绿色建筑的施工方案范文

时间:2023-12-15 17:33:17

导语:如何才能写好一篇绿色建筑的施工方案,这就需要搜集整理更多的资料和文献,欢迎阅读由公务员之家整理的十篇范文,供你借鉴。

绿色建筑的施工方案

篇1

Abstract: Firstly, the characteristics of green building construction are summarized, and the current green building construction management faced with pattern backwardness and lack of functional requirements and life cycle cost concepts, which make construction scheme optimization and selection confusion are put forward. Next, the value engineering is used to green construction according to green building construction characteristics, and the functional requirements and life cycle cost factors of green building are clarified. Then the construction schemes are optimized and selected via value engineering. Finally, taking the example of green demonstration project of China - Denmark Research and Education Center, the application of value engineering theory in green construction is introduced.

关键词: 绿色建筑施工方案优选;价值工程

Key words: green building;construction scheme optimization and selection;Value Engineering theory

中图分类号:TU201.5 文献标识码:A 文章编号:1006-4311(2017)15-0050-04

0 引言

当下城市化进程加剧、基础建设量激增、节能减排及环境治理压力巨大等因素决定了中国建筑节能工作的重大意义和紧迫性[1]。然而,国内绿色施工大多采用传统方法,较少涉及绿色管理内容[2],并且在施工中缺少对绿色建筑全寿命期功能性和成本方面的考虑,致使绿色建筑各阶段的方案优化、选择比较混乱[3]。如此重要的管理内容必然要求有好的方法做支撑。价值工程(Value Engineering)是通过经济技术的协同,对研究对象进行功能及成本分析,持续创新,旨在节省成本、提高价值的资源节约型管理技术和思想方法[4],在国际上已有60余年实践,其低投入高回报的优势在制造业、农业、科研、工程方面取得很好的应用。因此,结合绿色建筑特点,将价值工程应用于绿色施工方案优化与选择,可为提高绿色施工效率提供一种新思路。

1 绿色节能建筑施工管理研究现状

绿色节能建筑施工是在保证工程安全、质量前提下,在施工中做到“四节一环保”,通过科学有效的技术和管理措施,优化用能结构、降低环境负面影响,以人为本,保障人员安全健康的施工方式[5]。结合绿色施工定义及国内外的绿色施工文献[2,6,7],总结出绿色施工4个特点:

①以客户为中心,在满足传统目标的同时,考虑建筑的环境属性。绿色建筑的出发点是节约资源、保护环境,满足客户的需求,管理人员需要更多地了解用户的需求、偏好及施工过程对用户的影响,优先考虑环境属性,讲究与自然和谐相处。将环境破坏程度降到最低,将不利影响转换为有利影响,不仅要交付一个舒适健康的内部空间,还要一个和谐的外部环境,最终追求“天人合一”的目标。

②最大限度利用被动式节能设计(Passive Design)与可再生能源。在建筑的运营阶段需要尽量使用可再生的能源与自身的节能。可以在方案中提倡被动式建筑设计,通过建筑物本身收集、储蓄能量使得与周围环境形成自循环系统。被动式节能设计的方法有建筑朝向、保温、体形、遮阳、自然通风、采光等。另外在决策设计中也要合理利用光能、风能、地热等可再生能源。

③注重全局、全寿命期优化。绿色建筑从项目的策划、设计、施工、运营直到筑物拆除过程中追求的是全寿命周期范围内的建筑收益最大化,是一种全局的优化,这种优化不仅仅是总成本最低,还包括社会效益和环境效益最大化,采取技术经济措施,做到一次投入,全寿命期受益。

④重创新,提倡新技术、新材料、新器械的应用。绿色建筑是一个技术的集成体,在实施过程中会遇到诸如能源优化、管线的优化、采光设计等的技术问题。这就需要利用多种先进技术、新材料及新器械,将同等单位的资源在同样的客观条件下,发挥更大的效能。国内外实践中应用较好的技术方法有BIM、采光技术、水资源回收利用等技术。

目前国内绿色施工多以传统的施工流程为基础,在应对绿色施工绿色节能、全寿命周期优化以及持续创新的特点时显得有些欠缺。选取国内外文献[8,9]及绿色建筑施工案例包括:北京某奥运场馆、深圳市康沃工业园、钦州市公安局指挥中心等进行深入研究。发现业主一般采用平行承发包的方式招标勘察、设计、施工、监理等单位,各方目标不一致,缺乏统一的绿色建筑成本节约目标和经济技术分析方法,致使很多勘察阶段的问题暴露在设计、施工、运营中,会增加返工补救措施,加之绿色节能指标和全寿命周期成本考虑不足,造成前期的方案优化、选择比较混乱,给后期的运营维护增添很大负担。因此,对绿色建筑施工方案进行优化是很有必要的。

2 价值工程在施工方案优化中的应用

目前绿色建筑施工与绿色建筑的需求不匹配,可以将施工流程向全寿命周期延伸,并考虑绿色功能和全寿命周期成本的均衡。鉴于价值工程强大的成本、功能分析,新方案创造及评估的作用,可从全寿命期的角度给出功能定义和成本的主要因素,确定绿色建筑的节能对象以及改进规划、设计、施工及维管等方案选择与改进,实现多目标约束下均衡、优化绿色管理内容。本文将价值工程方法引入绿色建筑施工方案的优化与选择。

2.1 价值工程的原理

价值工程中的价值是一个特定的概念, 它是功能与实现这一功能所耗成本的比值。其数学表达式为:

V=F/C(1)

其中:V 表示价值系数,F 表示功能系数, C表示成本系数。这一公式使功能和成本变成相互可比的数值,可以衡量工程、材料、构件等的功能与成本匹配问题,从而取得好的技术经济效果。一般存在5条提高价值的途径,见表1。

2.2 价值工程在绿色施工方案优化应用

价值工程的主要思想是整合现有资源,优化安排以获得最大价值,主旨是抓住和利用关键问题和主要矛盾,整合技术与经济手段,系统地解决问题和矛盾。因此,价值工程在绿色施工中主要用途有两方面:挑选出价值高、意义重大的问题,予以改进提升和方案比较、优选。其流程为:

①确定研究对象。在价值工程基础上常用的方法有ABC法和比较法而比较法,两种方法对比见表2。

②全勖周期功能指标及成本指标定义。在确定研究对象之后,进行功能定义和成本分析。参照LEED标准[10]、绿色建筑评价标准[11]以及实践经验总结绿色建筑研究对象的功能的主要内容,见表3。价值工程理论一般将功能分为:基本功能、附属功能、上位功能以及假设功能[12],基本功能关注的是使用价值和功能价值,即该产品能做什么;附属功能一般是辅助作用,一般是外观设计,关注的是产品还有其他什么功能;后两种功能超出产品本身,一般不在功能分析里讨论。

全寿命周期成本一般包括:初期投入成本和后期的维护运营成本[4]。细化来看初期成本包括:直接费(原材料费用、人工费、设备费用)、间接费、税金等;后期的运营费包括:管理费、燃料动力费、大修费、定期维护保养费、拆除回收费等。

③恶劣环境下样品试验。由于建筑物的绿色特性,在设计施工中常常会用到一些新材料、构件,此时需进行样品加工、交检,经检验员对样品进行恶劣环境下如高温曝晒、干燥、潮湿、酸碱等环境下试验,由质监员根据样品的性能指标做最终评审,并记录各项实验指标。

④价值分析。对研究对象进行价值分析,可以有效地避免功能过剩和功能不足。在计算价值系数时,需要进行功能分析确定F,成本计算确定C。

对于功能系数,首先根据功能定义,在试验中确定指标的大小,然后通过专家评判确定指标所占权重,最后计算功能系数,假设研究对象包含n个功能指标,为x1,x2,…xi…,对应的权重为w1,w2,…wi…则:

对于成本系数,需要先收集影响指标,然后确定指标大小以及所占权重,通过归一化处理得到无量纲数据,最后计算成本系数C:

C=C前期+C维护(6)

其中,C代表成本系数,C前期代表初期投入的成本,C维护为后期运营维护的成本,成本系数也是无量纲数据。结合式(1)、式(2)、式(3)、式(4)(或式(5))及式(6)可以计算各方案的价值系数,然后对价值量进行分析。

⑤方案评价及选择。依据样品试验以及所求的价值系数,利用价值工程原理对已有方案进行价值提升或者对于新方案进行优选。

3 案例应用

3.1 工程概况

中国-丹麦科研教育中心绿色示范工程为丹麦全额捐建,是其在中国投资的第一个科研教育建设项目,面积10865.48m2,工程造价为9310万元,由中铁建工集团总承包,从项目决策、设计、施工过程中严格落实LEED的绿色施工要求,项目部本着可持续发展的理念精心策划,科学组织绿色施工。工程集科研教育、教学、公寓于一体的综合性微能耗建筑,工程以其节能低耗环保而被称为“会呼吸的建筑”。从全寿命周期角度出发,在策划阶段初期就介入项目论证,参与了建筑策划、设计、施工等过程,应用价值工程进行关键问题改进优化和新技术、材料、机械等方案优选。在策划阶段将价值工程方法应用到高价值方案的审核;在设计阶段大到主体和各绿色方案,小到各单项工程、构件的对比,方案的优化与选择,如采光、通风被动式节能方案优化;在施工阶段可以将价值工程应用到绿色材料、新技术工艺的选用,通过对比,试制,确定可行方案以及选取关键主要的节能对象予以方案改进,比如天花吊顶材料、TABS管等材料选取,编织状耐候钢遮阳板施工工艺优化等。在之后的运营维护阶段,价值工程还可以用于运营维护方案的优化以及关键故障的维修。以下对价值工程在天花吊顶方案优选的应用做重点介绍。

3.2 价值工程在天花吊顶绿色材料方案选择的应用

天花吊顶施工方案根据丹麦设计风格及其设计特点、工艺要求、使用功能要求进行设计及深化改进。最初有芍址桨福悍桨1为木制天花,材料为松木聚合件,松木的生长周期长、木材的质地柔韧,而且本身的阴阳色分布均匀,美观、环保;方案2是竹天花,材料为南方的毛竹,利用竹材本身,做简单处理,其中竹材繁殖能力强、速度快、直径小、壁薄、木质素、纤维素组成特殊。以下对价值工程在两种方案中对比选优进行阐述:

3.2.1 圆形木桶天花功能系数计算

天花吊顶是一种特殊的装饰结构,包含诸多功能属性。借鉴文献[13,14]及实践中材料选择所用的功能标准,选取了F1到F9的功能指标,其中,F1到F7为基本功能,F8,F9为附属功能。通过对业主、项目部、设计部门以及供货商代表进行调查,采用专家打分法对功能满意程度进行打分,见表4;然后确认各功能的重要性系数,如表5;结合表4与表5的内容,对应相乘得表6功能得分。

根据式(2)求得:方案1的功能系数F1=8.35;方案2的功能系数F2=6.88。

归一化后:F1=0.548,F2=0.452。

从方案功能系数得分上看方案1要比方案2得分高,但从功能构成上看,方案1松木天花在环保、绿色及节能属性上不如竹天花,这和竹制天花是原竹加工,而松木天花是经过聚合加工有关,然而这也导致在其余属性上竹天花不如松木天花;从功能指标重要性上看,项目参与方认为材料的稳定性是最重要的,整体性、防火、防潮以及施工简易程度上也是比较重要的,竹天花选材使用的是南方的毛竹,对北方干燥的气候适应性不如松木,容易开裂,导致其在稳定性和整体性方面得分较低,同时,竹天花生产加工厂商少,属于定制产品,货源供应不充足,也增加了施工的难度。

3.2.2 圆形木桶天花成本系数计算

在充分考虑了方案1与方案2的材料成本、运输成本、施工成本以及运维保养成本后,采用竹天花的单位成本要高于圆形木桶天花,两方案的成本系数为:C1=0.429,C2=0.571。

3.2.3 圆形木桶天花价值功能系数计算

根据式(1)可求得:V1=F1/C1=0.548/0.429=1.279;

V2=F2/C2=0.452/0.571=0.791。

根据价值工程原理,方案1的价值系数大于1,说明各项功能重要程度要大于成本;方案2的价值系数小于1,说明成本的重要程度是高于功能。从两方案的实际成本以及项目利益相关方对两方案功能的评价上可以看出松木圆形木桶天花方案价格和功能上都要胜出,为物优价廉的材料,因此在施工中选用方案1。图1为天花吊顶的情况,图1(左)为吊顶的装饰效果图,图1(中)为天花单元的效果图,图1(右)为所选松木天花圆筒组件的实物图。

4 结语

梳理了绿色节能建筑施工特点,明确了当前绿色建筑施工对从全寿命周期的功能设计和成本考虑方面的不足;从绿色建筑施工特点出发,将价值工程引入到传统施工中,对施工方案进行优化和选择;通过在中国-丹麦科研教育中心绿色示范工程中的应用,取得了很好的效果。在对绿色施工方案优选的基础上,可进一步对其他关键问题进行深入研究,比如绿色节能建筑施工的管理模式,施工的进度、费用、信息、风险的协同管理以及知识管理等,从而提高绿色节能建筑施工的管理水平,为绿色节能建筑施工做好示范先导作用,为后续项目提供借鉴。

参考文献:

[1]肖绪文,冯大阔.建筑工程绿色施工现状分析及推进建议[J].施工技术,2013,42(1):12-15.

[2]N W, Y Y H, J H Z, et al. Elementary Introduction to the Green Management of the Construction in Whole Process[J]. Physics Procedia, 2012: 1081-1085.

[3]何小雨,王佳杰.价值工程在绿色施工方案优化中的应用研究[J].安徽建筑大学学报,2016,24(1):44-48.

[4]付建兵,邱菀华,易卫平.价值工程在建筑节能中的应用[J].中国能源,2006,28(6):14-16.

[5]鲁荣利.建筑工程项目绿色施工管理研究[J].建筑经济,2010(03):104-107.

[6]Hwang B G, Ng W J. Project management knowledge and skills for green construction: Overcoming challenges[J]. IEEE Engineering Management Review, 2013, 41(2):87-103.

[7]Lockwood C. Building the green way[J]. Harvard Business Review, 2006, 84(6):129.

[8]Wu P, Low S P. Project management and green buildings: lessons from the rating systems[J]. Journal of Professional Issues in Engineering Education and Practice,2010,136(2):64-70.

[9]薄卫彪,周明.常用工程项目管理模式在绿色建筑项目中应用的研究[J].工程管理学报,2010,24(1):46-49.

[10]张志勇,姜涌.从生态设计的角度解读绿色建筑评估体系――以CASBEE、LEED、GOBAS为例[J].重庆建筑大学学报,2006,28(4):29-33.

[11]中国建筑科学研究院.GBT0378―2006,绿色建筑评价标准[S].北京:中国建筑工业出版社,2006.

[12]斯图尔特.价值工程方法基础[M].机械工业出版社,2007.

篇2

【关键词】;绿色施工;前期策划;实施方式

前 言

伴随着社会环保意识的加强,近两年来,绿色施工得到快速地发展。然而,一些项目在绿色施工施行的过程中,出现了管理混乱、执行不力、达不到预期目标的等问题。这些问题的出现,归根到底,都是前期策划不周全造成的。因此,合理的前期策划是绿色施工顺推进行的关键。

1 策划特点

1)全面动员项目人员,依照前期策划,各取所长,互相配合完成绿色施工前期策划。

2)会同有关事业单位、甲方、设计单位参与研究预期施工方案,根据实际情况,因地制宜,研究讨论施工方案可行性,制定绿色施工方案。

3)建立绿色施工监督管理制度,明确有关人员责任,并做到对施工现场实时监控,确保绿色施工方案真实有效。

4)安排绿色施工主要负责人前往各地学习先进绿色施工工艺、策划方案,并提出符合本项目的施工建议。

5)邀请业内绿色施工方面的权威专家对项目进行实地考察,总结、学习有关专家的指导意见。

2 策划流程与策划要点

2.1 前期策划流程设计

明确工程概况搜集有关法律法规明确绿色施工目标明确绿色施工管理人员制定绿色施工管理制度制定绿色施工施工方案会同各方进行可行性分析确定最终施工方案开始施工总结推广

2.2 前期策划实施方式

2.2.1 根据工程概况,分析周围环境,明确绿色施工区域及相关要求。

2.2.2 搜集相关法律法规及行业规范,全面贯彻国家工程建设的法律、法规、规章和制度,明确绿色施工方案编制原则。

2.2.3 制定绿色施工总体施工目标,提出预期经济目标、环境保护目标,并杜绝事故发生,同时根据施工目标制定绿色施工考核指标。

2.2.4 明确绿色施工管理人员,制定绿色施工管理体系,明确管理人员责任划分。

2.2.5 制定绿色施工相关管理制度,包括编制:环境保护管理制度、培训制度、评价制度、问题检查及整改制度、资料归档制度、应急方案、奖罚制度等。

(1)环境保护制度应当涉及施工现场噪声、污染、节能与能源利用、大气污染、节材与材料资源利用、节水与水资源利用、节地与施工用地保护等方面,明确各个部分环境保护范围与目标,实现对相应具体目标的有效管控。

(2)培训制度应当实现对相关人员的施工培训、交底,同时安排人员学习行业优秀做法。

(3)分析评价指标,确定环境保护指标,资源保护规定,现场优选管理措施,材料、水、地、能源利用评价指标,实现量化评价指标。

(4)制定监督与问题整改制度,实现实时监督与问题反馈,从而达到绿色施工有效推进。

(5)完善资料归档制度,利于改进相关工艺与日后推广。

(6)针对意外发生时编制相应的应急预案,作好必要的物质、设备、材料、资金等资源准备,制定事故发生时的应急措施。

(7)针对绿色施工工作,单独设置奖罚办法,以鼓励各参加人员的积极性,对影响施工的行为也进行严厉的处罚,确保绿色施工能落到实处。

2.2.6 根据绿色施工目标及管理制度,制定各部分具体的绿色施工方案。包括具体的施工工艺,机械、材料、劳动力安排。

2.2.7 根据已编制的管理制度及施工方案,邀请有关政府部门、甲方、监理、相关专家,公司项目负责人员及其他有关人员进行会谈,研究方案可行性,项目将积极听取各方提出的建议,完善、修改绿色施工施工方案。

2.2.8 根据各方的意见最终确定施工工艺及相应的预算安排。

2.2.9 安排人材机入场,开始实施绿色施工。

2.2.10 施工进入一定阶段后开始对绿色施工过程中使用的新技术和新方法进行总结和推广,以获得社会认可,提升企业形象。

3 效果评测

绿色施工前期策划是对绿色施工全过程管理中的主要一步,是确保相关效益的前期基础。通过相关施工过程,达到以下效益:

经济效益:提高相关材料、机械、能源利用率;循环回收利用建筑垃圾及水资源;使用太阳能,节约用电。

环境效益:减少施工现场垃圾、废气、废水排放,降低噪音污染、化学光污染及粉尘污染。

社会效益:通过实行绿色施工,获得有关单位、媒体及居民积极评价,提升企业形象。

4 结语

绿色施工前期策划,是在施工现场现有基础上推行的系统活动,其具有目的清楚、流程明确的特点。通过对施工方案及预期目制作前期筹划,一方面可以顺利推进绿色施工工作,另一方面可以极大提高施工效果。总而言之,精心的策划是绿色施工必不可少的一部分。

参考文献:

[1] 齐宝库;王欢;刘霞;基于可持续发展理念的建筑业绿色施工必要性探讨[J];建筑与预算;2012年第4期.

[2] 金志强;浅谈绿色施工的重要意义及其具体措施[J];城市建设理论研究;2013年第23期.

篇3

【关键词】施工过程;绿色施工;管理;发展

1 绿色施工发展现状

20 世纪80 年代,在循环经济和清洁生产思想指导下,发达国家开始探索实践绿色施工,日、美、德等发达国家分别制订了相应的法律、法规、政策,使得绿色施工的发展得到了制度保障。进入21 世纪,随着可持续发展理念的广泛传播,我国建筑业界对绿色施工有了新的认识,建筑施工企业首先提出了绿色施工倡议,认为绿色施工是一项复杂的系统工程,绿色施工的实现不仅单纯依赖绿色施工技术,同时需要全面考虑施工现场场地环境、资源利用、废弃物处理以及现场施工组织管理等因素。当前我国绿色施工的实施主体是建筑企业,但部分建筑企业没有把绿色施工能力作为企业的竞争力,未能充分运用科学的管理方法、采取切实有效的行动做到保护环境、节约能源,只注重按施工合同、图纸和技术要求、项目计划及项目预算完成项目各项目标,只关心质量、安全、工期和成本,而较少涉及绿色施工。

2 绿色施工概念

什么是绿色施工?《绿色施工导则》中绿色施工的含义为:工程建设中,在保证质量、安全等基本要求的前提下,通过科学管理和技术进步,最大限度地节约资源与减少对环境有负面影响的施工活动,实现“四节一环保”(节材、节水、节能、节地和环境保护)。《绿色施工管理规程》中绿色施工的含义为:建设工程施工阶段严格按照建设工程规划、设计要求,通过建立管理体系和管理制度,采取有效的技术措施,全面贯彻落实国家关于资源节约和环境保护的政策,最大限度节约资源,减少能源消耗,降低施工活动对环境造成的不利影响,提高施工人员的职业健康安全水平,保护施工人员的安全与健康。

综上所述,本文将绿色施工定义为:在保证工程安全、质量前提下,在施工过程中做到“四节一环保”,通过科学管理和实施有效技术措施,最大限度地节约资源和减少对环境的负面影响,提高施工人员的职业健康安全水平,保护施工人员的安全与健康,从而满足建设资源节约型、环境友好型社会需要的施工方式。

3 绿色施工管理

从绿色施工的定义可以看出,实现绿色施工要靠科学管理和技术进步,二者缺一不可。但定义中将科学管理置于技术进步之前,说明科学管理比技术进步重要,其包含的实质内容也是管理重于技术。《绿色施工导则》中绿色施工要点之一的绿色施工管理主要包括组织管理、规划管理、实施管理、人员安全与健康管理和评价管理五个方面,下面从这些方面重点阐述如何进行绿色施工管理。

3.1 组织管理

组织管理就是设计并建立绿色施工管理体系,通过制定系统完整的管理制度和绿色施工整体目标,将绿色施工有关内容分解到管理体系目标中去,使参建各方在建设单位的组织协调下各司其职地参与到绿色施工过程中,使绿色施工规范化、标准化。

3.1.1 绿色施工管理体系。可采取以下措施:①设立两级绿色施工管理机构,总体负责项目绿色施工实施管理。一级机构为建设单位组织协调的管理机构(绿色施工管理委员会),其成员包括建设单位、设计单位、监理单位、施工单位。二级机构为施工单位建立的管理实施机构(绿色施工管理小组),主要成员为施工单位各职能部门和相关协力单位。建

设单位和施工单位的项目经理应分别作为两级机构绿色施工管理的第一责任人。②各级机构中任命分项绿色施工管理责任人,负责该机构所涉及的与绿色施工相关的分项任务处理和信息沟通。③以管理责任人为节点,将机构中不同组织层次的人员都融入到绿色施工管理体系中,实现全员、全过程、全方位、全层次管理。

3.1.2 任务分工及职能责任分配。①管理任务分工。在项目实施阶段应对各参建单位的管理任务进行分解。管理任务分工应明确表示各项工作任务由哪个单位或部门(个人)负责,由哪些单位或部门(个人)参与,并在项目实施过程中不断对其进行跟踪调整完善。②管理职能责任分配。

3.1.3 建立项目内外沟通交流机制。绿色施工管理体系应建立良好的内部和外部沟通交流机制,使得来自项目外部的相关政策,项目内部绿色施工实施执行的情况和遇到的主要问题等信息能够有效传递。

3.2 规划管理

规划管理主要是指编制执行总体方案和独立成章的绿色施工方案,实质是对实施过程进行控制,以达到设计所要求的绿色施工目标。

3.2.1 总体方案编制实施。建设项目总体方案的优劣直接影响到管理实施的效果,要实现绿色施工的目标,就必须将绿色施工的思想体现到总体方案中去。同时,根据建筑项目的特点,在进行方案编制时,应该考虑各参建单位的因素:①建设单位应向设计、施工单位提供建设工程绿色施工的相关资料,并保证资料的真实性和完整性;在编制工程概算和招标文件时,建设单位应明确建设工程绿色施工的要求,并提供包括场地、环境、工期、资金等方面的保障,同时应组织协调参建各方的绿色施工管理等工作。

②设计单位应根据建筑工程设计和施工的内在联系,按照建设单位的要求,将土建、装修、机电设备安装及市政设施等专业进行综合,使建筑工程设计和各专业施工形成一个有机统一的整体,便于施工单位统筹规划,合理组织一体化施工。同时,在开工前设计单位要向施工单位作整体工程设计交底,明确设计意图和整体目标。③监理单位应对建设工程的绿色施工管理承担监理责任,审查总体方案中的绿色专项施工方案及具体施工技术措施,并在实施过程中做好监督检查工作。④实行施工总承包的建设工程,总承包单位应对施工现场绿色施工负总责,分包单位应服从总承包单位的绿色施工管理,并对所承包工程的绿色施工负责。实行代建制管理的,各分包单位应对管理公司负责。

3.2.2 绿色施工方案编制实施。在总体方案中,绿色施工方案应独立成章,将总体方案中与绿色施工有关的内容进行细化。①应以具体的数值明确项目所要达到的绿色施工具体目标,比如材料节约率及消耗量、资源节约量、施工现场环境保护控制水平等。②根据总体方案,提出建设各阶段绿色施工控制要点。③根据绿色施工控制要点,列出各阶段绿色施工具体保证实施措施,如节能措施、节水措施、节材措施、节地与施工用地保护措施及环境保护措施等。④列出能够反映绿色施工思想的现场各阶段的绿色施工专项管理手段。

3.3 实施管理

实施管理是指绿色施工方案确定之后,

在项目的实施管理阶段,对绿色施工方案实施过程进行策划和控制,以达到绿色施工目标。

3.3.1 绿色施工目标控制。建设项目随着施工阶段的发展必将对绿色施工目标的实现产生干扰。为了保证绿色施工目标顺利实现,可以采取相应措施对整个施工过程进行控制:①目标分解。绿色施工目标包括绿色施工方案目标、绿色施工技术目标、绿色施工控制要点目标以及现场施工过程控制目标等,可以按照施工内容的不同分为几个阶段,将绿色施工策划目标的限值作为实际操作中的目标值进行控制。②动态控制。在施工过程中收集各个阶段绿色施工控制的实测数据,定期将实测数据与目标值进行比较,当发现偏离时,及时分析偏离原因、确定纠正措施、采取纠正行动,实现PDCA 循环控制管理,将控制贯穿到施工策划、施工准备、材料采购、现场施工、工程验收等各阶段的管理和监督之中,直至目标实现为止。

3.3.2 施工现场管理。建设项目环境污染和资源能源消耗浪费主要发生在施工现场,因此施工现场管理的好坏,直接决定绿色施工整体目标能否实现。绿色施工现场管理应包含的内容有: ①明确绿色施工控制要点。结合工程项目的特点,将绿色施工方案中的绿色施工控制要点进行有针对性的宣传和交底,营造绿色施工的氛围。②制定管理计划。明确各级管理人员的绿色施工管理责任,明确各级管理人员相互间、现场与外界(项目业主、设计、政府等)间的沟通交流渠道与方式。③制定专项管理措施,加强一线管理人员和操作人员的培训。④监督实施。对绿色施工控制要点要确保贯彻实施,对现场管理过程中发现的问题进行及时详细的记录,分析未能达标的原因,提出改正及预防措施并予以执行,逐步实现绿色施工管理目标。

3.4 人员安全与健康管理

贯彻执行ISO14000 和OHSAS18000 管理体系,制订施工防尘、防毒、防辐射等措施,保障施工人员的长期职业健康。合理布置施工场地,保护生活及办公区不受施工活动的有害影响。提供卫生、健康的工作与生活环境,加强对施工人员的住宿、膳食、饮用水等生活与环境卫生等管理,改善施工人员的生活条件。施工现场建立卫生急救、保健防疫制度,并编制突发事件预案,设置警告提示标志牌、现场平面布置图和安全生产、消防保卫、环境保护、文明施工制度板、公示突发事件应急处置流程图。

3.5 评价管理

绿色施工管理体系中应建立评价体系。根据绿色施工方案,对绿色施工效果进行评价。评价应由专家评价小组执行,制定评级指标等级和评分标准,分阶段对绿色施工方案、实施过程进行综合评估,判定绿色施工管理效果。根据评价结果对方案、施工技术和管理措施进行改进、优化。常用的评价方法有层次分析法、模糊综合评判法、数据包络分析法、人工神经网络评价法、灰色综合评价法等。

4 结语

绿色施工作为在建筑业落实可持续发展战略的重要手段和关键环节,已经被越来越多的业内人士所了解和接受。如何推动建筑业实施绿色施工,促进建筑业可持续发展,建设资源节约型、环境友好型社会,是我们共同面临的课题。我国尚处于经济快速发展阶段,对于大量消耗资源、影响环境的建筑业,应依据因地制宜原则,贯彻执行国家、行业和地方相关技术经济政策,全面实施绿色施工,承担起可持续发展的社会责任。

参考文献:

[1]建设部.绿色施工导则(建质〔2007〕223 号)[Z].

[2]绿色施工管理规程(DB11_513-2008)[S].

[3]郁超.施工组织设计中绿色施工技术措施的编制[J].建筑技术,2009(21):124-127.

篇4

关键词:建筑施工;质量管理;绿色建筑

中图分类号:TU198文献标识码: A

现代建筑工程基本属于规模较大,涉及专业较多的工程项目,因此为了确保所有的施工专业都能够合理及时的进行施工作业,从而在预定的期限内完成高质量的建筑工程施工,我们务必要采取必要的建筑施工管理措施,通过有效的管理来保证施工的进度与质量。随着绿色建筑概念的提出与不断应用,绿色建筑施工管理的方法与内容也越来越受到人们的关注。本文主要针对建筑施工进度管理、质量管理、绿色管理三方面来进行论述分析。

一、 建筑施工管理中重要的环节

(一)施工进度的管理

1、建筑工程的施工进度计划的制定

建筑项目开展初期,需要对建筑工程施工进度制定计划。建筑项目的承包商需要按照建筑合同中规定的工期来进行施工,首先要对现场施工条件进行勘察,明确施工的具体内容,从而制定相应的施工计划。其次,建筑施工的进度计划要保证科学性和合理性,从而在以后的施工中能够顺利的进行。施工进度计划中主要有几方面内容:建筑施工在准备前期的工程确认工作、建筑施工的具体施工项目内容、施工材料的使用和供应、工程的工期和工程的验收等。同时,影响工程施工的外在条件也需要考虑在内,如自然条件和人为等不可预知的条件,这些都对建筑施工有着一定的影响,只有提前做好准备工作,在后期的工作中才能确保施工的顺利进行。

2、实施工程施工进度的计划

工程施工前期的进度计划制定完成后,需要制定对工程施工阶段的施工进度计划。监理部门和相关的施工监督单位要对施工情况进行实时监督,明确具体的施工内容,从而保证施工的质量。施工单位要及时的保持与监理单位进行沟通,把具体施工情况用明确的书面形式报告给监理部门,再确定施工的细节,从施工细节走反映出施工的具体情况,从而提高建筑施工的施工效率。

3、及时发现实际施工中的进度与施工进度计划之间的偏差

建筑施工过程中,施工的进度与施工进度计划通常都会出现一些偏差,因此,建筑施工单位要对施工进度负责,及时的发展其中存在的问题,并且加以调整,以保证建筑施工能够按照原定的施工计划来进行。而建筑施工过程中,很多施工组织由于各种原因会造成延缓施工进度的现象,使建筑施工不能按照原定的施工来进行。而且,我国的建筑工程的规模都相对较大,建筑施工材料或者建筑施工器械都会不断的更新,很多施工人员对于新的建筑材料还不能够在第一时间熟练使用,因此,建筑施工的工期也会因此延误。另外,在工程中,也存在着多加承包商来共同进行的现象,施工过程中每加承包商往往都只顾自己手中的工作,互相之间没有沟通交流,出现问题时很难得以调整,这对建筑工程施工的影响也是巨大的。

二、建筑工程的质量

1、制定建筑工程的施工方案

在建筑工程开始施工之前,就需要对建筑工程的施工进行编制,并对建筑中的关键部位或者是重点部位的施工和新技术、新建筑材料的投入使用,要在建筑施工前一周,要制定出较为详细的施工方案来,上报上去等待审批,以保证建筑工程的施工质量。

2、做好建筑施工的准备工作

要做好建筑施工的准备工作,按照制定的建筑工程的施工方案,来对技术工种进行核定,以保证建筑施工工程的质量,并做好建筑工程的设计图纸的审核和技术交底工作,把建筑工程的施工技术交底分发到各个施工小组中,让他们充分熟悉在建筑施工过程中所要用到的建筑施工技术。对于新出现的建筑施工技术和建筑材料,要及时的做好建筑施工人员的培训,对进入施工现场的机械设备做好养护工作,以保证机械设备以最好的状态投入到建筑工程的施工过程中。

3、重视建筑工程的隐蔽工程施工

针对建筑工程中决定建筑施工质量的最重要的施工项目,要安排专人负责,并且责任到人,建筑工程中所涉及到的隐蔽工程的记录,都需要监理单位的工程师对其进行签字,以保证隐蔽工程的施工质量,在监理工程师认可之后,才可以进行后续工程的施工建设。在建筑工程施工的过程中,除了依据常规的建筑施工的质量标准对其检查外,还需要不间断的对重点部位的建筑施工质量进行重复的检验,防止建筑质量上出现重大的质量问题。

三、 绿色建筑施工管理

绿色建筑设计指的是在建筑物的整个建筑到使用过程中能尽可能的节约资源,如可以节约一些空间、节约水和材料等,要尽量保护环境节约资源减少污染,房屋建筑既适用能满足人们生活需要又要注意给人们提供健康高效的生活环境,这样才是一个和谐绿色的居住环境

1、绿色建筑施工管理的对策

建筑工程的施工过程中涉及到的能源资源种类较多,例如,天然气和液化气等,电能主要是由机械设备的用电和照明用电组成;而机械设备在使用的过程中,为了能够正常的运行,就需要使用汽油或者是柴油。因此要做好建筑施工过程中的能源管理工作,在建筑工程的施工过程中,选择较为优化的施工方式进行施工,并选择工作效率较高的机械设备投入建设,对耗能较大且工作效率低的机械设备淘汰掉不使用,以节省机械设备在正常运转过程中所需要消耗的能源量;对建筑工程施工过程中需要的电能,要保证电路的优化设计,以确保电能传输的正常进行,对供电设备进行定期的检修和养护工作,以保证供电设备的正常运行建筑施工工程建设过程中所涉及到的建筑能源需要安排专人负责管理,以保证建筑能源能够从整体上对其进行统筹规划。

2、水资源的管理

建筑工程的施工过程中,水资源是必不可少的资源之一,要做好建筑施工过程中的水资源管理工作,最大限度降低建筑施工过程中的水资源浪费。在建筑工程的施工中,安装必要的节水型设备,并定期对建筑施工过程中的供水管网检查,防止跑、滴、冒、漏等浪费水资源的现象出现;在建筑工程的施工前期,就需要在建筑施工现场建设几个污水处理池和雨水收集井,这些池子和井中的水在经过处理后,可以用于绿化灌溉以及混凝土的养护,这就可以大大降低建筑工程施工过程中的水资源需求量。

3、建筑材料的管理

建筑材料的花费是建筑施工所需要的最主要花费,一般会占到资金成本投入的50%―60%,因此要做好建筑工程施工过程中的建筑材料的管理,将建筑材料的浪费控制在最小化,从而最大限度的提高建筑工程的经济效益。在对建筑材料挑选的过程中,尽量避免包装较为复杂的建筑材料的使用,甚至是在建筑施工现场设置专门的建筑材料的回收点,对建筑材料进行回收处理;对于进入建筑施工现场的建筑材料,进行分类储藏,防止出现由于外界因素而损伤建筑材料质量的现象出现,对建筑材料的成本严格控制,将建筑材料的成本控制在建筑初期的资金成本分配的范围内,严禁浪费现象的出现。

4 、绿色施工方案需合理确定

绿色的施工方案中需要将绿色施工的重要理念完善的体现出来,需要融合绿色建设项目的主要特征,拟定出适合的施工方案和施工组织设计。建设的主要单位需要给予具体的绿色施工要求和绿色设计概况,并提供资金、工期、环境、场地等保障要素,同时需要合理的安排参见各方所涉及到的不同绿色施工管理工作。设计的主要单位需要按照绿色施工要求,开展深层次的设计和图纸会审工作,要针对施工单位,进行工程设计的整体交底工作,将设计中主要蕴含的思想阐明,还需要融合市政设施、机电设备安装、装修以及土建等不同的专业,让不同专业的施工,以及工程设计方面,能够构成有效的结合体,对施工单位在规划统筹当中提供极大的便利,从而将一体化施工实现。

综上所述,建筑工程施工过程中最重要的组成部分是建筑施工管理,对于建筑工程施工的有序进行有着非常重要的意义。随着绿色环保理念的深入人心,绿色建筑施工管理成为建筑施工管理发展的必然趋势,能够使建筑行业实现可持续发展,能够很大程度的节省建筑材料、水资源等建筑施工过程中所涉及到的能源资源,真正意义上实现建筑施工管理的绿色发展。

参考文献:

[1]孙佩刚.基于绿色施工管理理念下如何创新建筑施工管理[J].中国新技术新产品,2013(02)

[2]黄星晔.关于建筑施工管理及绿色建筑施工管理的几点认识[J].建材发展导向,2012(17)

篇5

关键词:绿色建筑;施工;技术研究

Abstract: In recent years, with the rapid development of China's construction industry, a large number of buildng projects has been put into construction, while the demand for energy of theconstruction industry is a huge, which leads the heavy burden to our country energy supply. So, the green construction is the future development direction our country construction field. Therefore, the government paid attention to green construction in the project, so as to reduce energy consumption, relieve energy tense situation.

Key words: green architecture; construction; technology research

中图分类号:TU745.5文献标识码:A文章编号:

1 施工阶段的绿色施工管理

在建筑业中推行可持续发展战略,施工阶段的绿色施工是应备受重视的一个阶段。在施工策划时就找出本项目环境因素,依据环境因素的影响力评价出重要环境因素,重点对重要环境因素制定控制目标、控制措施及应急准备与响应方案。一般来讲,施工阶段的重要环境因素包括能源管理、水资源管理、材料管理、噪声管理及废弃物管理。

建筑施工过程中施工现场的能源结构包括:煤、天然气、液化气、电、汽油、柴油等等,煤、天然气、液化气主要用于施工现场的食堂做饭、生活取暖和冬季施工时砂石料及混凝土拌和时的水加温。

电主要是满足施工机械的用电和生活照明用电两大类。施工现场各种重型机械则是以汽油或柴油为主要能源。从“绿色环保”的角度来看,在进行施工用器具选型时,要优先采用技术成熟、能源消耗相对较低的工艺和设备,要逐步淘汰能耗大的机械及设备。确实做好供电线路的设计及优化,减少设备的无负荷运行时间。对设备进行定期维护、保养,保证设备运行正常,降低能源的消耗。根据不同的施工区域,采用不同的能源,最好是采用清洁能源。

施工工地的水源,几乎都存在不同程度的跑、冒、滴、漏现象。安装节水型小流量的设备和器具,减少施工期间的用水量。对供水管网定期检查、维护、保养,减少乃至杜绝跑、冒、滴、漏现象。

一般性的建筑工程,原材料的消耗约占土建成本的50%~60%,因此对建筑施工过程中的材料进行有序管理,有助于减少对环境的污染,减少浪费,提高工程效益。根据工程特点,选用带有较少包装材料的产品,并应注重回收和重复利用包装材料。在施工现场建立废弃物的回收系统,对废弃物进行分类收集、贮存、利用。

2 组织管理角度的绿色施工技术研究绿色施工管理主要包括组织管理、规划管理、实施管理、评价管理和人员安全与健康管理五个方面

2.1组织管理建立绿色施工管理体系,并制定相应的管理制度与目标。项目经理为绿色施工第一责任人,负责绿色施工的组织实施及目标实现,并指定绿色施工管理人员和监督人员。

2.2规划管理编制绿色施工方案。该方案应在施工组织设计中独立成章,并按有关规定进行审批。绿色施工方案应包括以下内容。(1)环境保护措施,制定环境管理计划及应急救援预案,采取有效措施,降低环境负荷,保护地下设施和文物等资源。(2)节材措施,在保证工程安全与质量的前提下,制定节材措施。如进行施工方案的节材优化,建筑垃圾减量化,尽量利用可循环材料等。(3)节水措施,根据工程所在地的水资源状况,制定节水措施。(4)节能措施,进行施工节能策划,确定目标,制定节能措施。(5)节地与施工用地保护措施,制定临时用地指标、施工总平面布置规划及临时用地节地措施等。

2.3实施管理(1)绿色施工应对整个施工过程实施动态管理,加强对施工策划、施工准备、材料采购、现场施工、工程验收等的管理和监督。(2)应结合工程项目的特点,有针对性地对绿色施工作相应的宣传,通过宣传营造绿色施工的氛围。(3)定期对职工进行绿色施工知识培训,增强职工绿色施工意识。

2.4评价管理(1)对照导则的指标体系,结合工程特点,对绿色施工的效果及采用的新技术、新设备、新材料与新工艺,进行自评估。(2)成立专家评估小组,对绿色施工方案、实施过程至项目竣工,进行综合评估。

2.5人员安全与健康管理(1)制订施工防尘、防毒、防辐射等职业危害的措施,保障施工人员长期职业健康。(2)合理布置施工场地,保护生活及办公区不受施工活动的有害影响。施工现场建立卫生急救、保健防疫制度,在安全事故和疾病疫情出现时提供及时救助。(3)提供卫生、健康的工作与生活环境,加强对施工人员的住宿、膳食、饮用水等生活与环境卫生管理,改善施工人员的生活条件。

3 绿色施工从环境保护方面的研究

篇6

关键词:建筑施工;技术革新;环保

中图分类号: X324 文献标识码: A

近几年人们对建筑环境的重视程度在不断的增加,以“以人为本”为原则的绿色施工体现的是当代的建筑施工的进步。而建筑工人是建筑施工中的重要的组成成分。在为社会和城市提供有优美居住环境的同时,必须要考虑到自己的人身安全。施工人员必须对施工的环境有一个清晰的认识,这样能保证自己的生命财产安全。现代化的建筑施工对建筑物的施工环境、施工技术等提出了相当高的要求。我国的大中城市都在不断的进行施工方案和实施的改革。这一系列的措施能提升建筑施工的技术水平。

1.建筑环保施工的措施

绿色建筑施工是在保证质量好全等基本的条件下,采用科学管理的方法和技术。最大限度的实施节约资源和减少对环境造成的压力和负面影响。能节省能源、电水用量等。场地的感染是建筑施工中存在的主要的问题。降低感染能提高资源的利用率。提高工程的质量。

1.1在临时设施建设方面。

临时的施工设施必须是在相关的单位审批之后,严格的按照有关的搭建房屋的要求进行。采用各种的保温隔热、可拆除的材料搭建。尽量的保证临时施工的搭建更加更加的绿色环保。在取得合格的证明之后投入使用。

1.2在施工降水方面。

施工中的降水问题使得很多的单位都十分的头疼,阻断地下水进入施工的区域。这就需要我们队施工的场地的低下结构、岩石的情况、施工的技术和条件等方面进行考虑。降低施工过程中的降水成本。合适的可以采用管井和水井来实施合理的回灌,防止地下水对施工的影响。

1.3在控制施工扬尘方面。

《绿色施工规程》中对施工中的开挖土方等情况进行了严格的规定。施工前必须熟悉改规程。在施工中做好洗车池和冲洗设施、建筑垃圾和生活垃圾分类密闭存放装置、沙土覆盖、工地路面硬化和生活区绿化美化等工作。

1.4在渣土绿色运输方面。

渣土的运输涉及到许可证的问题。企业必须解决渣土车“渣土消纳许可证”的难题。这样才能保证企业的运输车队能顺利的进行作业。

1.5在降低声、光排放方面。

施工方案中必须考虑到周围的市民、公司、企业的正常的工作时间,不能产生太大的噪音和光。这样会干扰到别人的工作和学习。所以企业必须合理的安排施工的时间和流程。尽量的在别人空闲时间进行,这就要求必须到工程所在地区县建委办理夜间施工许可证,施工时要采取封闭措施降低施工噪声,并尽可能减少强光对居民生活的干扰。

2.绿色建筑的节能与施工技术革新

2.1建筑施工技术的中建筑墙体的改革也很重要在建筑施工过程中,

建筑的墙体消耗的资源,是建筑建设中技术改革的重要的一个环节。企业既要保证节能减排又能实现技术的突破。建筑墙体主要应该用的原材料必须是绿色的、环保的、在生产技术上主要应用的是最低能源消耗的制作工艺等,来保证材料的应用对环境的绝对环保。

2.2绿色建筑的节能与环境现代建筑是一种过分依赖有限能源的建筑。

现代化的建筑对能源的需求量非常的大,各种的照明、空调等设备都需要很大的能源消耗量。能源的紧张是建筑中面临的问题。也是造成环境污染和破坏的主要的因素。据权威的机构认定全球的能量的一半都是消耗在建筑物的制造和使用的过程中。绿色建筑的主要理念就是改变原有的传统的设计观点和理念。对各种的绿色资源的使用。降低不可再生能源的使用。使建筑物的整体的能耗向低能耗方向发展。企业依靠节能技术不断的提高资源的利用效率。使建筑工程逐步摆脱对传统能源的过分依赖,实现一定程度上能源使用的自给自足。

2.3绿色建筑设计必须深入到整个建筑生命周期中考察、评估建筑工程施工能耗状况及其对环境的影响,建立全面能源观。对建筑的能耗不仅要注重研制、保温材料的优化、建筑热环境性能的提高。

可以将高效的热发射材料应用在建筑物的内表面和外层结构的空气层中。这样可以保证建筑物可以将大部分的红外线等射线发射掉。从而确保了建筑物的隔热和保温的效果。借鉴美国的做法是开展大规模的使用反射膜。这种方法主要是为了节能。其他的技能的方式例如高效的节能玻璃、新型的硅胶墙体等。这些材料都是新型的材料。应用在建筑物上能更好的实现节能减排、绿色环保的目的。

设备的创新和发明和材料的应用是一样的。再生能源的收集设备能储存热量和进行热回收。充分的利用了太阳能、核能、风能等不同类型的能源。

3.建筑工程绿色施工技术。

施工过程的管理、环境的保护、材料和节能的利用、节水水资源利用、节能和能源的充分利用、施工等构成了绿色施工的总体体系。一下是每一个方面的介绍。

3.1组织管理

组织管理的主要职责就是制定施工的管理体系,对管理的目标和对象进行管理。严格的按照绿色施工标准和指标来进行。

3.2规划管理

绿色建筑方案能更好的指导建筑的施工,改技术方案必须在组织设计中单独的完成。并严格的实行审核批准。绿色建筑施工方案主要有:环境保护措施、有效的应急预案、环境管理计划等。在降低环境的负荷和压力的同时保护各种的低下文物和资源。在保证工程安全和质量的前提下,制定必要的节能措施和方法。例如进行施工方案的节材优化,建筑垃圾减量化,尽量利用可循环材料等;节水措施,根据工程所在地的水资源状况,制定节水措施;节能措施,进行施工节能策划,确定目标,制定节能措施;节地与施工用地保护措施,制定临时用地指标、施工总平面布置规划及临时用地节地措施等。

3.3实施管理

绿色施工要求的是整个工程过程中的动态化管理,包括对施工的策划、材料的采购、现场施工的管理、最后的验收等环节。结合工程的实际情况针对性的宣传和培训。通过建设绿色施工环境,保证施工中的绿色环保。增强人们的绿色施工意识。

3.4评价管理

对绿色工程的管理应该是在指标体系并结合工程的特点利用绿色施工的各种的新技术、新工艺、新材料等。进行工程指标的测评和估计。成立专门的评估小组,对绿色施工方案、实施过程至项目竣工,进行综合评估。

3.5人员安全与健康管理

有毒、灰尘多、辐射的施工环境严重的影响着施工人员的健康,我们应该想方法消除这些不良的因素。保障施工人员的能长期的作业。不受施工环境的限制和约束。合理布置施工场地,保护生活及办公区不受施工活动的有害影响。施工现场建立卫生急救、保健防疫制度,在安全事故和疾病疫情出现时提供及时救助;施工现场的卫生状况必须符合国家对相关的施工现场的卫生的指标。用水、饮食等都严格的控制。这样能改善人们的生活条件。

4.结束语

我国现代建筑行业中,环保与节能问题已经成为阻碍其发展的重要因素,而建筑工程施工新技术的应用是解决其高污染、高能耗问题的主要措施。在以往的建筑工程施工技术创新与应用中,通常是将经济收益放在首要位置,而忽略了行业所应重视的社会效益问题,这是导致我国工程施工技术体系始终难以完善的主要矛盾。建筑工程施工技术的创新应用中,一定要注重对于相关环保与节能技术的研究,在保证施工进度、质量与安全的基础上,进一步降低施工中的环境污染与能源消耗,促进我国建筑行业的“绿色”发展应结合当前我国的经济实力和社会总体发展水平。尽快确定一个宏伟的目标以及架构起一套可行的制度框架,从而使我们这一代的即时利益与整个人类的长远利益结合起来,将一个地区的局部利益与整个世界的整体利益结合起来,公正合理地与他人分享我们这个地球上有限的资源,同时,最大限度地杜绝资源浪费和环境污染。

参考文献:

[1]舒雷峰、戴建明.建筑施工技术改进三则[J].建筑工人,2008.07

篇7

关键词:绿色建筑施工;概念;现实意义;实施方法

1.绿色建筑施工技术的概念

绿色施工技术概括起来就是“资源有效利用”,即一是减少建筑材料、各种资源和不可再生能源的使用;二是利用可再生能源和材料;三是设置废物回收系统,利用回收材料;四是在结构允许的条件下重新使用旧材料;五是减少污染物的排放,最大限度地减少对周围环境的影响。推进“绿色施工”的目的是为人类提供舒适、健康、安全的居住、工作和活动空间。“绿色施工”要求在建筑的全生命周期内实现高效率地利用能源和资源(土地、水、材料)和最低限度地影响环境。“建筑施工”是建筑产品生产过程中的重要环节,是建筑企业组织按照设计文件的要求,使用一定的机具和物料,通过一定的工艺过程将图纸上的“建筑”进行实现的生产过程。“绿色施工”实质上是以保持生态环境和节约资源为目标,对工程项目施工采用的技术和管理方案进行优化,并严格实施,确保施工过程安全和高效、产品质量严格受控的方式方法。

2.发展绿色施工技术的现实意义

2.1绿色施工有利于当前建筑业的可持续发展。绿色施工是对传统施工技术的重新审视,是可持续发展思想在工程建设施工中的应用与体现,是绿色施工技术的综合应用,施工企业应不断学习和创新绿色施工技术,将其作为提升自身竞争力的重要手段,从而促进建筑业健康持续的发展。

2.2绿色施工有利于实现现代建筑施工模式的转型。绿色施工包括资源与能源利用、社会与经济发展、生态与环境保护等多种内容,真正的绿色施工应当是将绿色模式作为一个整体概念运用到施工实践中去,针对施工过程进行科学的绿色方案设计,实现建筑施工模式的转型。

2.3绿色施工有利于提高建筑工程的综合效益。工程建筑是促进人类社会发展的重要物质形态,绿色施工能给人们提供舒适的居住环境并降低了工程的施工成本,实现了建筑工程的社会效益,是现代建筑工程实现经济效益、环境效益以及社会效益最佳结合的建筑新理论。

2.4绿色施工有利于创建生态环保型建筑施工环境。传统建筑施工技术往往存在破坏相关土地资源,浪费大量水电资源及建筑材料,造成建筑施工过程中的环境污染等问题,绿色施工技术能有效的改善和解决上述问题。

3.实行绿色建筑施工技术的方法

所谓绿色施工技术主要包括以下六个方面:施工管理、环境保护、节能及能源利用、节材及材料资源的利用、节水及水资源的利用以及节地及施工用地的保护。本文主要针对两个方面进行一下细致的探讨。

3.1从管理的角度出发

在绿色施工管理中主要包括了以下几个方面:组织管理、规划管理、实施管理、人员安全与健康管理以及评价管理。下面选取几方面进行一下简单的介绍:

3.1.1组织管理

(1)根据企业自身状况及在施工程的特点建立切实可行的绿色施工管理体系,制定出相关管理制度及目标,并将目标分解到各个部门。

(2)项目经理作为工程绿色施工的第一负责人,统筹整个工程绿色施工的组织与实施,并安排专门人员进行跟踪管理与监督。

3.1.2规划管理

制定绿色施工专项方案,并经有关部门审批。绿色施工方案要包括以下的内容:

(1)环境的保护措施。提出明确的环境管理计划,制定相应的应急方案,运用有效的措施减低环境的负荷。

(2)节材措施。在确保工程的安全及质量的情况下,制定相关的节约建材的措施。例如对施工方案进行节材优化,充分利用产业废渣(如粉煤灰),尽量使用可循环的材料等等。

(3)节水措施。科学合理的的运用节水技术,实现水资源的高效利用。充分利用非传统水源,比如雨水、中水、地下水等。

(4)节能措施。制定节能计划,采取各种节能措施,比如选用功能优良、能效高的施工机械设备、充分利用太阳能、地热等可再生能源等等。

(5)节地与施工用地保护措施。根据施工生产规模、施工人员数量、材料设备需用计划及现场条件合理规划施工用地。

3.1.3实施管理

实施管理是指绿色施工方案确定之后,在项目的实施管理阶段,对绿色施工方案实施过程进行策划和控制,以达到绿色施工目标,主要包括以下内容:

(1)绿色施工应该对整个工程实施动态的管理,收集各个阶段绿色施工控制的实测数据,定期将实测数据与目标值进行比较,当发现偏离时,及时分析偏离原因、确定纠正措施、采取纠正行动,实现PDCA 循环控制管理,将控制贯穿到施工策划、施工准备、材料采购、现场施工、工程验收等各阶段的管理和监督之中。

(2)结合工程施工项目所具有的特点,广泛开展有针对性的宣传,通过有效的宣传来营造一个绿色施工的氛围。

3.2从环保角度出发

3.2.1对施工扬尘的控制

(1)施工现场采用围墙进行全封闭,围墙必须严密、坚固、规范、美观,高度不低于1.8M。

(2)对施工场地及道路地坪进行硬化,工地出入口设置洗车槽、沉淀池,对驶出工地的车辆进行清洗,洗车后的污水经过沉淀后集中排放,使其有组织的汇入市政排水设施。

(3)运输易飞扬、易散落的物料时,一定要对其进行密封处理,防止运输过程中四处飞散。

(3)装饰装修施工阶段,建筑物内施工垃圾的清运采用搭建临时封闭性专用通道的方式或者是利用容器进行吊运,严禁凌空抛掷。粉尘材料入库保管,沙石料必须覆盖,禁止在道路和人行道上堆放或转运易扬尘的建筑材料。

3.2.2振动与噪声的控制

(1)对施工现场噪声的排放要进行严格的监控,不得超过国家规定的标准,在距离居民区不足200米的工程,在晚上21点至早上6点时间区段内禁止施工。

(2)对现场的噪声进行实时监测,一旦超过国家规定标准,马上采取相应的解决措施。

3.2.3水污染的控制

(1)施工过程中污水排放要控制在国家规定的标准内,针对不同的污水要有相应的排放、处理措施,例如设置化粪池、隔油池以及沉淀池等。

(2)污水的排放应该委托给权威单位进行水质的检测,并且提供相应的检测报告。

(3)保护好地下水环境。采用具有较好隔水性能的边坡支护技术来防止施工污水对地下水的污染。在基坑开挖的抽水量达到50万m?以上的时候,必须进行地下水的回灌,而且在回灌的过程中要确保地下水不被污染。

3.2.4土壤保护

(1)注意对施工地表环境的保护,防止土壤发生侵蚀现象,造成土壤流失。在因施工而造成的裸土区域进行及时的沙石覆盖或者植被的种植,减少土壤的侵蚀;若是因施工而造成了地表的径流土壤流失的现象,要及时的设置地表的排水系统,或者利用植被覆盖、稳定斜坡等措施来减少土壤的流失。

(2)防止化粪池、隔油池以及沉淀池出现堵塞的现象,定时定期的对其进行疏通处理,并委托相关的单位进行清运。

(3)对于施工产生的有毒、有害的废弃物品应进行固定的投放回收,然后通知相关的部门进行回收处理,绝不能与建筑垃圾进行混合外运,避免对土壤以及地下水造成污染。

4.结语

总之,随着现代生活理念的转变,绿色施工意识逐渐成为现代建筑施工发展的主流趋势。绿色施工技术,是当今社会环保理念与可持续发展理念在建筑施工中的实践与应用。新时期,优化技术措施,坚持工程绿色施工技术的创新开发,是推动现代建筑行业更好更快发展的重要途径。

参考文献:

篇8

【关键词】建筑工程,绿色施工,技术探讨

中图分类号:TU198 文献标识码:A 文章编号:

一.前言

随着建筑业的不断发展和建筑施工技术的不断进步,绿色建筑在我国的建设数量在不断增加,绿色建筑施工技术在不断进步。绿色施工是是可持续发展思想在工程施工阶段的应用,对促进建筑业可持续发展具有重要意义。针对我国建筑工程绿色施工技术进行深入的研究和探讨。

二.绿色施工的概念

根据建设部《绿色施工导则》定义:绿色施工是指工程施工过程中,在保证质量、安全等基本要求的前提下,通过科学管理和先进技术,最大限度地节约资源与减少对环境负面影响的施工活动,实现节能、节地、节水、节材和环境保护。

绿色施工是将可持续发展观应用在传统施工上。绿色施工不仅要求质量、安全、进度等达到要求,而且还要从生产的全过程出发,依据可持续发展理念来统筹规划施工全过程,优先使用绿色建材,改进传统施工工艺和施工技术,在按要求完成项目的前提下,尽量减少施工过程中对环境的污染和对材料的消耗。所以,绿色施工比传统施工的要求要严格的多。

三.建筑工程绿色施工技术发展的重要性

目前,我国的建筑行业发展还处于一个相对传统的经济产业链上,传统建筑施工还处于比较主流的地位,但是这种传统建筑施工已经越来越无法满足现代建筑需求。传统建筑工程施工存在很多问题,包括技术问题、工艺问题和污染问题等。因此,近年来,许多施工单位开始利用先进的科学技术手段,推行现代绿色施工理念,制定科学完整的绿色施工方案,并采用先进的绿色施工技术,为建筑行业施工改革发展注入创新与活力。相较于传统建筑施工,绿色施工技术具有以下推广的必要性。首先,降低能源消耗。绿色施工技术的应用会在施工过程中通过节能改造技术降低电能消耗以及热能损失等。其次,绿色建筑施工技术的关键就是节约施工成本,通过绿色施工技术通过对施工成本的控制,在满足施工质量安全要求的基础上,将土地资源、水资源、材料资源等做到最大限度的成本节约。再次,绿色公共技术不仅包括工序调整和技术改良,同时还包括对建筑内外组合的改良与优化,最终将建筑性能优化与改善。

四.建筑工程绿色施工技术

绿色施工总体框架由施工管理、环境保护、节材与材料资源利用、节水与水资源利用、节能与能源利用、节地与施工用地保护六个方面组成。下面主要从前两个方面进行探讨。

1.组织管理角度的绿色施工技术研究

绿色施工管理主要包括组织管理、规划管理、实施管理、评价管理和人员安全与健康管理五个方面:

(一)组织管理 建立绿色施工管理体系,并制定相应的管理制度与目标。项目经理为绿色施工第一责任人,负责绿色施工的组织实施及目标实现,并指定绿色施工管理人员和监督人员。

(二)规划管理

编制绿色施工方案。该方案应在施工组织设计中独立成章,并按有关规定进行审批。绿色施工方案应包括以下内容。

(1)环境保护措施,制定环境管理计划及应急救援预案,采取有效措施,降低环境负荷,保护地下设施和文物等资源。(2)节材措施,在保证工程安全与质量的前提下,制定节材措施。(3)节水措施,根据工程所在地的水资源状况,制定节水措施。(4)节能措施,进行施工节能策划,确定目标,制定节能措施。(5)节地与施工用地保护措施,制定临时用地指标、施工总平面布置规划及临时用地节地措施等。

(三)实施管理

(1)绿色施工应对整个施工过程实施动态管理,加强对施工策划、施工准备、材料采购、现场施工、工程验收等各阶段的管理和监督。(2)应结合工程项目的特点,有针对性地对绿色施工作相应的宣传。通过宣传营造绿色施工的氛围。(3)定期对职工进行绿色施工知识培训,增强职工绿色施工意识。 (四)评价管理 (1)对照导则的指标体系,结合工程特点对绿色施工的效果及采用的新技术、新设备、新材料与新工艺,进行自评估。(2)成立专家评估小组。对绿色施工方案、实施过程至项目竣工,进行综合评估。

2.绿色施工技术在建筑工程中的应用

(一)控制建筑产生的扬尘

建筑施工过程中不可避免的会产生扬尘现象,同时也是污染大气环境的主要来源之一,需要建筑单位采取一定的措施来控制扬尘现象的产生,例如,在运输车辆比较容易出现飞扬、散落、遗漏物料的现象时应该采取车辆封闭的措施进行运输的方法;在施工现场设置洗车槽,来保证所排放的污水不会污染道路,产生道路环境扬尘;在进行土方作业、安装装修、结构施工、拆除临时建筑物时,应该结合实际的环境情况来实现清理扬尘,通过洒水、高压喷雾、设置围栏的方式来防止扬尘。

(二)节约建筑施工用地

在进行建筑之前,首先需要掌握建筑周围的环境的一些情况,对周边环境的基础设施、管线的分布情况等进行全面的了解。保护场地内现在有的地方特色资源和文物古迹。如果需要进行临时用地的设置,应该遵循用地面积最小化的设计理念来进行设计,使建筑平面布局规划紧凑、合理,提高建筑用地的综合利用率。进行铺设施工的现场,应该采取临时道路和永久道路相互结合的方法进行铺设,力求减少道路环境的占地面积。

(三)保护施工场地的土壤环境

为了有效的防止建筑施工造成的土壤流失、土壤侵蚀,需要制定施工突然保护的相关措施。对于施工过程中造成的裸土现象,需要及时的采取种植速生苗种的方法进行保护土壤,保护生态环境;因为施工的原因造成的地表径流土壤流失情况的,应该立即采取措施进行保护,例如,设置地表排水系统,稳定斜坡、植被覆盖等方法来减少土壤的流失;在淀池、隔油池以及化粪池等施工辅助地方,不发生堵塞、渗漏、溢出等现象。及时对各种池内物质进行清洗、清掏,并且委托有资质的单位进行清运;对于那些有毒害作用的废弃物质,应该采取集中统一的回收处理,不能当作普通的建筑垃圾进行填埋处理,避免污染土壤和地下水;施工结束后应该尽可能的恢复施工活动破坏区域,尤其是植被区域,和当地的园林、环保部门或者当地植被研究机构进行合作,将地貌地形恢复成原来的样子,并且将剩下的空地进行科学的绿化,补救施工中造成的植被损害和地貌土壤侵蚀。

(四)控制水环境,防止发生污染

结合施工现场中产生污水的来源,处理等情况,实施与之相互对应的防控措施,将水环境进行防污处理。例如,设置化粪池、隔油池等装置;对排放的水质进行监测,并提供最权威的污水检测报告,在确保污水的排放达到当地的排放标准时,才允许排放。对于有毒的油料和材料的存储地,应该设计密封严密的隔水层,认真做好防泄漏工作。

(五)控制噪声和振动 为了尽可能的减少建筑施工导致的噪声和振动对周围的环境造成的影响,尤其是在闹市区施工时,噪声和振动对周围的居民产生十分不利的影响。所以,在距离居民区域不到200m的地方,应该采取相应的时间段作业,在晚上9点到早上6点不允许进行施工。使用一些低振动、低噪声的施工工具,在施工区域设置一定的隔离地带以及噪声屏障措施,尽最大可能减少噪声传播,例如,在进行电刨、电锯、输送泵等操作工种时,需要先搭设临时的封闭机棚,以此来减少噪声的影响。

五.结束语

实施绿色施工对于促进资源节约型、环境友好型社会的建设具有重要作用。随着现在建筑工程领域的飞速发展,施工技术发生了重大变革,采用绿色施工技术可以有效的减少施工过程中资源的消耗和对环境的破坏,有利于建筑企业提高经济效益,促进建筑工程领域的可持续发展。

参考文献:

[1]叶可明.依靠科技创新 不断提高绿色施工水平[J].施工技术,2011,40(1)

[2]汤民,孙大明,马素贞.绿色建筑运行实效问题与碳减排研究分析[J].施工技术,2012,41(3)

[3] 郝薇薇.建筑工程项目的绿色施工管理探究[J].黑龙江科技信息.2012(04)

[4] 戴国跃.绿色施工是实现绿色建筑的重要保证[J].中国资源综合利用.2012(01)

篇9

BIM虚拟施工技术在建筑工程管理中的应用有助于加强工程全过程管控,从工程设计、施工导后期物业管理实现实时、精准跟踪管控,尤其是规模较大、设计与施工较为复杂的建筑工程项目。

(1)工艺原理

利用BIM软件可建立起建筑工程项目相关信息模型,施工前期可对工程项目设计方案进行检测、分析与模拟优化,结合工程要求与标准制定详细的进度计划与施工方案,并通过施工全过程模拟及时发现施工重难点问题并予以解决,直到获得最佳设计与施工方案,并辅以3DMAX动画对复杂施工环节或工艺进行演示,以更好的指导现场协调施工,减少施工干扰、设计变更、施工返工、人机待料等情况的出现。项目施工中要对虚拟模型进行实时维护,根据设计变更情况、技术核定情况及实际施工情况做出调整,施工结束后要随时重现施工过程作为改进、究责、检查的终压依据,通过多维度的BIM模型在网络环境下对项目的资金支出使用情况、成本管控情况、进度质量控制情况等进行分析回溯,为提升工程项目管控质量提供技术支持。

(2)工艺流程

应用BIM虚拟技术要遵循国家建筑行业相关规范及施工规范编制各类施工合同、图纸及标书文件完成组织虚拟方案的编制工作。建模阶段提供专业技术支持以确保图纸设计表达清晰、专业性无误,利用BIM软件创建模型,结合施工设计图纸、招标文件、合同等资料建立工程土建、钢筋等项目,并完成BIM模型的安装。BIM模型评审通过三维模型展示对模型与设计图纸的符合程度、节点部位是否满足设计要求、现场施工条件是否无误等进行审核,确保支持模型达到预设目标并可真实反映原版设计意图。评审过程中要对模型反映问题进行汇总并提交做三维模型碰撞检查探寻解决对策,及时发现施工中重难点部分,结合设计变更条件对模型进行维护,避免影响施工进度与质量,完成造价成本控制。模型虚拟施工方案编制完成后要结合具体施工情况及进度及时进行补充完善,以充分发挥虚拟技术对建筑工程管理的积极作用。根据施工方案,要在模型上完成数据信息的同步集成,结合方案要求对各构件参数及影响施工属性相联接,由此对整个施工过程进行模拟,从而实现各个阶段、环节、细节部分施工数据的高效集成,推动施工工艺控制效果的提升,结合细致准确的设计规划指导现场施工。在模型中要及时输入各项施工成本控制指标并设置相应的预警提示,以便为施工成本管控提供强有力支持,完成集约化管理、精细化管理模式的推广实施,配合虚拟模型施工方案中各个关键时间节点的要求,输入相应工期及进度配合视觉化动态模式显示以便更加准确的指导现场施工工作。建筑工程项目管理中应用BIM虚拟技术要在整个工程的生命周期内加强对施工情况的督导,以形成高效、强势的管理平台为建筑工程管理服务。

2工程管理中BIM虚拟施工技术应用分析

建筑工程管理中应用BIM虚拟施工技术有助于加强对现场管理工作的监督与了解,公司管理层应用虚拟施工技术可随时查询、跟踪现场施工进度,结合施工情况可随时准确下达管理指令,提升了沟通效率、降低了沟通成本,有利于建筑企业集约化管理模式的推行与实践,是提升施工管理水平与效率,可极大的降低建筑工程成本造价,提升企业施工效益。目前建筑行业施工项目逐步趋于复杂化的情况下,因设计变更、施工返工等原因造成的施工成本造价增加比比皆是,不仅影响了工程进度、质量与安全,对承包方、施工方而言也造成了极大的经济损失,根据行业统计数据,仅2014年建筑行业总承包工程中因设计变更施工与返工施工造成的成本增加比例在10%-20%左右,管理团队管理成本增加在10%-30%左右,极大的影响了施工单位效益目标的实现。鉴于此,应用BIM虚拟施工技术模型可以更加直观、详尽的方式展现工程空间信息,在正式施工前即可对工程设计、竣工、验收情况进行评判,极大了的减少了设计变更与施工返工等情况的发生,也一定程度上节约了管理成本。利用BIM模型进行虚拟碰撞检验有助于提前发现设计问题,并可通过虚拟仿真技术进行预应力钢筋排布模拟等诸多试验,从而减少后期返工,避免延误工期、施工成本增加。建筑工程未开始施工前应用BIM虚拟施工技术可对整个施工过程进行模拟,对工程中每个管道、构件的位置进行精确定位,确保实现工程施工的精细化管理;BIM虚拟施工技术通过与4D数据库的关联可更加精确、快速的获得各类工程基础数据并拆分实物量,可为采购计划的制定与调整提供给确切数据支撑,为项目限额领料提供帮助与支持,有助于加强施工项目成本管控、进度管控与质量管控等。传统施工中通常难以确切统计出项目支出费用、合同应支付款项、甲方已支付款项等杂且乱的施工费用,无法结合施工进度与施工要求临时快速变更施工图纸及获取准确合同工程量及工程造价,BIM虚拟技术配合4D关联数据库可更加快速、精确的确定相关三维图形区域并完成框图出价,实现过程三算对比、产值核算及进度控制等,为施工提供有效指导依据。BIM虚拟施工技术在工程管理中应用可对设计模型方案进行优化,准确捕捉施工重难点,借助3DMAX动画渲染展现施工工艺流程并进行可视化交底,通过展现虚拟施工现象使得复杂的空间设计与标准变得更为准确直观,方便施工管理人员及作业人员的理解与运用,有效解决了因施工理解不同造成的施工操作失误。利用BIM虚拟施工技术可将整个工程建设过程及材料使用情况记录在案,可随时重现整个施工过程并作为工程改进、检查、责任追溯的重要依据,有助于加强施工管理。利用虚拟仿真技术优化施工设计方案可推动绿色施工理念与绿色施工技术的应用实践,尤其是建筑工程中大型设备的安装与吊装,利用3D模型可更加直观的再现设备吊装的动态过程,可有效避免实际吊装中出现碰撞事故,在出现吊装意外时系统可及时自动告警,确保吊装圆满,并减少现场设备吊装意外的发生。比如通过鲁班iBan移动应用可实现现场施工画面的实时拍摄与上传,与BIM虚拟模型进行位置对应,实时反应各方施工参数并展现了控制计算机中,从而将现场的施工管理、质量控制、进度控制、安全控制施工情况与虚拟模型相关联,极大的提升建筑工程管理效率。

3结束语

篇10

关键字:绿色施工,建筑工程,施工,管理

中图分类号: TU761 文献标识码: A 文章编号:

1 绿色施工技术的概念及现状

1.1绿色施工的概念

绿色施工,是基于现代环境保护理念以及资源效益相结合基础上,关于建筑工程开发实施的一种现代环保型的施工技术理论。所谓绿色施工技术是指在建筑施工过程中通过运用科学的管理措施和先进的技术手段,以资源的高效利用为核心,以环保优先为原则,尽可能的减少建筑施工对环境造成的负面影响,追求高效、低耗、环保,统筹兼顾,最大限度地实现工程质量安全、水电能源、建筑材料等资源的节约,它涉及到减少物质化生产、再生资源的循环利用、清洁生产、环境保护等可持续发展的多个方面。

1.2绿色施工的现状

1.2.1 认识不足

绿色施工意识的加强与整个环保意识的加强是相辅相成的过程。当前 ,包括政策的制定者、 业主、设计者、 施工人员及公众在内 ,人们对环保的认识仍然普遍不够 ,公众环保意识水平仍有待提高。

1.2.2经济原因

当前承包商采用绿色施工技术或施工方法 ,经济效果并不明显。很多情况下 ,由于绿色施工被局限在封闭施工、 减少噪音扰民、 减少环境污染、 清洁运输等目的 ,通常要求增加一定的设施或人员投入 ,或需要调整施工作业时间 ,因此会带来成本的增加。而一些节水节电措施如果没有系统长期的采用 ,则由于其节约的费用可能低于其投入而得不到应用。

1.2.3制度措施原因

当前我国建设行政管理部门对施工现场的管理主要体现在对文明施工的管理 ,对于绿色施工还没有系统科学的制度来予以促进、 评价及管理;缺乏必要的评价体系 ,不能以确定的标准来衡量企业的绿色施工水平。

1.2.4 企业管理水平低、成本较高

目前我国建筑施工企业普遍存在人员素质不高 ,企业管理水平低下的现象 ,企业采用绿色施工技术随意性、依赖性强 ,而制度化、规范化差 ,无法采用科学的管理方法和手段,导致成本上升,绿色施工经济性效果更差 ,形成恶性循环。

2绿色施工技术在建筑工程施工中的应用

随着建筑工程领域的发展,传统的施工模式已不能适应科学发展观的要求,因此,以资源的高效利用为核心,以环保优先为原则,追求高效、低耗、环保,统筹兼顾的绿色施工技术成为施工技术发展的必然趋势,成为施工企业可持续发展的必然选择。

主要在节约资源.环境保护等几方面对建筑工程施工提出绿色施工技术的应用:

2.1 节材技术及措施

控制建筑垃圾并又寸产生的碎砖、落地灰等分类清理,并同粉煤灰按一定比例混合后作为地基填埋或路基使用;采用损耗少、周转次数多的模板、脚手架.搭拆有方案及措施,并由搭拆一体化、专业化队伍统一施工等措施。

2.2节能技术及措施

施工现场施行生产、生活、办公、设备用电分区、分块、分类分别计量;合理制订施工工艺和工序,采用节能设备,充分利用机具资源,严格执行绿色施工组织方案中材料采购贮存、堆放回收循环利用等方面的规定,提高能源利用率。

2.3节水技术及措施

施工采用生活、生产用水分别计量,生活用水按时段管理,并采用节水型生活用水器具;在施工出入口车辆清洗处设置简易沉淀池、过滤池、贮存池,收集雨水及洗车废水重复使用等措施。

2.4节地技术及措施

生活、办公等临时设施布置紧凑合理、自然,不破坏周边的环境,尽量减少占地面积;施工区域只能在建筑场地周边的区域进行(受周边条件限制),最大限度地减少临时占地等措施。

2.5环保措施

依照相关环保法律法规,建筑工程施工时施工场地门口设置洗车槽、施工场地设立隔声的临时围墙、现场对废弃的油料和化学溶剂等用塑料收集桶集中收集和处理、基础开挖的回填剩余泥土全部作为绿化底土使用等相应环保措施,严格控制扬尘、噪声、光污染、水土污染、固体废弃物等的影响。

3基于绿色施工的建筑工程管理

绿色施工管理主要包括组织管理、规划管理、实施管理与评价管理四个方面:

3.1 组织管理

建立绿色施工管理体系,并制定相应的管理制度与目标;项目经理为绿色施工第一责任人,负责绿色施工的组织实施及目标实现,并指定绿色施工管理人员和监督人员。

3.2 规划管理

编制绿色施工方案。该方案应在施工组织设计中独立成章,并按有关规定进行审批。

3.3 实施管理

绿色施工应对整个施工过程实施动态管理,应结合工程项目的特点,有针对性地对绿色施工作相应的宣传。通过宣传营造绿色施工的氛围;定期对职工进行绿色施工知识培训,增强职工绿色施工意识。

3.4 评价管理

对照导则的指标体系,结合工程特点对绿色施工的效果及采用的新技术、新设备、新材料与新工艺,进行自评估;成立专家评估小组。对绿色施工方案、实施过程至项目竣工,进行综合评估。

4 结束语

总之,绿色施工技术涉及到与可持续发展密切相关的生态与环境保护、 资源与能源利用、社会与经济发展问题 ,提高人们的绿色施工意识、 解决经济、 建立和完善法规制度体系和评价体系 ,是促进绿色施工的必要措施。随着可持续发展战略的进一步实施 ,实施绿色施工必将成为社会的必然选择。

参考文献

[1] 竹隰生 ,任宏.可持续发展与绿色施工[J] .基建优化 ,2002 , (4) :33 - 35.

[2] 竹隰生,王冰松. 我国绿色施工的实施现状及推广对策[J].重庆建筑大学学报,2005,