体现出来的专业勘察素质较差。岩土工程勘察整体工作人员的素质不够高导致很多勘察项目质量不过关,直接影响了未来岩土工程勘察研究。
3、岩土工程勘察试验方面
就我国大多数工程的岩土工程勘察试验情况来看,在我国还有很多勘察部门缺乏专业的地质勘察知识。这部分岩土工程勘察部分在进行岩土工程勘察试验过程中不能运用科学合理的试验方法,导致很多岩土工程勘察工作无法顺利进行下去。
4、现场岩土工程勘察方面
目前,我国部分勘察部门并不重视岩土工程勘察,尤其是一些部门受到些利益方面的诱惑,会做出违法违规行为。为了获取更多薪酬,部分勘察人员在现场勘察工作中肆意改变勘测设计,从而导致建设现场风化作用、土壤水土流失现象不断产生,严重影响了建设项目的现场岩土工程勘察工作。
三、解决岩石工程勘察中问题的有效措施
1、端正岩石工程勘察的工作态度
岩石工程勘察工作是一项以科学为标志的技术性工作。这就要求国家勘察机构摆正自身研究态度,秉着严谨、求实的态度进行工程岩石工程勘察工作。例如要根据地域及工程建设土壤情况进行现场岩石工程勘测活动,针对土壤干湿不同程度因地制宜选择合理的勘测手段及勘测技术设备。以便岩石工程勘察工作人员作出相应的勘察方案设计。
2、完善岩石工程勘察相关制度
针对现阶段我国岩石工程勘察研究工作存在着的一系列问题,国家地质勘察相关部门应以我国勘察研究实情出发对岩石工程勘察相关制度作进一步的完善与修改,对岩石工程勘察市场进行全面的考察工作,避免市场内部的不正当竞争现象。切实加强对我国岩石工程一切勘察活动的监管工作,规范各项岩石工程勘察工作标准。及时发现岩石工程勘察工作中违规违纪行为,并对违规行为予以严厉处罚。
3、培养岩石工程勘察专业人才
日前,面临混乱复杂的岩石工程勘察市场,国家及相关勘察机构应加强对岩石工程勘察专业人才的督促和培养。首先,在岩石工程勘察专业人才学习方面,应在我国高校教育体系中,加强岩石工程勘察专业教育力度。其次,针对我国岩石工程勘察相关部门出现的一些问题,国家应进一步为勘察技术人员提供更多学习机会,不断加深岩石工程勘察专业知识宣传工作,从勘察机构内部做起完善机构技术系统,为我国日新月异的岩石工程勘察研究贡献力量。
四、总结
综上所述,本文通过对岩石工程勘察工作及当下岩石工程勘察工作中所出现问题的一系列探讨,论证了岩石工程勘察工作在各项建筑工程、水利工程中的重要性,岩石工程勘察工作不仅能够为工程前期建设方案、测评报告、安全防范措施的制定奠定坚实的实施基础,而且对建设工程的完成进度、完成质量产生直接的影响。相关勘察工作人员只有加强对岩石工程勘察工作的重要性意识,在未来岩石工程勘察研究中不断探索,才能够为我国岩石工程勘察研究做出更多贡献。
参考文献
[1]潘广灿,张金来.对岩土工程勘察与地基设计若干问题的认识[J].探矿工程(岩土钻掘工程),2005(09).
[2]颜建平.关于岩土工程勘察实际工作问题的研究[J].化学工程与装备,2010(09). .
[3]王永成,闻芳芳.初探岩土工程勘察的一些常见问题[J]. 西部探矿工程,2010(11).
篇4
【关键词】工民建项目;岩土工程;勘察研究
按照当前的工民建项目施工技术规定,所有的工民建项目在进行正式施工之前,都必须向有关单位机构提供岩土工程勘察报告。通过对施工现场的岩土质量进行全面的技术分析,能够让后续的正式设计、施工更加科学合理,从而有效防止施工事故的出现几率。
1当前工民建项目岩土工程勘察工作的现状
1.1岩土工程勘察的主要内容
稳定性探测:首先要了解施工区域的施工条件,分析施工条件是否能够满足后续设计、施工的强度需求,找出可能对设计、施工造成不良影响的地质因素,并对其进行详细的统计,结合多方部门的技术来对其进行分析。土质分布状况:勘察整个施工区域内的土质分布状况以及土质特征,同时还应该对施工区域的地下水情况进行勘察分析,测量出准确的土质数据和相应的技术参数。对施工建设可能造成不良影响的岩土工程问题,要提前制定出相应的解决预案,当问题真正出现时要及时的解决。对岩土工程勘察情况进行初步的评价,并制定出初步的基建方案,进一步根据岩土工程勘察进展来对基建方案进行优化。对即将开工的工民建项目的安全施工进行评估,为工程事故进行详细的分析,并收集相关的证据。
1.2工民建项目岩土工程的勘察方式
岩土工程的勘察方法主要有工程地质测绘与分析,勘察取样,原位测试和室内技术分析等几个步骤。工程地质测绘与分析主要是在岩土工程勘察前期进行,主要作用就是为勘察工作的可实施性进行初步的分析研究。勘察取样。勘察又包括土质勘察、物理勘察和钻井勘察等几种方式,作为分析建筑物与地下土质属性结合密度的重要工作,将对勘察到的土地质量进行技术分析,并对土质数据进行更加科学的研究。勘察资料的整理则是对岩土的力学指标进行更加全面的整理和分析;对原始的图片资料进行编辑保存;对岩土工程勘察报告进行最终的分析和审核。这项工作将在整个勘察工作最后进行,同时也是最为重要的工作,能对后期的建设施工起到决定性的作用。
2岩土工程勘察工作中常见的问题
由于工民建的岩土工程勘察技术所使用的勘察方式和勘察设备不同,所引起的问题也大不相同,但是从整个建筑工程行业来讲,岩土工程勘察工作常见的问题主要有以下几点:
(1)岩土工程勘察的资料存在缺失现象
勘查工作开始之前的资料准备存在漏洞,部分资料不齐全是最为常见的现象。并且很多岩土工程勘察工作中都存在布置不合理的现象,这不仅会误导后期的勘察工作,降低勘察工作的准确性,还会对建设施工部门造成极大的影响,为其带来一些不必要的麻烦。有的勘察部门为了赶工期,仅对现场进行了大致的勘察工作就妄下评论;更有勘察人员仅凭周围人的道听途说,在无任何技术设备的帮助下就得出的勘察结果,这样得出的勘察数据报告就缺乏一定的真实性,不仅不能给后续的设计、施工部门提供科学的技术参考,甚至还可能对后期的施工建设造成一定的影响,轻则增加施工成本,重则出现施工事故威胁到施工人员的人身安全。
(2)勘察报告数据不准确
工民建项目的岩土工程勘察工作之所以重要,主要就是能够为后续的设计、施工提供可靠的设计、施工数据,从而为后续的设计、施工提供一定的帮助。但如果勘察报告中的数据不准确或不完善,甚至勘察数据出现失真现象,那么勘察分析报告就会变得毫无意义,如果设计单位依然依照这份勘察报告进行设计,那么设计就会出现问题,如果施工单位依然依照这份勘察报告制定施工计划,那么施工建设必定会受到影响,这都将给工程建设带来巨大的经济影响。
(3)岩土工程勘察技术不科学
勘察人员在勘察过程中不能及时更换勘察理念,往往使用单一的勘察理念来进行所有的勘察工作。在勘察之后,对岩土数据进行技术分析时,没有对可能出现的潜在问题进行处理,而是采用传统的方法来对其进行计算,这种传统的计算方式就会增最终数据的误差,让其失去参考价值。部分勘察设备较为陈旧,直接导致勘察数据不精确。
3改进岩土工程勘察工作的途径
针对岩土工程勘察工作中存在的问题,必须采取针对性的解决措施,从而进一步改善勘察质量保障最终得出的勘察数据,只有更加精确的勘察数据才能够对设计、施工起到帮助。其改进途径主要有以下几点:
(1)监督工作严格化
对于工民建项目的岩土勘察工作必须杜绝不负责的现象。在现场勘察过程中必须加强监督工作和管理工作的力度,要求所有的勘察工作必须遵循相关的技术规程,所有的勘察数据必须经过反复的验证计算。对于施工区域的土质要进行全面的了解,选择土质更好,埋藏度更高的区域来进行勘察,进一步拉大勘察区域的距离,从而让勘察工作具有一定的代表性。
(2)选择合适的岩土工程勘察方法
对于工民建项目来说,选择合适的岩土工程勘察方法十分重要,首先制定出科学合理的勘察方案,然后根据勘察方案精心选择符合实情的勘察设备,同时对勘察现场要进更加全面的技术分析,对勘察数据要进行更加科学的分析,并组织技术人员来对其进行技术验证。
4结语
岩土工程勘察工作作为工民建项目重要的前期工程,其重要性是不言而喻的。因此,岩土工程勘察工作中所面临的难题也是相对较多的。所以,勘察人员必须站在问题的基础上来进行针对性的分析,并采取更加合理的方式来解决问题,最终让勘察数据能对后续的设计、施工建设提供一定的帮助。
参考文献:
[1]樊克.论当前工民建项目岩土工程勘察工作[J].现代装饰(理论),2012.
[2]吕金奇.工民建项目中岩土工程勘察的控制措施探讨[J].门窗,2012.
[3]刘雅洁.论当前工民建项目岩土工程勘察工作[J].中小企业管理与科技(上旬刊),2013.
[4]蔡志刚.工民建项目岩土工程勘察工作探析[J].河南科技,2014.
篇5
自2003年中国地质学会工程地质专业委员会发起建立“全国工程地质专家库”以来,得到全国各界工程地质(含岩土工程和地质工程相关专业)行业高科技人员的积极响应,已经收到420余份反馈回来的专家登记表,均已录入数据库。“全国工程地质专家库”已初具规模,从针对服务的行业来说,包括水利电力、铁路交通、矿山和工业民用建筑等;从专业领域来说,包括工程地质勘察、岩土工程施工、地质灾害研究等;从遍及的单位来说,包括高等院校、科研院所、各部委直属勘测设计院和公司等一百多家;从职称分布来说,包括工程院院士、勘察大师、教授级高级工程师、高级工程师、教授、副教授、研究员、副研究员等;从工作职务来说,包括院长、副院长、总工程师、副总工程师、经理、校长、系主任等。
入库的单位及其人数情况:北京国电华北电力工程有限公司14人;长安大学地质工程与测绘工程学院11人;成都理工大学环境与土木工程学院12人;国家电力公司成都勘测设计研究院43人;国家电力公司贵阳勘测设计研究院15人;国家电力公司昆明勘测设计研究院39人;建设综合勘察研究设计院11人;水利部天津水利水电勘测设计研究院11人;中国科学院地质与地球物理研究所17人;中航勘察设计研究院39人(这里只列出了10人以上的单位)。
2软件功能
2.1基本功能
①显示工程地质(地质工程、岩土工程及相关专业)专家基本信息,包括姓名、性别、出生年月、技术职称、工作职务、工作单位、单位性质、联系方式。②显示专家专业特长,工作领域。③打印专家表。④按照入库序号、姓名和工作单位排序,方便检索。⑤可随时登记入库。
2.2查询
按照姓名、出生年月、工作单位、单位性质、技术职称、专业特长、工作领域等单个字段查询,查询的结果可显示专家基本信息、专业特长和工作领域,打印专家表。
2.3高级查询
多个字段的组合条件查询,查询结果可制作报表。
2.4数据库维护
数据库管理员能够轻松完成数据库的日常维护工作,如添加、删除、查询等。
专家库可用于人事档案管理、查找工程咨询专家、聘请工程项目评审专家、查找稿件评阅人、聘任学位论文审阅人等。
3系统界面及功能模块
3.1主界面
全国工程地质专家库系统主界面如图1所示。界面包括菜单区、查询区、信息管理区和信息显示区。菜单包括记录、查询、管理员和帮助等项。查询区包括单个字段的简单查询和高级查询按钮。信息管理区由基本资料、专业特长、工作领域、备注、全表浏览、打印、退出按钮组成,点选不同的按钮,信息显示区将显示不同的信息。
3.2高级查询界面
点击主界面窗口中查询区的高级查询按钮会弹出高级查询窗口,如图2所示。通过该窗口可生成查询条件、选择结果中要显示的字段、选择排序字段、选择组合查询条件,并执行查询。查询结果由查询结果窗口(图3)显示出来。
3.3查询结果窗口
点击高级查询窗口中的开始查询按钮就可弹出查询结果窗口。查询结果窗口左上部分显示符合查询条件的记录,右上部分是打印全部结果按钮和打印选中结果按钮。下部是选中专家的详细信息,当点选左上部的不同专家,其详细信息会改变。
3.4查询结果报表打印窗口
点击查询结果窗口中的打印全部结果按钮将弹出查询结果报表打印窗口,如图4所示。上部是打印按钮、导出按钮和缩放比例下拉列表框,中间是报表显示区,下部是页码显示和翻页按钮。
3.5选中结果报表打印窗口
点击主界面信息管理区打印按钮和查询结果窗口中的打印选中结果按钮将弹出选中专家资料报表打印窗口,如图5所示。
3.6数据库管理员界面
点击主界面管理员菜单下的管理员登陆菜单项后,弹出管理员登陆对话框(图6),输入帐号和密码后,点击确定按钮进入数据库管理员界面(图7)。
数据库管理员界面由菜单、工具按钮、专家信息编辑区和全表数据浏览和编辑区组成。工具按钮包括移动记录、添加、删除等按钮组成,专家信息编辑区用来编辑专家信息,全表数据浏览、编辑区浏览和编辑数据库记录。
4工程地质专家库系统开发
4.1数据库
(1)信息来源
通过学术会议、信件和网上下载(见/xwdt-040106.htm)等途径分发“全国工程地质专家库专家登记表”,收集反馈回来的原始登记表,录入数据库中。
(2)创建数据库
在MicrosoftOfficeAccess软件中建立专家数据库。数据库中包括的字段有:姓名、性别、出生年月、工作单位、技术职称、工作职务、专家特长、工作领域、通信地址、邮政编码、联系电话、传真和电子邮箱等,基本涵盖了专家的基本信息、特长、工作领域和联系方式。
(3)数据录入
数据录入方式有两种方式:①在Access中录入;②数据维护方式,即在数据库管理员界面中输入数据。
所有专家的信息存储在一个数据表中,每位专家的信息在数据表中表现为一条记录。
4.2系统功能的代码实现
采用MicrosoftVisualBasic6.0作为开发工具,运用其集成开发环境和快速应用程序开发技术,根据软件的功能模块分别创建程序界面和窗口(图1-图7)。开发过程中使用了ADOData控件、DataGrid控件、DataEnviornment设计器、DataReport设计器等。
下面着重叙述高级查询的实现。在高级查询窗口中,用户填写的查询条件包括查询结果中显示的字段、where子句查询条件、字段排序子句,用字符串连接生成SQL查询语句。然后在专家数据表中查找符合查询条件的专家记录并在查询结果窗口中显示给用户。完成高级查询功能的程序片段如下:
PrivateSubcmdQuery_Click()
DimstrKeyAsString
DimstrSQLAsString,strsqlAllAsString
DimstrOrderSQLAsString
DimstrOrderAsString
DimintLenKeyAsInteger
DimiAsInteger,jAsInteger
''''查询结果至少要显示一个字段
IflstKey.SelCount=0Then
MsgBox"查询结果中至少要显示一个字段!",vbMsgBoxSetForeground,"缺少字段"
ExitSub
EndIf
IftxtCondition.Text=vbNullStringThen
MsgBox"请加入查询条件!",vbOKOnly+vbInformation,"提示"
ExitSub
EndIf
''''查询结果中显示的字段
strKey=vbNullString
strkeys=vbNullString
Fori=0TolstKey.ListCount-1
IflstKey.Selected(i)=TrueThen
strKey=strKey&lstKey.List(i)&","
EndIf
strkeys=strkeys&lstKey.List(i)&","
Next
strKey=Mid(strKey,1,Len(strKey)-1)
strkeys=Mid(strkeys,1,Len(strkeys)-1)
''''where子句查询条件
strWhere=vbNullString
IfLen(Trim(strQuerySQL))>0Then
strWhere="where"&Trim(strQuerySQL)
Else
strWhere=vbNullString
EndIf
''''字段排序字句
IflstOrderKey.ListCount>0Then
mstrOrderSQLs=""
intLenKey=0
Forj=0TolstOrderKey.ListCount-1
strOrderSQL=lstOrderKey.List(j)
IfoptOrder(0).Value=TrueThen
intLenKey=InStr(1,strOrderSQL,"(升序)",vbTextCompare)
strOrder="ASC"
Else
intLenKey=InStr(1,strOrderSQL,"(降序)",vbTextCompare)
strOrder="DESC"
EndIf
IfintLenKey>0Then
strOrderSQL=Mid(strOrderSQL,1,intLenKey-1)
IfmstrOrderSQLs<>""Then
mstrOrderSQLs=mstrOrderSQLs&","
EndIf
mstrOrderSQLs=mstrOrderSQLs&strOrderSQL&strOrder
EndIf
Nextj
mstrOrderSQLs="orderby"&mstrOrderSQLs
Else
mstrOrderSQLs=""
EndIf
''''字符串连接生成SQL查询语句
strSQL="select"&strKey&"from"&"专家库"&strWhere&mstrOrderSQLs
strsqlAll="select"&strkeys&"from"&"专家库"&strWhere&mstrOrderSQLs
adoconnection.ExecutestrSQL
adoconnection.ExecutestrsqlAll
IfErrThen
MsgBoxErr.Number&vbCrLf&Err.Description&Err.Source,vbCritical,"SQL语句错误"
Err.Clear
ExitSub
EndIf
SetrecResult=NewADODB.Recordset
SetrecKeyword=NewADODB.Recordset
frmQueryResult.strSQL=strSQL
frmQueryResult.strSQL=strsqlAll
recKeyword.OpenstrSQL,adoconnection,adOpenStatic,adLockOptimistic
recResult.OpenstrsqlAll,adoconnection,adOpenDynamic,adLockOptimistic
IfrecKeyword.RecordCount<=0Then
MsgBox"没有您要查找的记录!",vbInformation+vbOKOnly,"找不到记录"
ExitSub
EndIf
''''查询结果显示
frmQueryResult.ShowvbModal
EndSub
篇6
1岩土工程勘察取得的进展及热点
1.1取得的进展
回顾我国推行岩上=工程的十多年来,已经取得的巨大进展表现在以L方面:
(1)我国已经能够解决技术要求、地质条件复杂的岩土工程问题。相应的规范、规程的编制,标志着我国这方面已经积累的经验达到的水。
(2)勘察工作已从单一的钻探、取样、试验、提报告模式发展为多种测试手段、综合评价的模式。多功能静力触探、超重型动力触探、预钻式和自钻式旁压试验、螺旋板载荷试验、孔隙水压力测试、波速试验等新技术的迅猛发展,大大提高了地基评价的水平。室内t工试验中高压同结试验和三轴压缩(剪切)试验的普遍应用,使土力学理论更进一步应用到勘察生产实践中。另外,土的动力性质的试验也曰益增多:桩的动力测试已经列入有关规范、规程和手册中;表面波速法也开始在工程中得到应用;岩土测试的重要性已经越来越显示出来。
(3)勘察与设计、施工密切结合,初步形成了从勘察到设汁、施工、监测,贯穿各个阶段的认识、实践、改造令过程。
(4)地基处理技术水平的大幅度提高。卜多年来为了满足工程建设的需要,引进、发展了多种地基处理技术,积累了相当丰富的经验。对第四纪松散地层、湿陷性黄土、膨胀土、软土、填土、饱和松散粉细砂等各种不良地基,开发和应用了许多新的地基处理技术,己成为岩工程中项重要内容。
工程勘察体制发生了根本性的转变后,勘察结果形成的文件要包括以下重要的技术内容:
(1)场地稳定性的评价,对建筑场地拟建的建筑作出适宜性的技术论证;
(2)为工程设计提供场地各岩土分层、地下水的埋藏条件及其对工程的影响,以及岩土体工程设计参数;
(3)对工程施工过程中可能出现的各种岩土工程问题(如开挖、降水、沉桩等)作出预测,并提出相应的防治措施和合理施工方法的建议;
(4)对拟建场地作出岩土工程评价。对岩土加固(基坑支护)与改良方案或其他人工地基设计方案进行论证和提出建议,并根据设计图纸在岩土工程施工中监控施工质量;
(5)预测由于场地及临近自然环境的变化对建设场地环境和临近建筑物可能产生的变化及其对工程建造的影响;
(6)为已有工程的安全性进行预测性的评定,对拟建工程可能会造成已有工程的不良影响和事故调查分析提供依据;(7)指导岩土工程在建筑物运营、使用过程中的长期观测如建筑物的沉降和变形观测等工作。
1.2岩土工程勘察热点
当前,特殊条件下的岩土工程评价仍然是岩土勘察工程中最普遍最大的热点特殊条件指的是:
(1)特殊土。包括湿陷性黄土、软土、膨胀土、盐渍土等。在特殊土地基上进行工程建设时,必须充分考虑到它们所具有的特殊物理力学化学性质。
(2)特殊工程地质条件。包括岩溶、斜坡与滑坡、泥石流、采空区、地面沉降、地震效应等。其中强震区的砂土液化、断裂、震陷等问题是岩土工程勘察中经常遇见的。
(3)特殊工程。包括高层建筑、动力机器基础、地下工程、水上工程、核电站、道路桥梁、机场跑到、水坝、尾矿坝等。大型建筑地基勘察与评价仍是当前最热门的话题,对可能产生不均匀沉降的预测及对策以及地震效应的抗震设计参数等问题。
2当前建筑工程岩土勘察常见的不足
2.1勘察依据不充分
建筑工程的设计意图必须明确,才能有的放矢地合理布置设计工作量,解决工程设计和施工中的岩土工程问题。《岩土工程勘察规范》(GB50021—2001)明确规定详勘时应“搜集附有坐标和地形的建筑总平面图,建筑物的性质、规模、荷载、结构特点、基础形式、埋置深度和地基允许变形等资料”。但目前市场存在一些不规范行为导致有些工程在无设计要求和建筑物荷载等状况下,勘察单位仅凭业主的陈述,按其要求勘察,导致勘察报告深度和广度不符合要求。如某汽车制造的厂房,设备荷载很大,天然地基承载力远远不够,需用桩基,但造成勘探孔深度不够,桩基设计参数无从谈起,最终导致补勘。所以施工前一定要弄清勘察设计要求和目的,尤其是一些特殊要求,如电阻率测量、基坑支护、地下水渗透性等,才能在广度和深度上满足设计要求。
2.2第一手资料质量下降
对野外及室内测试分析所收集的分散、零乱的原始资料必须经过理论和实践经验进行总结分析,以便于设计人员结合场地特征有针对性地进行设计,是岩土工程勘察不可或缺的重要一环。但是当前该环节存在的大量问题:
(1)对统计概念与理论不明确。在岩土参数的统计与分析中,对异常值不加分析剔除,一律参与统计分析,导致分析误差过大,标准差、变异系数过大,得出场地分忻不合理、不正确的结论。
(2)对岩土参数的取值不理解。对岩土参数的标准值理解片面,不论什么岩土参数均提供标准值。对于工程特性指标(例如标准贯入锤击数、原位测试所得土的强度指标和室内测试土的强度指标等)必须提供标准值、基本值或特征值,士的一般性物理指标统计其平均值、最大值和最小值就可满足要求。
2.3勘察报告缺乏实事求是的科学态度
很多勘察报告往往不问具体工程条件,不具体研究分析,又缺乏必要的理论基础知识和逻辑思维能力,比较多的是一般化、老一套,设计施工真正需要的内容不全或不准。而不需要的内容却洋洋大观。近年来,勘察报告有越写越长的趋势,实际上其中很多内容是重复或者不需要的。
3完善建筑工程岩土勘察工作的措施
3.1确定勘察依据
在建筑工程岩土勘察工程中,就要首先制定好合理的勘察纲要。岩土工程勘察纲要是指导岩土工程勘察各项工作的纲领性文件,是勘察工作顺利完成的保证。应加强勘察市场的监督和管理,及早推行岩土工程监理体制;加强对勘探合同、勘察纲要的审查和管理。防止越级或盲目勘察,加强对勘察报告的审查,对勘察报告中的工作量、勘探质量、资料数据分析及其结论建议逐一进行审查,特别是对基础选型论证,场地稳定性评价及施工建议等内容进行重点把关。防止勘察报告中重视描述,缺乏深入分析的现象发生。从而确保勘察市场的健康发展。其次要合理确定场地地层工程地质性质。如:地层工程地质性质好、埋藏浅且厚度大的地区勘探孔深度可适当减小,勘探间距可适当放宽;而地层工程地质性质差的地区勘探孔深度较深,勘探间距应加密。第三是野外地层的划分应尽量详细。按颜色、状态、湿度甚至钻进难易程度、岩心采取率等不同指标详细划分,为室内资料整理提供最详实的编录地质资料;对多钻机共同作业情况,应首先集中技术人员勘探一二个钻孔,统一编录形式,避免各行其是,尽而造成野外资料分层、定性、描述等难以统一,给资料整理带来困难。
3.2合理整理与编录资料
勘察资料的整理应有现场技术人员的参加。很多勘察单位由于勘察分工比较详细,现场技术人员回来后将现场编录和原始班报表交给报告编写人员就不管了,这样容易造成两者之间的脱节。对原始编录资料、室内化验结果及现场测试、现场拍照等逐一比对,出现异常和矛盾时应认真查明原因,确保资料准确无误。按勘察技术要求,依据各类规范和当地的通常格式做好各类资料的整理工作,各资料整理成果除整理者自检外,尚应有他人再进行校对检查,做到无一纰漏。根据整理出的成果资料,写出勘察报告。由于各勘察场地的岩土特征、拟建建筑物、勘察要求等千差万别,因此勘察报告不能死搬硬套、一成不变,勘察报告应注意重点突出,应具有很强的针对性。同时勘察报告中应特别重视场地的稳定性评价、地基承载力和地基变形的评价以及场地地下水的评价。场地稳定性评价中的地震评价近年来越来越重视,尤其是高层建筑和大规模的建筑场地。地基承载力和地基变形是相辅相成的,与地基基础的选择一起应综合考虑、综合评价,才能取得理想的效果。
3.3合理选择勘察测试手段和方法
不同的勘探方法具有不同的优缺点和适宜性,对勘探装备、勘探手段、取样方法的适宜性和合理性要充分了解。现在有不少勘察企业为了降低成本,大量地布置静探孔,甚至于全静探。在沿海地区的湖沼相和海相冲沉积平原中多分布有淤泥、淤泥质软土、填土,地下水位埋藏较浅,静力触探在这种场地条件下应用效果较好,既能帮助准确分层,又能客观准确地反映地基土的强度性质;而在一些山前冲洪积地层中,由于地层土一般颗粒较粗,地下水位埋藏较深,不适宜静探,甚至在河床河漫滩相的沉积地层中,静探的测试结果也不能准确反映地层的实际情况,一般得出的强度变形指标偏高,所以应用时要适当考虑。标准贯人试验适用于砂土、粉土和一般粘性土,而不适用于碎石土,淤泥、淤泥质软土中也要酌情使用,因为软土的灵敏度高,钻孔时存在扰动影响,同时标贯击数的精确度对评判地基土的强度性质影响也较大。所以勘察施工中,应当针对地基土的性质,用适宜的测试手段和方法对其进行勘探,以确保勘察结果的准确性。
篇7
第一条为提高电力工程的勘测设计水平和质量,鼓励电力勘测设计单位和广大勘测设计人员勇于创新,积极采用新技术、新工艺、新设备和新材料,努力优化勘测设计方案,控制工程造价,推动设计革命的开展,创造水平高、质量优和效益好的优秀勘测和优秀设计成果,根据国家有关部门优秀设计评选的规定,制订本办法。
第二条本办法适用于国家电力公司所属勘测设计单位承担并完成的电力勘测、设计、标准设计、计算机软件(以下简称"四优")项目的申报和评选国家电力公司优秀项目以及推荐国家级优秀项目的工作。
第三条国家电力公司"四优"项目包括优秀工程勘测、优秀工程设计、优秀标准设计和优秀计算机软件。其中,优秀工程设计分为水电、火电、送电、变电以及调度自动化系统几类;优秀工程勘测分为岩土工程、工程测量、水文气象和水资源评价四个专业申报评选。
第四条国家电力公司"四优"项目应在遵守国家有关工程建设的方针、政策和强制性标准,符合安全可靠、经济适用、符合国情原则的条件下,贯彻设计革命的思想,力求技术创新、设计创新,积极引进、消化国外先进技术,在技术水平、技术方案和主要技术经济指标等方面达到国内先进水平,具有良好的经济、环境和社会效益。
第五条国家电力公司"四优"的评选工作每两年进行一次。获得国家电力公司"四优"的项目可以被推荐参加国家级优秀项目的评选。
第二章申报范围
第六条电力工程新建、扩建和改建项目的完整勘测或设计以及标准设计、计算机软件,符合以下范围可以申报国家电力公司优秀项目:
(一)、火电工程单机容量为300MW及以上的项目;其他具有突出特点和技术含量较高的火电项目。
(二)、水电工程总装机容量250MW及以上规模的项目;风力发电项目;其他具有突出特点和技术含量较高的水电项目。
(三)、送电线路工程电压等级为330kV及以上,线路长度50km以上的项目;地下或水底超高压电缆项目;直流输电以及其他电网新技术项目。
(四)、变电工程电压等级在330kV及以上的项目。
(五)、省调及以上调度自动化系统设计项目。
(六)、低于上述容量、规模但具有突出特点的项目。
第七条电力工程标准设计,包括上述范围内项目的典型设计、通用设计和参考设计。
第八条勘测设计单位自行开发、合作开发或从国外引进经二次开发的工程勘测设计及管理软件。
第九条整体工程中的单体建(构)筑物、单位工程、设备、材料、标准(规程、规范)不单独申报。
第十条中外合作设计的国内电力工程项目,主要工艺系统(如火电工程的锅炉岛、汽机岛和仪控岛,送变电工程的换流站)由国外设计的,暂不申报。境外工程项目暂不申报。
第三章申报条件
第十一条符合申报范围的勘测、设计工程项目,投入商业运行一年以上(以每次申报截止日期为准),可申报参加国家电力公司优秀勘测设计项目的评选。
第十二条当一个项目由二个及以上单位完成时,应由勘测、设计工作的主体单位或责任单位申报,并说明主体设计单位与协作单位完成的主要内容和工作量。
第十三条申报优秀项目的主要勘测、设计成员名单,应是对项目的技术水平和创新特点做出贡献的主要勘测、设计人员。每个设计项目申报名额不超过15人,每个勘测、标准设计和计算机软件项目申报名额不超过5人,均按照在项目中贡献大小依次排列。有两个以上设计单位参加的项目,总名额增加2~3人,人员及名次由相关设计单位协商确定。
第十四条各勘测设计单位所申报的设计项目必须取得项目所在地的省电力公司、项目法人单位、生产运行单位和工程监理单位对工程设计和经济效益的评价意见,以及当地(市级以上)环保部门的意见等证明文件。
第十五条各勘测设计单位所申报的勘测项目,其规模应与发电、送变电工程的规模要求相一致。对于岩土工程、工程水文与气象项目,应经一年以上实践检验;工程测量项目应经施工检验;水资源评价项目应经国家储量委员会评审。申报项目应取得施工、运行单位对本工程勘测项目的评价意见等证明文件。
第十六条各勘测设计单位所申报的计算机软件项目,应持有省部级或有关权威单位的鉴定(评审)证书。
第十七条同一个项目只能申报一次,并不得通过其他渠道重复申报。否则,取消其评选资格。
第十八条对于发生过勘测设计重大质量事故、重大设计变更或由于勘测设计的原因发生重大工程事故的项目,一律不得申报优秀工程勘测、设计奖的评选。
第四章评选组织及工作程序
第十九条国家电力公司勘测设计"四优"项目的申报组织、申报材料的接收审查等日常工作,火电和送变电项目委托中国电力规划设计协会进行;水电和新能源项目由水电水利规划设计总院进行。由"电力工程设计四优评审委员会"(以下称"评委会")进行评审。评审结果由国家电力公司批准、公布并颁发证书。
第二十条评选工作程序
(一)、对申报项目的工程有选择地进行现场考察,听取项目法人单位、生产运行单位、工程监理单位、施工安装单位及调试单位的意见,核实有关技术经济指标和证明材料。
(二)、必要时听取项目申报单位的汇报。
(三)、听取专业初评小组初评意见。
(四)、评委会对项目逐个进行审议、讨论并提出评审意见。
(五)、按照评选标准(附件B-I)打分确定国家电力公司优秀项目和排序。
(六)、审议并以无记名投票方式确定推荐国家级优秀项目等级和排序。
(七)、将评审结果报国家电力公司审批。
第二十一条国家电力公司勘测设计"四优"项目的申报材料内容要求与格式见附件A。申报材料一式三份,其中证明文件必须有一份是原件,光盘二份(20分钟以内)。于评选年度2月底前分别报送中国电力规划设计协会和水电水利规划设计总院。
第二十二条申报国家电力公司勘测设计"四优"的项目,每项的申报费为人民币l000元,由中国电力规划设计协会和水电水利规划设计总院代为收取,专门用于评审工作。推荐申报国家级优秀工程勘测、设计、标准设计及计算机软件奖项目的申报费,按建设部规定另行向建设部交纳。
第五章奖励与处罚
第二十三条获得国家电力公司勘测设计"四优"的项目,国家电力公司将给予公布并颁发荣誉证书。
第二十四条获国家电力公司和国家级奖的项目,获奖单位可根据项目的性质、工作量大小、获奖等级等综合因素,对主要人员给予表扬和奖励,并将其成绩记入本人档案,作为考核、晋升的依据。
第二十五条申报评选的项目必须实事求是,不得弄虚作假。评审结果公布后如发现与获奖条件不符或重复申报者,将视情节轻重和影响程度,分别给予该设计院降低奖励等级、撤销奖励、通报批评、暂停两届申报评选资格等处分。
第二十六条评选组织工作必须坚持公平、公正和实事求是的原则,保证评选质量。评委会专家要以严肃、认真和负责的态度参加评选工作。对违反评选纪律者,取消其评委资格。
第六章附则
篇8
1.1加强施工组织本次主桥勘察钻探孔共计11个,其中有4个孔位在无水处低漫滩,7个孔均处于深水江面上,南岸跨堤及引桥处于高河漫滩上,不受江水涨落影响。整桥岩土勘察工期安排70天考虑,主桥主墩勘察孔能否顺利施作是按期提交成果报告的关键,因此,我们采取如下措施。(1)根据场地条件现场组织踏勘,提早确定水上施工的技术方案和质量措施。(2)在投标过程中细化主墩及辅助墩施作前辅助工作相应的工、料图纸及需用量,做到重点考虑,心中有数。(3)进场后立即按已设计好的水上平台方案进行深水主墩勘察孔平台搭设,主墩平台与北辅助墩(低漫滩处)间的水面上通行与运输采取了搭设简易便桥的方案,桥长约200m,平台作业面为5m×36m,平台之间以便桥连结。考虑到主墩探孔施工中江水上涨的可能,平台面高出江水约2.5m,以确保在洪水期到来之前一次完工主墩勘察孔的施作。考虑到平台设备及材料重物堆放,平台立根支撑均采用1m×1m间距、50mm钢管脚手架搭设,架管底部段采用锤击法击入河床1~2m,平台立根合理设置斜撑,使平台在风浪下保持稳固。(4)只要场地条件允许,引桥勘察孔即时施作,采取多上设备,加快外业钻孔取样和原位测试工作。
1.2确保勘察质量,严格执行规范标准
1.2.1引用的规范标准松浦大桥岩土工程勘察遵循和执行的规范有:《岩土工程勘察规范》(GB50021—2001);《市政工程勘察规范》(CJJ56—94);《公路工程地质勘察规范》(JTJ064—98);《公路桥位勘测设计规范》(JTJ062—91);《公路桥涵地基与基础设计规范》(JTJ024—85);《建筑地基基础设计规范》(GB50007—2002);《土工试验方法标准》(GB/T50123—1999);《公路土工试验规程》(JTJ051—93);《中国地震动参数区划图》(GB18306—2001);《建筑抗震设计规范》(GB50011—2001);《公路工程抗震设计规范》(JTJ004—89);《静力触探技术标准》(CECS04:88);《建筑地基基础设计规范》(DB23/902—2005);《哈尔滨市市区地基承载力特征值技术规定(试行)》(HDB001—2005)。规范标准限值采用较高标准级别。
1.2.2采用的勘察方法(1)钻探取样:钻探取样主要分2种形式,一种是上部河床松散砂层(0~40m)段采用SH30型钻机进行跟管冲击取样工艺,下部岩石地层采用XY-2型回转钻进取心工艺,取样按规范标准分层取样,并及时封闭包装送样至试验室分析试验。(2)原位测试:主要采用静力触探、标准贯入试验、波速试验和抽水试验。(3)室内试验:主要进行了原状样物理力学性质试验,包括颗分、压缩、剪切、高压缩、静三轴、岩石单抽抗压强度、水质分析等方法。
1.2.3完成的工程量完成钻探孔16个,进尺1509.3m;测量16点;抽水孔1个,孔深16m,抽水试验2次;岩土原样分析测试,常规土样41件,颗分137件,高压5件,水分析2件,岩石单轴拉压240组,岩石直剪弹模9组;静力触探5个孔,125m;标贯试验70次;波速测试2个孔,201m。
1.3关键环节与控制
相对其它建筑工程岩土工程勘察而言,松浦大桥主桥段勘察工作的重点和关键环节在于深水处主墩、辅助墩钻探孔的施工。
1.3.1水上平台的搭建水上平台是完成水上钻孔取样及原位测试的工作平台,要求作业面宽敞并具足够承载能力以满足施工设备机具、泥浆循环系统正常工作使用。主墩位于江中心深水处,考虑到承重能力和组建拆安的方便性、灵活性,选用如前所述的50mm钢管脚手架并以锤击式植入河床快速搭建完成,整个平台在施钻过程中工作稳定,交通方便,大大提高了工作效率。
1.3.2争抢时间一次性主墩设备进场施工主墩5个钻孔采用的3台XY-2型钻机及相关机具、泥浆材料及制浆设备、循环系统品种较多,数量较大,考虑到7月份江水汛期马上即到,在平台搭设完毕后立即租用了300t(3000kN)托轮,由南岸将平台作业所需全部机具、材料一次吊装托运到平台面上,省去由便桥人工搬运的时间,使平台作业快速进入正常施钻阶段。
1.3.3加固跟管钻进套管连接强度水上主墩钻孔取样必须采取最佳工艺方法以确保钻孔取样原位测试一次成功。深水跟管钻进取样和下部岩石段钻孔取心单孔工期较长,孔壁稳定是保证探孔施工质量的第一工艺要素,上部40m松散砂粒,采用127mm跟管并在管接头螺纹处加焊防松筋的办法以加强套管的联接可靠度,施工证明,该法有效,施工过程中无脱管、断管事故的发生,保证了施工顺利进行。4.3.4采心器具齐全,提高岩心采取率施工中采用了冲击半合管采心器,较破碎岩层采用了双管单动采心器,较完整岩层采用了单管副压式采心器,岩心采取率均达到满意效果。
1.3.5做好泥浆护壁工作因钻孔钻遇有60多米泥砂质岩类,该岩层水敏性极强,遇水膨胀脱落、坍塌可能性很大,因此在做好松散砂层套管护壁的前提下,必须使用低固相优质泥浆进行钻孔护壁。采用了2%优质膨润土加纯碱、聚丙烯酰胺处理的泥浆,并合理设置平台泥浆循环系统(泥浆沉淀箱2m3,循环槽长20m),坚持勤处理、勤检测、勤调整泥浆性能的办法,在5个主墩、2个辅助墩钻孔取样中未发生任何钻孔孔壁坍塌事故,保证了取样顺利进行。
1.3.6把好样品保管、采取、试验关对于现场样品保管和采取要求整齐摆放入箱,并及时进行原样编录,现场拍照存档,现场截取试样,并准确标签,封包要严实,并及时送样至试验室分析。确保勘察资料真实准确。坚持当天样品当天送检,及时出检数据,分析对比,确保数据真实、有效。
2勘察成果
2.1各岩(土)层允许承载力和桩基参数的确定综合室内土工试验和原位测试,结合当地建筑经验,确定勘察孔各岩(土)层容许承载力和桩基参数见表1。
2.2桩基单桩承载力的计算对比按表1各岩(土)层桩基参数计算单桩承载力结果见表2。
2.3桩基沉降估算按主墩底梁反力450000kN、底面积18.5m×40m,单桩承载力25000kN,布桩18根,桩长79m,桩径2.0m,桩距6m,将群桩视为实体基础,桩基沉降估算参数见表3。
3结语
篇9
关键词:建筑工程、地质勘察、因素
近年来,在国内建筑工程项目基础设计工作中,尤其是在部分地质条件较为复杂的地区进行基础设计,设计单位逐步引用地质勘察技术,并且取得了较为理想的效果。但是由于我国地质勘察技术应用在建筑工程基础设计的时间也较短,所以不可避免的存在一定的弊端与问题。如果不能有效的处理与解决建筑工程地质勘察与基础设计中存在的弊端与问题,极有可能导致建筑工程基础设计及施工中出现质量与安全问题。地质勘察报告是建筑工程设计的重要依据,科学的地质勘察报告不仅能提高建筑设计质量,还可节省工程量,减少投资,从而带来较大的经济效益。
一、建筑工程地质勘察的特点和意义
建筑一般分工业建筑和民用建筑,其特性各不相同,但是,它们在使用上却有着极其密切的联系。在进行工业及其民用建筑工程建设的进程中,地质勘察是其中最基础,也是最为重要的一个过程,只有经过认真详尽的地质勘察,选择好经济合理的地基,我们才能保证建筑的安全和质量,才能使工程顺利的进行下去。根据不同的地质条件,我们可以在不同的区段建设不同功能,不同型式的建筑物,使得使用要求和经济技术的矛盾得到恰当的解决。
1.1 工业与民用建筑工程地质勘察的特点
一个城市往往有必要的居住区、文化卫生设施、公用设施,必要的交通路线和枢纽,许许多多各种各样的工厂等大量的建筑物。这些建筑物大多是浅基础建筑物,影响的深度仅仅十几米,基础的砌置深度多小于五米,作用于地基上面的作用力主要是静载荷,因此,对于这类建筑物进行规划设计时所需要进行的工程地质勘察主要有以下三个特点:①勘察中主要的研究对象有:地形地貌特征、土的物理与力学性质、土的剖层面、地下水的埋藏深度、地下水的化学成分以及地下水的动态特性。②在勘察过程中,需要进行大量的浅孔勘探,详尽的分析地下水的情况,对土样进行大量的分析和观测。③通常情况下,按照勘探线和方格网布置进行坑孔的勘探,勘探深度一般以穿过整个活动层为限。
场地的选择和分区在城市规划中占有至关重要的地位,要选择合适的建筑场地,就需要我们从经济条件及其自然条件等多个方面加以论证,因此,在进行城市建筑规划之前进行各个方面的调查是必须要经过的一个程序。其中,工程地质勘察在场地的选择和分区中占有极其重要的作用。在工程场地选择和分区的评价中,主要考虑的工程地质因素有地形地貌特征、水文地质条件、地质结构以及动力地质作用四个方面。
二、建筑工程地质勘察中存在的问题
2.1 地质勘察市场环境较差
目前,随着我国建筑行业的快速发展,以及市场竞争环境的日渐激烈,地质勘察单位在迎来良好发展机遇的同时,也面临了严峻的挑战。由于国内地质勘察单位的迅速增加,而国家及各地区的相关管理机制的不健全,都导致了地质勘察市场中恶性竞争、市场无序、相互压价等现象的存在,这对于行业的整体发展是极其不利的。因此,作为建筑工程的参与者,地质勘察单位要严格自律,坚持从自身做起,共同推进地质勘察市场合理、有序、公平竞争环境的构建与和谐发展。
2.2 对工程地质勘察的重要性和价值认识不够
地质勘察主要是两个方面,一是揭示地质构成,二是提供土体的力学指标;地质构成决定基础处理方案的选择,力学指标对工程造价影响很大。众所周知,地下是看不见摸不着的,只有靠钻探勘察,建设场地是唯一性的,勘察成果也没有可比性,因此建设单位选择一家专业技术强,操作规范严谨,能准确提供成果的勘察单位相当重要,对建筑的安全、工程施工顺利进行、节约投资都有重要的意义。
2.3 建筑工程地质勘察与基础设计中存在的弊端
建筑工程项目设计工作中,基础设计是一项技术要求高、操作复杂、涉及内容较广的具体工作内容。针对不同的地质条件,设计人员要在深入熟悉与了解建筑工程项目建设基本要求、地质条件、水文条件、施工场地周边环境等基本信息的基础上,结合工程项目建设的实际需要,制定出科学、合理、正确的基础设计方案。但是由于我国地质勘察技术应用在建筑工程基础设计的时间较短,所以不可避免的存在一定的弊端与问题。目前,工程设计单位普遍缺乏应用地质勘察协助基础设计的经验等方面因素的限制,国内现有的基础设计水平难以适应现代建筑工程项目建设的实际要求,地质勘察工作的深度不足,水文地质资料尚未实行专业软件进行分析与处理等。
2.4 基础设计人员不够重视地质勘查报告
由于受到现有建筑工程基础设计理念与技术模式的限制和影响,设计人员普遍仅是把地质勘察报告作为简单的参考资料,在参阅中关心的只是所需的各项地质、水文数据,而对于地质勘察报告中部分专业的技术参数与建议视而不见而地质勘察单位在为建筑工程设计单位提供服务时,勘察人员多是将工作的重点集中于报告的专业性与理论性,对于其实用性与可行性的考虑则相对较少,往往导致设计人员在阅读与应用中出现技术障碍。由此可见,国内建筑工程基础设计工作中,地质勘察与基础设计缺乏有效的结合与互补,难以全面发挥两者所具有的特殊意义和作用,最终导致人力、物力、财力的无形浪费与损失。
三、工程地质勘察行业制度不健全
虽然新的《岩土工程勘察规范》GB50021-2001(2009版)已经,并且在勘测程序和新技术的应用方面都已经明显地落后于时代的发展,一经颁布实施就难以把握。更为令人难以理解的是另一部国标《岩土工程勘察规范》并不完全适合于水利水电工程地质,而建设部的一些工程勘察监督机构则以此为依据对水利水电勘测设计单位实施质量检查,使勘测单位不得不准备满足两种规范的两套地质报告分别对付审查和检查。规程规范的修订和出台周期太长,完全不能满足工程建设的需要。水利系统与水电系统的勘测设计阶段不一致,规程规范也有区别。规程规范的问题较多,甚至产生了一些混乱。近年来一些单位提交的勘测设计报告中的地质章节不是地质师写的,报告的编制人中没有地质专业负责人,或地质报告没有院级地质负责人审查把关,报告和图纸中的错误较多。这种情况给总院增加了审查难度,同时也有损勘测设计单位的质量和水平形象,还会延误工程报批的时机。当然也有上级单位工程审查把关不严,助长了这种技术责任心不强的现象。
四、工程地质勘察缺乏监管
一是工程地质勘察在工程的前期阶段进行,由建设单位自主选择勘察单位,一般建设单位缺少这方面的专业知识,对地质勘察的重要性认识不足,因此对勘察单位要求不高,有个成果就可以,钻探费用上考虑多点,对技术的要求就轻了。二是地质勘探是野外作业、土工试验和资料整理,整个过程只有勘探单位独自完成,没有监督,到底钻了几个孔,钻了多深,取了多少土样,土工试验做了多少,这些都存在漏洞,是勘探单位的“良心”活。现在施工图审查也对地质勘察成果进行审查,那都是事后了,只要资料造得过得去都能通过,地质构成与实际施工严重不符时有发生,力学指标的精确性更是无法判别。
篇10
1工程地质勘察的质量问题
在工程地质勘察过程中,一般问题较多的是工程的概念不清.勘探侧重点不明确针对性不强,疗法不当,手段落后:工程地质分析工作中所选择的理论、方法、计算公式等与实际情况有较大出入其适应条件的物理意义混淆不清;地质报告中基本地质条件不清楚。主要工程地质问题界定不准确或论证不充分.有问题遗漏甚至结论性错误:有些地质报告没有地质结论.也有些工程没有做多少地质工作就先下结论,极不严肃。此类问题往往造成阶段性工程审查不能一次性通过.可能延误开发时机;或者尽管通过了审查,但却给工程留下了隐患,这种情况的危险性更大。
2相关专业的理解问题
一种情况是地质师对其它专业不理解.这需要加强跨专业的学习。另一类现象是设计施工等相关专业对工程地质的不理解。有的不懂地质却偏要提出一些不切实际的勘探要求。有的工程由设计人员来布置地质勘探工作:有的设计人员对地质专业知其然不知其所以然,自以为是包打天下,不结合地质条件设计不当:也有的是不尊重自然地质规律,野蛮施工.严重破坏地质体的自然结构,造成重大工程事故。所有这些非地质专业的问题。往往在出了问题之后又向地质专业推卸责任,令地质师们不知所云。工程地质界知名专家学者孙广忠教授指出:“实际上.在地质工程实践中脱离地质实际的实例随手可拾,可以说.地质工程旌工中出现事故的绝大部分是设计和施工脱离地质实际的结果.或者是对工程地质条件没有搞清楚或认识不清的结果。如果离开了地质基础,则其理论必将脱离地质实际必将作出错误的结论”。潘家峥院士等前辈专家早已强调过地质学水工,水工学地质。足以可见专业之问的交叉渗透问题。早已被专家们的真知灼见道出了关键,就看我们作何行动。
3勘测周期不合理的问题
从工程地质勘察到地质报告的提交需要一定的工作周期。这是再简单不过的道理。但有些工程没有基础性的前期投入,一旦要报项目应即就要求提交地质报告;还有些工程是今天提交了可研报告,明天就提交初步设计报告。此类情况多为地方性工程,一般国家投资的大型工程出现这种情况的不多。没有足够的勘测周期所造成的后果是严重的。地质条件不清楚,投资控制不住。施工后修改设计威由于地质问题造成承包商巨额索赔等等。更可怕的是留下了工程隐患.可能造成重大工程事故。
4规程规范的问题
规程规范的问题较多.甚至产生了一些混乱。水利系统与水电系统的勘测设计阶段不一致.规程规范也有区别。历经十多年的编写报批。1999年才颁布的国家标准《水利水电工程地质勘察规范》在勘测程序和新技术的应用方面都已经明显地落后于时代的发展,一经颁布实施就难以把握。更为令人难以理解的是另一部国标《岩土工程勘察规范》并不完全适合于水利水电工程地质,而建设部的一些工程勘察监督机构则以此为依据对水利水电勘测设计单位实施质量检查。使勘测单位不得不准备满足两种规范的两套地质报告分别对付审查和检查。规程规范的修订和出台周期太长,完全不能满足工程建设的需要。水利与水电分家之后.对于工程地质这个专业来说其工作性质是一样的。但却存在不同的技术标准和勘测程序,这种情况还要继续下去需要寻求解决或协调方案。
5人才问题
高质量高水平的工程地质分析成果,出自于高水平高素质的地质师。有人说二、三年就可以培养出地质专家,实属无知。要培养出一个具有工程地质分析能力,能够解决复杂问题的地质师,没有十年以上的功夫,大量的工程实践,自身的敬业精神.理论联系实际,相关学科专业的学习和渗透.是决不可能的。十年树木百年树人,在地质师的培养过程中可以充分体现出来。培养优秀地质师的难度可以说远远超过培养博士、研究员和教授的难度。