实施高标准农田建设范文
时间:2023-08-30 17:08:03
导语:如何才能写好一篇实施高标准农田建设,这就需要搜集整理更多的资料和文献,欢迎阅读由公务员之家整理的十篇范文,供你借鉴。
篇1
关键词:高标准农田;建设;成效;蚌埠市
中图分类号 S28 文献标识码 A 文章编号 1007-7731(2016)22-0115-02
蚌埠市高标准农田建设进展顺利,成效显著。经过高标准农田建设的项目区土地平整度大大提高,田间道路通行能力明显增强,田间排灌配套渠系基本建立,农田抗灾减灾能力增强,农田机械耕作条件大幅度改善,为提高劳动生产率、发展规模化经营奠定了良好的基础条件。
1 高标准农田建设综合成效
1.1 耕地数量增加质量提升,提高粮食安全保障能力 蚌埠市五年来共完成93个高标准农田项目,建设规模118 320hm2,平均耕地质量等级提升0.87,新增耕地
1 100hm2,此外,通过大力开展高标项目区空心村复垦2.2hm2,改建、新建中心村居民点9 527hm2,促进高标准农田集中连片布局,项目区新增粮食产能15 099万kg,蚌埠市粮食连续五年丰产,高标准农田建设为保障国家粮食安全,实现藏粮于地的战略目标奠定了坚实基础。
1.2 改善农业生产条件,促进现代农业的发展 一是配套完善了农田基础设施。蚌埠市按照《高标准农田建设通则》要求,通过高标准农田项目建设,新建和改建农田排灌、田间道路、农田防护和生态环境保持工程,不但大大提高农田基础设施保障能力,而且规范了基础设施占地,提高节约用地水平,蚌埠市高标准农田的基础设施占地率平均为6.4%,低于国家规定的8%。二是改善了农田机械作业条件。蚌埠市高标准农田建设共新修或改建田间道2 218km2,硬化田间道1 306km,新建、改建生产路1372km,使项目区道路通达率达到100%,极大改善了农业机械化交通条件;新增机耕机收面积10.7万hm2,占全部建成高标准农田的90%。三是改善了农田灌排条件。蚌埠市5年来通过高标准农田建设共新增和改善农田防涝面积10.5万hm2,占建成总量的88%;新增和改善节水灌溉面积8.1万hm2,占建成总量的68%。新建、改建各级灌、排(渠)管道、排水沟、灌溉两用渠道4 310km,新建、改建农用桥6 235座,新建、改建机井6 149眼,新建、改建涵洞、渡槽、倒虹吸12 246座,新建、改建各类水闸3 038座,新建、改建泵站200座,新建输电配线42.59km。四是提升农田防护能力。蚌埠市93个项目区共建造防护林134.20万株,新增农田防护面积11.8万hm2,防治水土流失面积5.9万hm2。不仅在防御自然灾害、防风固沙、保水固土、涵养水分、净化大气、减少污染等方面发挥重要作用,还维护了农业生态系统的稳定,优化了农田景观,为项目区生态环境保护提供了保障。五是推动现代农业发展。蚌埠市通过高标准农田的建设,有效推动机械化耕作和适度规模经营,搭建现代农业发展平台,培育和l展了20个新型农业经济体,同时流转土地7 873万hm2(通过问卷调查涉及项目区),其中农业企业和种粮大户流转土地5 927万hm2。如2014年度固镇县连城镇良种场高标农田项目,通过土地整治完善了项目区的排水灌溉工程,建成四通八达的田间道路,部分企业和个人对整治后的土地非常满意,先后流转土地近66.7hm2,建起了特色葡萄园和绿色有机蔬菜大棚,产品远销南京等地。
1.3 增加农民收入,提升农民生活水平和满意度 在增加农民收入方面:通过高标准农田项目实施,一方面改善了农业生产条件,降低了农业生产成本,直接增加农民收入;另一方面通过改善农业生产条件,促进土地流转和规模化经营,推动当地农业产业结构优化调整,扩大了农民增收的途径,解放了大批劳动力进城务工。蚌埠市5年来高标准农田项目区受益人口达866 830人,通过怀远县、固镇县调查问卷统计:蚌埠市农民新增土地租金0.91万元,参与高标准农田项目施工劳务收入3 504.73万元,土地流转后剩余劳力进城务工增加收入75 475.65万元。
在提升农民满意度方面:蚌埠市积极探索建立农民广泛参与的高标准农田实施机制,引导农民积极参与项目选址、规划设计方案论证、工程质量监督、项目验收及建后管护利用等工作,把农民意愿真正落到实处,提高农民对高标准农田项目的满意度。蚌埠市在怀远县、固镇县开展了高标准农田建设调查问卷活动,通过6 299份调查问卷数据统计:农民对工程建设质量情况满意度为97.03%,对村集体经济组织推进土地整治项目满意度98.44%,农民生活便利程度提高值93.76%,农民总体满意度达97.40%。蚌埠市高标准农田建设项目获得了项目区干部、群众的高度肯定。
2 主要措施
2.1 建立健全高标准农田建设5项制度 一是建立目标考核制度。将高标准农田建设工作内容纳入各县区政府年度耕地保护责任目标考核。二是建立工作例会制度。三是建立高标准农田项目巡查制度。开展高标准农田项目动态巡查,并制定了《土地整治建设项目巡查制度》、《土地整治建设项目巡查计划》。四是建立重点督办制度。对重点项目或进度异常的项目及时开展联合专项督办。五是建立信息报备制度。为更好的完成高标准农田项目在线监测监管工作,建立了信息报备平台,定于每季度第3个月的25日,集中开展高标准农田项目信息报备和维护工作。
2.2 建立市级土地整治专家库 规范了高标准农田项目的评审和验收工作,面向社会广泛征集农、水、林、财、交通、审计、工程等行业专家,建立土地整治评审验收专家信息库。
2.3 通过购买社会服务规范高标准农田建设工作 一是公开招标确定项目财务决算审计单位,对项目开展事前、事中、事后审计,将审计工作贯穿项目建设始终,有效提高资金使用的规范性和合理性。二是通过招标确定复测单位,开展了高标准农田项目竣工验收复测工作,复测合格的项目再组织市级验收。三是对高标农田项目建设中的部分单体工程开展第三方质量检测,针对大型农桥(单跨6m以上)及田间道路(砼),要求必须提供第三方质量检测报告,有效认定高标项目单体建设质量,为验收工作提供更多的技术支撑。
2.4 率先开展高标准农田项目信息大数据建设 在项目申报、验收等方面坚持“以图管地”,充分利用收集的项目信息和数据,运用现代科技手段,实现高标准农田项目在一张图上的分层管理和即时跟踪,形成高标准农田项目信息大数据,满足多类别多层次管理需要。
3 建议
(1)高标准农田建设要坚持与土地流转和农业规模化经营相结合。支持新型农业经营主体发展现代农业;要与精准扶贫相结合,支持贫困村脱贫致富;要与美丽乡村建设相结合,注重发展高标准生态农田建设,美化农村生产生活条件。
(2)高标准农田项目要实行综合整治。根据本区域自然资源特点、经济社会发展水平、土地利用状况等因素,差别化推动高标准农田建设,对田、水、路、林、村进行综合整治。注重“雪中送炭”,不忘“锦上添花”,鼓励开展高标准生态农田建设,实现高标准农田数量稳定、质量提升、景观优化,生态良好。
(3)高标准农田建设要坚持农民主体地位。充分尊重农民意愿,维护土地权利人合法权益,依法保障农民的知情权、参与权和受益权,引导农民采取多种方式参与项目建设。
参考文献
[1]赵凡.土地整理关键技术集成与应用[J].科技成果管理与研究,2012(7).
[2]吴海洋.“十二五”时期中国土地整治工作思考[J].中国土地科学,2013(3).
[3]王洪波,程峰,张中帆.中国耕地等别分异特性及其对耕地保护的影响[J].农业工程学报,2011(11).
[4]夏方舟,严金明,刘建生.农村居民点重构治理路径模式的研究[J].农业工程学报,2014(3).
[5]燕超凡,塔金璐,高思培.高标准基本农田建设及后期管理分析[J].江苏科技信息,2015(32).
篇2
关键词高标准农田;建设;综合效益;辽宁东港;椅圈镇
中图分类号S28文献标识码A文章编号 1007-5739(2011)11-0245-01
东港市地处辽东半岛东端,南临黄海,东依鸭绿江,隔江隔海与朝鲜半岛相望,土地总面积24.47万hm2,耕地9.07 万hm2。拥有水田总面积5.33万hm2。2008年粮食总产量47.37万t,是全国800个产粮大县之一。东港市作为国家和辽宁省重点产粮大县,粮食产量徘徊不前,主要表现在以下几个方面[1-2]:粮食成本呈逐步上升的趋势,而粮食价格涨幅低于成本增幅,种粮比较效益长期偏低,影响未来粮食增产潜力发挥;农业基础设施依然薄弱,中低产田比重高,抗灾能力弱;粮食单产不稳定,年际间波动大;灌排设施老化失修、工程不配套,水资源利用率不高,抗御自然灾害的能力差。项目区属老水田区,地方投资有限,与农业生产建设所需资金相比差距甚大,致使农田灌排能力较弱,农业基础设施建设落后,农业发展后劲不足。因此,通过加大投入,改善农业生产条件,实现粮食增产目标是当前的首要任务。
1项目区实施内容
东港市高标准农田建设项目从2008年开始实施,现已完成三期工程,主要针对中低产水田进行改造,采取渠道衬砌等节水措施,配套田间建筑物,产生了明显的经济效益、社会效益和生态效益,促进了当地经济发展和农民增收。2009年高标准农田建设示范工程项目包括椅圈镇1个乡镇,涉及于家村、康家村等9个行政村。高标准农田建设示范工程项目计划建设高标准农田1 333.33 hm2,计划兴建田间配套桥、涵、闸等建筑物549座(其中分水斗门26座,渡槽2座,分水农门248座,路涵265座,渠涵8座),灌溉渠道衬砌80.865 km(其中支、斗渠现浇砼衬砌25.165 km,农渠预制砼U型槽衬砌55.7 km),疏浚渠沟65 km。通过综合改造后,达到水、土、田、林、路综合治理,加强中低产田改造,集中力量打造高标准农田,真正做到“田地平整肥沃、水利设施配套、田间道路畅通、林网建设适宜、科技先进适用、优质高产高效”的示范效应[3-4]。
2项目实施的可行性
在项目区内开展高标准农田建设示范工程,是稳步提高农业综合生产能力、保障国家粮食长久安全的物质基础,有利于解除制约该区农业生产的关键障碍因素,有利于稳步提高粮食综合生产能力;有利于调整产业结构,促进农业增产、农民增收和农村发展,可充分调动农民种粮积极性,确保国家粮食生产安全。
项目区土壤肥沃,水质清澈,水源充沛,宜发展水稻生产和蔬菜种植及水产养殖业,发展高效农业、设施农业、绿色农业、生态农业、订单农业、观光农业前景较好;发展绿色无公害水稻栽植,发展稻田养蟹、虾、鱼等,农民积极性普遍较高。因此,通过建设高标准农田,积极推进农业产业结构调整,大力培育主导产业,发挥农业综合开发项目在农业产业结构调整中的导向性、示范性和带动性作用,可以取得“建一点、带一片、成一线、富一方”的效应,把项目区建设成为增加粮食产量的支柱、标准化生产的楷模、现代农业建设的亮点。
3项目区节水措施
项目区节水措施主要是对现有斗、农渠进行硬化防渗;在农渠进口增设分水斗农门,在斗渠分水口处设置量水设施。渠道衬砌方案的确定:项目区水稻生产供水损失较大的环节是输配水过程中的渗漏损失。渠道的渗漏损失是渠系水利用系数不高的决定性因素。为解决这一问题,拟采用衬砌防渗技术对渠道进行防渗处理。采用衬砌防渗技术,可以大大减少渠道渗漏损失,提高渠系水利用率。同时,还可提高渠道的抗冲能力;减小渠道糙率,增加流速,加大输水能力。初步选择2个方案,即浆砌石防渗方案和混凝土防渗方案,现将各方案优缺点比较如下。
3.1浆砌石防渗
结构形式:500 mm厚浆砌石护坡、护底。优点:抗冲流速较大,浆砌石抗冲流速可达3.0~6.0 m/s;抗冻和防冻害能力较强。由于浆砌石衬砌厚度大,大于冻深,采用浆砌石衬砌等于基础采取了部分置换,且加大了抗力,从而减轻了冻害;具有较强的稳定渠道作用,浆砌石属刚性材料,本身即具有固渠和稳定渠道的作用。缺点:不易采用机械化施工,需要劳动力较多,施工质量较难控制;厚度大,方量多,劳动强度大,造价比较高。工程造价约为86元/m2。
3.2混凝土防渗
结构形式:面层为80 mm厚混凝土,下设400 mm厚砂石垫层。优点:混凝土衬砌强度高,耐久性好;混凝土衬砌能防止动植物穿透或外力破坏,在正常情况下,混凝土衬砌渠道可运用50年以上;过流能力强,允许流速大,一般为3~5 m/s。便于管理,渠道采用混凝土衬砌后,除解决渠道坍塌、冲刷外,还可防止杂草生长,减少淤积,便于管理,节省管理费用。缺点:适应变形能力差,易发生冻胀破坏,结构复杂,造价最高。工程造价约为95元/m2。
(下转第247页)
(上接第245页)
经方案比较,并考虑项目自身特点、该地区实际情况、工程造价及东港地区混凝土防渗技术的成功经验,该次施工渠道防渗采用混凝土防渗方案。
4综合效益分析
4.1经济效益
项目建成后可改善水田面积1 333.33 hm2,可增产3 t/hm2,每年可增产粮食2 000 t,水稻及副产品的现行价格按2.0元/kg计算,则年可新增产值400万元;项目竣工后灌溉水利用系数由0.43提高到0.53,节水量为3 420 m3/hm2,全区共节水456万m3,可用于椅圈镇居民生活和工业用水;项目竣工后,有利于形成稻养蟹、蟹助稻、稻增产、蟹丰收的稻蟹共生、一水两用、一地双收的高效、立体、生态种养模式,成蟹平均产量为300 kg/hm2,每年可产河蟹400 t,按12元/kg计,每年可新增产值480万元。项目区新增农产品生产能力2 400 t,农民收入总额增加,纯收入增加400万元,项目区人均增收256元。
4.2社会效益
项目区标准农田建设项目实施后,改善了灌溉渠道的输水状况,提高了用水效率,做到了适时、适量的计划供水,改善了农业生产条件,有利于当地农民调整产业结构,提高农业综合生产能力和农村经济实力、增加农民收入,可充分调动农民种粮积极性,确保国家粮食生产安全。
4.3生态效益
项目区开发后,营造防护林可增加林网覆盖率,有效控制水土流失面积,减轻了水土流失对土地的破坏,既减轻了对沟壑的割切,又避免了土地的石化和砂化,明显减轻河道的洪水、泥沙危害,减轻了风蚀和风沙的危害。同时可使农田防护林网内的温度、湿度、风力等发生变化,减轻了霜、冻和干热风的危害,更加有利于农、林、牧副渔等各行业的健康发展。
5结语
东港市水稻主产区为老水田区,农业基础设施相对薄弱,经过改造后综合效益十分明显。但是因资金有限,有部分水利设施尚未配套,不能充分发挥效益。建议在今后农业综合开发中加大投入,并且可以整合涉农项目资金、多家单位紧跟开发步伐治理一大片的局面,开发和其他部门相互配合、联合治理,以创造更好、更大的经济效益和社会效益。
6参考文献
[1] 刘晓春.东港市现代农业的发展策略[J].新农业,2010(11):60.
[2] 胡振德.东港市依靠科技进步推进农业产业化进程[J].辽宁科技参考,2001(6):30-32.
篇3
关键词:农业综合开发;高标准农田;探析
中图分类号:F304.1文献标识码:A文章编号:
引言:“资金安排向高标准农田聚焦,项目布局向粮食主产区聚焦”这是回良玉副总理“两个聚焦”的重要论断,是农业综合开发当前和今后一段时间的工作重点和方向,是保障粮食安全的重要举措,是引领现代农业示范作用的重要途径。积极研究探索高标准农田建设模式、着力打造高标准农田对农业增产增效、农民增收具有重要意义。
1.高标准农田建设的内涵
高标准农田建设是指土壤、排管、作物、耕作方式等多种因素组成的复合体系,在现有经济技术条件下,通过人工改造,全面完善农业基础设施条件,实现土、肥、水、热、气、能等多种自然条件综合平衡,装备高水平、生产方式先进、管理现代化的高产、高效、优质、生态、安全,并具有持续保障能力,达到进排水通畅、条田格式化、作业路网网络化、生产全过程机械化,新品种、新技术应用现代化的标准农产品生产基地。
2.建设高标准农田是提升现代农业核心力的战略选择
2.1建设高标准农田是保障粮食安全的有效途径
粮食安全问题关系到民众福祉和社会稳定。耕地数量和耕地质量是决定粮食综合生产能力的两大关键因素。目前耕地数量与社会发展的矛盾越来越突出。一是随着城镇化和工业化进程的加快,耕地数量减少的趋势不可逆转;二是人口增加的趋势在一定时期内不可逆转;三是社会发展对粮食需求不断增加的趋势不可逆转。在这种情况下,农业综合开发抓住耕地质量这一关键因素,积极推进高标准农田建设,为稳定提高农田综合生产能力、保证国家粮食安全提供良好条件,奠定坚实基础。
2.2建设高标准农田是提升农田质量推动农田升级换代的重大举措
目前我国农业基础设施薄弱的状况尚未根本改变,不少地方农田质量和农产品品质难以满足现代农业发展的需要,因此推进高标准农田建设,是对农田质量的一次重要提升和根本性保护,是在改造中低产田的基础上,对农田建设的一次升级换代。
2.3建设高标准农田是加快发展现代农业和建设社会主义新农村的现实需要
农田质量不仅是决定作物产量高低的主导因素,同时也决定着农产品品质和农业产业结构调整。建设高标准农田,将进一步拉动优质农产品基地建设,提高农产品的商品转化率和市场竞争力,夯实农业产业化发展基础,为现代农业发展创造良好条件,从而加快项目区建设社会主义新农村的进程。
3.农业综合开发推进高标准农田建设的思考
3.1加强领导,协调推进,切实形成实施高标准农田建设的强大合力
各级、各部门特别是县级政府要将高标准农田建设纳入本部门的工作重点,主要领导要亲自抓,分管领导要具体抓,扎扎实实抓出成效,形成“领导重视,上下联动,合力推进”的工作机制。同时高标准农田建设是农业支农资金投向的集聚和创新,应加大资金投入,发挥规模效应。一方面积极争取中央财政资金,加大财政支持力度;另一方面整合支农建设资金增加投入力度。对此,应充分发挥农业综合开发综合性、区域性和按照项目管理的优势,以高标准农田建设为平台,以农业综合开发资金为引导,整合水利、农业、土地等相关涉农建设资金,吸引信贷资金和民间资本,实行项目大集中、资金大整合,建立项目建设高效运行机制。按照“多元投入、立体开发”的原则和“资金性质不变,管理渠道不乱,统一规划,各司其职,各记其功”的思路,统筹资源,合力推进高标准农田建设。
3.2加大宣传,提高认识,确保高标准农田建设顺利实施
高标准农田作为一种新生事物,实施过程中必然会遇到一定阻力,其中最大的阻力还是来自农民的认知程度。目前,农村普遍实行,对土地略微的占用与调整,均涉及到农民的自身利益,常常由此引发各类占地矛盾。而高标准农田建设需要打破现有土地格局,进行统一规划,统一治理,这也成为高标准农田项目推动难度较大的主要原因。对此,应加大宣传教育力度,一是通过电视、广播、报纸等舆论媒体加以宣传。通过高标准农田建设在现代农业发展中的引领作用和重要意义,宣传高标准农田建设带来的长远利益和发展前景,营造良好的舆论氛围和有利的工作条件。二是加大对示范点的宣传力度。通过现场观摩,舆论引导等推广典型经验和成效,以示范带动作用加以宣传引导,让群众看到,经过土地治理,耕地面积可增加6%-10%的巨大潜力,为大家谋福利的长远利益,并通过土地治理提高自身亩产量所带来的经济效益,使其在对比中得到启发,从而逐步转变认识观念。让农民群众接受、配合、并愿意加入到工程建设中来。
3.3严格标准,统筹协调,整体推进高标准农田建设
高标准农田建设应坚持高起点定位、高标准实施、高效率推进,着力打造精品工程。在项目建设过程中,严格按高标准农田建设质量、建设标准实施,水利、农业、农机、林业、科技等措施整体推进,田水路林山综合治理,真正达到治理效果。平坦地区实施“平整格田化”治理,达到渠相通、路相连、旱能灌、涝能排、渍能降、田成方、林成网,基本实现园田化;坡耕地区实施“等高格田化”治理,达到旱能灌、洪能排、路相通、基本实现梯田化。排灌渠道根据需要设计建设,桥涵闸站渠配套齐全,达到旱能灌、涝能排、渍能降。田间道路建设达到顺直通畅,满足大中型农业机械通行要求。全面推进“沃土工程”,加大秸杆还田、稻壳还田的力度,增施有机肥,加强地力建设,提升土壤有机质含量。全面实现土地平整条田化,道路相通硬质化,沟渠相连衬砌化,桥涵配套通达化,农田作业机械化,全面彰显高标准农田建设的高层次、高起点、高标准、高质量、高效益。
3.4制定规划、规范有序地推进高标准农田建设
高标准农田建设是农业支农资金投向的整合聚集,集中力量支持粮食主产区建设高标准农田,是一项涉及利益调整的改革,必须有理论作支撑、有制度为约束、按规划来实施。要在统一规划的基础上,明确各级各部门的职能和责任,有序组织实施。一是编制高标准农田建设规划。要围绕发展现代农业和建设新农村的目标,依据地方总体规划和优势农产品产业规划,组织有关专家认真编制“高标准农田建设规划”,建设规划要注重粮食主产区,突出万亩以上规模粮田,突出地区特色产业发展。确保规划合理、设计科学,并以规划为引领,认真组织实施。二是对确定的项目区进行整体规划,科学设计。对建设规划确定的项目区按照综合、超前、可行的原则进行规划布局和科学设计。综合是强调水、土、田、林路综合治理,田渠路桥林等各项工程合理布局,实现布局一体化;超前是设计的项目区20年、30年以后仍然先进、适用,打造永固工程;可行是对每个单项工程认真进行实地勘察、详细论证、广纳民意、切实做到科学规划到位,提高项目建设标准。
3.5创新机制、深度开发、放大项目建设效应
一是创新实施主体,大力推进土地规模化经营、产业化发展。探索和鼓励其为项目实施主体,直接申报农发项目,并通过承包、反租、倒包、合作入股及托管等方式,实施先流转后开发,这样既能解决调地难的问题,又可推进规模开发,变低效利用或闲置状态土地为高产高效土地,发挥土地最大效益,促进农业规模化、产业化发展。同时也为二、三产业提供劳动力资源。二是要实行深度开发,提高土地利用集约化水平。开发与利用并重,实行深度开发,只有逐步实现粮食规模化生产,才能提高种粮的比较效益,才能增强发展粮食生产的内在动力。农业综合开发在项目区完成“硬件”设施建设后,要继续进行深度开发,安排少量资金,培育和启动农民用水户协会、农机合作社、农业技术应用协会、专用粮食品种生产协会等“软件”组织建设,在不改变现有土地承包经营权的前提下,实现统一机耕、统一播种、统一灌溉、统一施肥和统一机收,提高粮食生产的标准化、组织化、集约化程度。
4.结语
开展高标准农田建设,是引领现代农业发展,加快社会主义新农村建设的现实需要,其重要意义不言而喻,应结合本地实际,逐步探索出适合本地区的高标准农田建设思路,争取建设一片,成效一片,从而进一步保证国家粮食安全。
参考文献:
[1]国家农业综合开发办公室.2009年农业综合开发优秀调研报告和论文集.2010.
[2]张钢军等.关于推进辽宁省高标准农田建设的思考.农业经济.2010年第3期:35-36.
篇4
关键词 高标准农田;建设现状;对策;四川南江
中图分类号 S28;F327 文献标识码 A 文章编号 1007-5739(2014)05-0228-02
南江县位于四川东北边缘,毗邻陕西省汉中市和广元市旺苍县,距成都463 km、西安432 km、重庆520 km。全县辖48个乡镇、522个村、86个社区,幅员面积3 383 km2,总人口70.36万人,现有耕地2.82万hm2,其中水田1.7万hm2,旱地1.12万hm2。全县耕地分为水稻土、紫色土、冲积土、黄壤、黄棕壤和石灰(岩)土等6个土类,大部分土壤富钾、缺磷、氮不足。面积最大的土类是水稻土,占46.38%,其次是紫色土类,占27.9%。近几年来,南江县以“新增千亿斤粮食生产能力建设”、“新增农资综合补贴用于粮食基础生产能力建设”、“退耕还林基本口粮田建设”等项目为契机,紧紧围绕农业增效、农民增收和农村稳定的总体目标,坚持高标准农田建设的基础性、示范性和引导性,以加强农业基础设施、提高农业综合生产能力为重点,丰富和谐新农村内涵,为盆周山区高标准农田建设探索了新路子[1-2]。
1 南江县高标准农田建设现状
1.1 新增农资综合补贴资金用于粮食基础生产能力建设
中央财政新增农资综合补贴资金集中用于粮食基础生产能力项目建设有特色。2010年项目建设高标准农田930.67 hm2,在长赤镇和红光乡9个村具体实施。新建、整治田间灌排渠系62.542 km、排湿渠1.65 km,新建配套建筑物2 235处,小型抗旱水源工程:整治山坪塘20座、新建蓄水池40口,小型灌排泵站2处;田(土)型调整:田型调整415.4 hm2,修筑田(地)埂3 750 m,培肥地力303.07 hm2。
1.2 巩固退耕还林成果基本口粮田建设
南江县巩固退耕还林成果基本口粮田建设项目成效明显。2008―2012年在南江县下两、八庙、正直、大河等18个乡镇实施,建设基本口粮田3 240 hm2,其中坡改梯733.33 hm2,改土培肥753.33 hm2,改造中低产田1 753.33 hm2。新建和维修蓄水池162座,新建沉沙池或山粪池867口,新建小型提灌站2座,新建和整治排灌沟渠87.85 km,整治山坪塘111口,新建田间作业道26.93 km,整治机耕道18.86 km。通过项目建设,实现了能排、能灌,扩大防涝面积,增加保灌面积,提高有效灌溉面积,实现旱、涝保收;同时,通过实施土壤改良,增施有机肥,推广项目、稻田保护性耕作等技术,促进秸秆还田,提高土壤有机质含量,加强耕地质量建设,培肥地力,不断提高耕地综合生产能力,确保粮食安全,实现由“藏粮于仓”向“藏粮于地”的战略性转变。
1.3 新增千亿斤粮食生产能力建设
全国新增千亿斤粮食生产能力建设质量高。全国新增千亿斤粮食生产能力2010―2013年田间工程及农技服务体系建设在长赤镇的建华村、清泉村和元潭乡的字库、九泉、石寨村等19个村实施,建设高标准粮田1 333.33 hm2,新建及整治田间灌渠系24 km,新建蓄水池20口,新建提灌站2座,田间耕作道3.75 km,整治机耕道5 km,土地平整166.67 hm2,地力建设1 000 hm2。按时、按质、按量高标准的全面完成建设任务。
据统计,南江县2007―2013年在长赤镇、南江镇、沙河镇、正直镇、东榆镇、红光乡、红四乡等逾20个乡镇实施高标准农田项目,共建设高标准农田5 573.33 hm2,其中坡改梯1 506.67 hm2,改土培肥10 240 hm2,改造中低产田5 186.67 hm2。新建蓄水池530口,开挖、疏浚渠道852.4 km,新建、整治排灌渠系2 028.15 km,整治山坪塘133口,新建田间耕作路110.2 km,整治机耕道113.86 km。建设内容为小型蓄水工程、灌排渠系建设、田(土)型调整、梯田埂建设、农田耕作道、机耕道的整治等农田基础设施建设及农耕农艺等配套设施建设。通过项目实施,使项目区灌溉保证率达到95%,将原来的旱田、“望天田”变为能排能灌的高产稳产农田,大大提高粮食基础能力,促进了农业发展。该项目可使项目区农户中低产田土比例由80.95%降为18.6%。项目区年粮食基础能力由现在的10.5 t/hm2提高至12.225 t/hm2,年平均增产1 725 kg/hm2,年新增粮食基础生产能力6 605.4 t。
2 抓好盆周山区高标准农田建设的具体措施
2.1 强化“三大保障”,高规格推进建设
一是加强组织领导,确保措施落实。县委、县政府高度重视项目工作,将其作为贯彻落实党的十八会议精神、为农民办实事、提高农业综合生产能力、增加农民收入的惠农措施来抓。政府要成立以分管农业的副县长为组长,县农业局局长、财政局局长为副组长的项目领导小组,狠抓任务、资金、人员、技术“四落实”。县农业局成立了技术专家组、外业下乡督查组等工作机构,土肥站具体负责项目的实施及日常工作,从而做到领导、技术、人员、后勤保障“四到位”;各项目乡镇也要建立相应机构,做到项目实施党政重视、部门齐抓共管,确保项目实施的各项措施落到实处。二是资金保障。坚持“政府补助、农民主体、社会参与”的原则和“性质不变、渠道不乱、配套使用、各交各的账,各记各的功”的原则,按照各资金来源部门对项目实施的具体要求,加强项目资金整合,优化资源配置。三是科技保障。发挥科技支撑作用,加快完善农技推广服务体系建设,农业局要抽调专业人员分片蹲点作业,加强技术指导和质量监督。开展与农科院校合作,集成应用耕地保育技术、耕地污染防治技术和配方施肥技术,挖掘增产潜力[3]。
2.2 坚持“三大原则”,高起点编制规划
一是因地制宜、整体规划的原则。实施项目中,要严格实行项目业主制、工程招投标制、建设监理制和合同管理制,加强对工程质量、进度的监管。把建设示范片,建好精品工程,突出规模效益,塑造良好的社会形象作为规划设计工程着眼点,坚持“高起点规划设计、高质量施工、高规格利用、高效益运行”的原则,坚持集中成片、规模开发、整体推进的改造开发策略,切实搞好项目规划设计。二是集中连片、综合治理的原则。要深入到项目乡镇实地踏勘,对项目规划设计进行现场初验,做到规划设计标准一致、项目实施程序一致。采用同一个标准进行工程建设,无论是丘陵盆周山区还是平地,无论是改田还是改土,工程标准设计要高、质量要好;田型调整要规范,农田排灌渠系布局科学合理,经济实用,排灌渠平直、牢固、美观,按沟渠的功能深度达标[4];修建的桥、涵、闸、池、农田制口和道路等配套设施,做到数量足、质量高、设置合理;改土工程做到地埂牢固,台位清晰,坡面水系健全,沟、池、凼、路布局合理,配套齐全,达到改土“平、厚、壤、固、肥”技术标准。三是重点突出、产业优先的原则。按新高标准农田建设方案要求实施,结合项目重点抓好建设村的银花、茶叶等南江特色产业发展。
2.3 突出“三大重点”,高标准组织实施
一是明确工程任务,加快项目实施。县农业局、财政局领导要随时督查工程质量和进度。实施严格的工程管理制度,做到任务明确,分解到人,实行外业下乡人员包片负责,随时进行项目质量监督、检查工作,加强技术指导。做好每个项目的规划、设计、施工等工作。各项目乡镇、村社积极配合,按照下达的项目计划,严格按照设计施工,分工序检查,加快项目建设进度,确保按时完成工程。二是加强项目管理,保证工程质量。坚持实行目标管理责任制,层层分解任务、落实责任,各施工企业、监理单位和项目业主要明确职责,加强项目监管,严格按照省农业厅制定的《建设1 000万亩高标准农田工程规划纲要(2011―2015年)》和《四川省粮田建设标准》等相关技术标准进行建设。在施工过程中始终要求把质量放在首位,严格基本建设程序。项目业主对施工企业的质量和进度要进行定期督查;监理单位要随时监督施工企业的施工质量;对各项目乡镇的项目实施进展情况进行督查,对进度慢、建设质量不合格有关责任单位和个人实行公开曝光;实行“倒计时”制度,对项目实施单位实行一月一汇报,确保按期按质完成项目实施计划。三是加强资金管理,确保后勤保障。在资金管理使用上,要严格按照财政部、农业部《项目试点补贴资金管理暂行办法》要求,实行专户储存、专人管理、专款专用,并建立和落实工作责任制,加强资金使用情况的检查,自觉接受财政、审计等部门的监督,确保项目各项工作顺利开展。
3 存在的问题
一是南江县中低产田土面积大,人均占有率高于全省平均水平,项目投入力度不大,导致中低产田土比重大,农业抗御自然灾害能力弱,一遇极端天气,对农业生产和粮食安全产生较大威胁。二是部分乡镇对高标准农田建设的重要性认识不够到位,组织领导措施不够得力;争取项目时积极主动,建设项目时消极应付。三是按照产业化的思路来规划和组织实施项目的力度不够,产业结构调整还有大量的工作要做,一定程度上影响了综合效益的发挥。四是项目建设与质量标准还有一定差距,重“硬件”建设、轻“软件”建设,重工程建设、轻工程管护的现象较为普遍。五是随着高标准农田建设时间的推移和社会经济的不断发展,砂石、水泥、肥料等物资价格上涨,项目实施单位造价增高,资金严重不足,导致项目实施达不到预期的质量和效果[5-6]。
4 实施盆周山区高标准农田建设的对策
一是盆周山区高标准农田建设涉及面广、工作量大、技术要求高、任务重,尤其是在盆周山区县,交通极为不便,环境较差,地方财力相当紧张,工作经费支出相对较大,在项目概算中,参照当地、当时材料价格适当调高单价,同时增加工作经费比例,以确保工程质量和进度。二是继续加大国家、省市农业主管部门对盆周山区县农业立项,特别是在基本口粮田建设、新增千亿斤粮食生产能力建设等高标准农田建设项目更多、更大的支持。按照统筹规划,捆绑资金、合理布局、突出重点、集中资金、有序实施,确保建设质量,发挥资金的规模效益,推动土地改造、开发、利用的可持续发展。三是加强工程建后管护。要创新机制,制定一套切实可行的管护办法和措施,把建后管护作为一项长期工作来抓,定期对建后工程追踪检查,发现问题及时解决。此外,建立奖惩机制,将工程管护工作纳入考核目标,确保建后管护工作落实[7]。
5 结语
总之,南江县高标准农田建设项目工作在省、市农业主管部门领导的关心支持下,相关部门密切配合,高标准农田建设质量高,农业增产、农民增收效果明显。在盆周山区实施高标准农田建设中,应当按照省、市主管部门的要求,加大力度,拓展思路,创新机制,探索盆周山区高标准农田建设新路子,从而加快盆周山区高标准农田建设步伐,以适应农业结构调整,提高农业综合效益,达到农业增产、农民增收和粮食生产安全,为实现盆周山区农业可持续发展提供可靠的保障。
6 参考文献
[1] 董艳玮.东港市椅圈镇高标准农田建设项目综合效益分析[J].现代农业科技,2011(11):247,249.
[2] 吴行一,陈军,曹承富,等.建设高标准农田任重道远――旱灾之后的思考与建议[J].安徽农业科学,2009(22):452-455.
[3] 齐西文,许芳艳,季志云,等.推动高标准农田建设 促进团场经济和生态建设快速发展[J].新疆农垦科技,2013(1):63-64.
[4] 田栋.甘谷县高标准农田示范工程建设探讨[J].甘肃科技纵横,2013(10):83,138-139.
[5] 赵琦,陈曙光,叶新华.高标准农田建设的做法与思考[J].农业开发与装备,2009(5):18-21.
篇5
关键词:高标准基本农田;建设区域;划定;层次分析法;鄂西北;南漳县
中图分类号:F301.21 文献标识码:A 文章编号:0439-8114(2016)05-1151-05
DOI:10.14088/ki.issn0439-8114.2016.05.016
High-standard Primary Farmland Construction Area Zoning in
Northwest of Hubei Province
QIU Li-juana,LIN Ai-wena,b,LI Hai-jianga,PENG Peia,ZOU Linga
(Wuhan University, a. School of Resource and Environment Science;
b. Key Laboratory of Geographic Information System, Ministry of Education, Wuhan 430079, Hubei, China)
Abstract: Taking Nanzhang county in northwest of Hubei province as case, selecting factors from four aspects of natural quality, producing condition, location and ecology, an evaluation model for zoning high-standard primary farmland construction area was established by AHP method, then an analysis of limited factors was conducted to define the construction direction. The results showed that the construction conditions in Nanzhang county indicated a certain spatial pattern. To be specific, conditions in the eastern area, southern area and the northwest area were the best, worse and the worst respectively. According to the evaluation results, 42 800.48 hm2 of primary farmland were zoned into the high-standard primary farmland construction area. Further, for the zoned construction area was deeply restricted by conditions of production and ecology, the constructions of infrastructure condition and ecological protection project should be strengthened. The evaluation model can quantify influencing factors effectively, especially its try of bringing in landscape indexes in describing ecological characterization, and combined with the farmland protection area radio and pollution intensity to quantify it, which provided a scientific basis for high-standard primary farmland construction area zoning.
Key words: high-standard primary farmland; construction area; zoning; AHP; northwest of Hubei; Nanzhang county
耕地保护和粮食安全问题一直是国内热点,耕地资源在庞大的人口下显得十分稀缺,改革开放以来日益加快的工业化、城市化进程又使耕地资源大量流向非农利用,耕地生态环境恶化,影响国家粮食安全[1]。在人类的历史进程中,确保人类粮食总体需求的根本途径只有两条,扩大粮食种植面积与提高单位耕地面积粮食的产量[2]。就当前发展形势而言,提升耕地产能无疑是保障粮食安全的重中之重。国家已从战略层面明确大力推进高产稳产基本农田建设为重点的农田整治。2010-2014年中央“1号文件”多次强调高标准基本农田的建设。
高标准基本农田建设兼顾了耕地数量、质量、生态管理的内涵,随着生态文明建设力度加大,基本农田承担越来越大的生态涵养功能和景观美化功能[3]。目前,高标准基本农田建设研究主要集中在潜力评价[4-6]、空间划定[7-10]、建设时序与模式分区[11-14]等方面。在空间划定研究的指标体系构建中,耕地质量与基础设施完备度的量化指标相对完善,但生态方面相对欠缺,一些学者对此进行积极地尝试,通过判断区域是否为重点生态保护区对生态影响进行量化[7],通过对研究区土地进行生态安全分级后对其内的基本农田赋值生态安全修正系数[8],引入田块集聚度对生态景观进行量化[9],用农田防护林相关指标来刻画农田的生态良好程度[10]。但这些研究所选量化指标相对单一,具有一定的片面性。本研究尝试引入景观指数结合农田防护面积比例及环境污染强度来定量刻画耕地的生态良好程度,并在此基础上探讨高标准基本农田建设区域的划定方法。鄂西北地区地形条件复杂,以南漳县为例,对其进行高标准基本农田建设区域划定研究,为鄂西北地区高标准基本农田建设工作提供科学依据。
1 研究区概况及数据来源
1.1 研究区概况
南漳县位于湖北省西北部,位于111°26′-112°09′E、31°13′-32°01′N,地处江汉平原北缘,南阳盆地南缘,荆山山脉东麓。地形复杂,西高东低,大致可分为中山地带、低山丘陵地带、平原岗畈地带三级阶梯。研究区属北亚热带季风性气候区,日照充足,年均温10~16 ℃,境内水资源丰富,自北向南分布有潍水、蛮河、漳河、沮河四大河流,自西向东穿越县境,泉眼众多,有水库130余座,为灌田提供了重要保障。全县耕地总面积85 211.68 hm2,基本农田面积58 547.11 hm2。
1.2 数据来源
空间数据主要从南漳县1∶1万土地利用变更调查矢量数据(2011年)、南漳县1∶1万土地利用总体规划(2010 ― 2020年)、南漳县农用地分等定级更新成果中提取,统计数据从南漳县统计年鉴(2012年)和实地调研得到。
2 研究方法
采用层次分析法,从自然质量、生产、区位、生态4个方面构建了高标准基本农田建设区域划定模型,基于已有数据利用ArcGIS 10、Fragstats 4.2软件获取指标值,并对其进行标准化,根据评价模型计算各基本农田片块的综合得分,根据评价结果划定高标准基本农田建设区域。
2.1 评价单元的确定
高标准基本农田是指在规划时期内,通过农村土地整治形成的集中连片、设施配套、高产稳产、生态良好、抗灾能力强、与现代农业生产和经营方式相适应的基本农田[15]。在以往高标准基本农田划定研究中常以基本农田图斑或耕地图斑作为评价单元[8-10],这可能会导致相互连接(有公共边)的地块中只有部分被选中,这样在最后的划定结果中连片性无形中就被削弱了。高标准基本农田强调规模生产,十分注重地块的连片性,为避免上述情况出现,同时考虑到高标准基本农田建设属土地整治范畴,土地整治是以行政村为具体实施单位,而基本农田片块是以村或自然地块为单位的耕地保护区域,即以村为单位对基本农田图斑进行融合后形成的区域,因此将基本农田保护片块确定为评价单元。
2.2 指标体系的构建
根据高标准基本农田内涵、相关标准[15,16],结合专家意见,从自然质量、生产、区位、生态4个方面构建高标准基本农田建设区域评价指标体系。自然质量条件主要体现在耕地肥力、规模、坡度等因素对工程建设难度的影响;生产条件主要体现在基础设施的完备度对建设工程量影响;区位条件体现在距道路、城镇、村庄的远近对农资投入效率、农产品商品化便捷度及耕作便利度的影响;生态条件的限制主要指农田防护、环境污染及农田景观对农田生态建设的影响。另因评价对象是基本农田,规划时已避开城镇规划区、有条件建设区、重点项目建设区等,故指标体系中不考虑此类政策因素。运用层次分析法结合特尔菲法确定指标因子的权重。同时为消除指标量纲影响,参照相关研究[8,17,18],采用分级给分法对指标进行标准化,由此建立高标准基本农田建设区域划定模型(表1)。
2.3 评价指标值的获取
自然质量等、连片性等空间指标是在ArcGIS 10的支持下,基于基本农田数据、土地利用变更数据、农用地分等数据,通过叠置分析、缓冲区分析、空间统计分析等功能获取的。农机化水平及环境污染强度由统计数据结合实地调查得到,并通过属性挂接的方式赋值给基本农田片块。指标的具体参数设置:①将相隔20 m以内的基本农田视为连片。②环境污染强度主要是指耕地中残留的化肥、农药、地膜造成的污染,三者残留率分别取64%、65%、42%[19,20]。③景观脆弱度采用的是脆弱度模型V=α×AWMSI+β×F+γ×D,其中α、β、γ分别取值0.59、0.28、0.13,AWMSI、F、D分别为面积加权的平均形状因子、分维数、分离度[21],通过Fragstats 4.2软件求得。
3 结果与分析
3.1 高标准基本农田建设区域划定
对南漳县6 152块基本农田保护片块进行评价,并用自然断点法对各片块的综合得分进行分级:Ⅰ级(高度适宜)、Ⅱ级(中度适宜)、Ⅲ级(低度适宜)、Ⅳ级(不适宜),结果见图1。
Ⅰ级区面积28 724.51 hm2,所占比例为49.06%,集中分布在东北部平原岗畈地区。该区地势平坦,土壤熟化度高,土层深厚,有机质含量高,一般在2.0%~3.0%之间,最高可达3.9%,连片规模均在150 hm2以上,形状规整,聚集度高,非常适宜大规模机械化生产。该地区同时也是南漳县经济发展的腹地地区,农业生产条件良好,石门、三道河、云台山三大水库加上密布的沟渠为该区的农田灌溉提供了可靠的保障,发达的交通路网及集镇为物资投放及农产品交易提供了充分的保证。
Ⅱ级区面积14 075.97 hm2,所占比例为24.04%,主要分布在南部丘陵地区及东部平原区的边缘地带。交通及集镇的发达程度虽不及平原区,但从该区穿流而过的沮河、漳河两岸分布有较大规模的冲击平原,土壤肥沃,质量等别高。农机化水平达到该县的中等水平,防护林分布较多,斑块形状较规整,农田生态条件较好。
Ⅲ级区基本农田面积10 679.19 hm2,所占比例为18.24%,主要分布在西部山区。这些地区土壤质地较差,肥力低,有的基本农田片虽然具有一定的规模,高者亦可达上百公顷,但复杂度高,外形多呈枝丫状,景观脆弱度大,易敏感,生态条件较差。
Ⅳ级区面积为5 067.44 hm2,所占比例仅为8.66%,集中分布在西北部山区及乡镇交界带上。受地形因素影响,该地区的土类多为砂石、砾石,土层薄,有机质含量低,破碎度高,坡度较大,易发生水土流失等地质灾害,生态安全度低。加上地处偏远,农路基础设施条件差,基本无灌溉水利设施。
根据以上分析,Ⅰ级区已基本具备建设高标准基本农田条件,Ⅱ级区需稍加改造可建设成为高标准基本农田,Ⅲ、Ⅳ级条件较差,不太适宜建设高标准基本农田,因此将Ⅰ、Ⅱ级区划为高标准基本农田建设区域,共2458个基本农田片块,面积合计42 800.48 hm2,占基本农田总面积的73.1%。
3.2 高标准基本农田建设方向
高标准基本农田建设应针对相应的限制性因素制定正确的方向,对限制因素采取科学合理有效的方式加以削弱和消除,打破低效均衡利用状态,充分挖掘基本农田生产潜力。针对划定的高标准基本农田建设区域,分别从自然质量、生产、区位、生态条件4个方面考察其限制区分布,根据各评价因素得分,划分为三个级别:优(≥80分)、一般(60~80分)、差(
自然质量条件限制区面积16 459.94 hm2,占划定建设区域总面积的39.48%,主要分布在西部及南部。该地区主要为山地丘陵,土层薄,有机质含量一般在2%以下,坡度多为Ⅱ级,连片性一般。该区可通过实施培肥地力工程提高耕地肥力水平,对于坡度较大的可实行坡改梯,增加农田的保水保肥能力,西部山区应注意辅以生态护坡工程,控制水土流失。
生产条件限制区面积共33 607.12 hm2,所占比例达78.66%,除东部经济发达区外,其余地区的生产条件均不理想。应加强水利及田间道路等农业基础设施建设,保障灌溉用水,提高田间道路通达度,改善农业生产条件,使农田的生产潜力得以发挥。
区位条件限制区面积共10 064.02 hm2,所占比例为24.31%,主要分布在乡镇边缘且距公路较远的地区,尤其是九集北部和巡检西部。可通过完善公路网,消除交通死角,提高农业物资投放效率及农产品商品化率。
生态条件限制区面积共39 076.12 hm2,所占比例高达90.19%,县内均有分布。由于南漳多山地、低岗,耕地的空间形态多呈枝丫状,形态复杂,分离度高,脆弱度大,农田防护面积比例小,多数地区基本无农田防护工程。加上长期大量使用农药农膜容易造成土壤理化性质变化,作物生长受到抑制,农田生物多样性降低。应大力推广精准施肥施药等环境友好型农业生产技术,降低农田环境污染负荷,实施土地平整和景观提升工程,优化农田的景观格局。
4 小结与讨论
以基本农田为评价对象,从自然质量、生产、区位、生态条件4个方面建立高标准基本农田建设区域划定模型,确定高标准基本农田建设项目区空间布局,并进一步地对划定区域进行限制因素分析,明确其建设方向。主要结论如下:
1)基于评价模型将南漳县基本农田划分为高度适宜、中度适宜、低度适宜和不适宜4个等级,面积分别为28 724.5 1、14 075.97、10 679.19、5067.44 hm2,且呈现出东部平原岗畈区较优、南部丘陵地区次之、西部山区最差的空间规律性。将基本已具备高标准基本农田条件的高度适宜区和稍加改造可建设成为高标准基本农田的中度适宜区划入高标准基本农田建设区域,共42 800.48 hm2,占全县基本农田总面积的73.1%。
2)分别从自然质量、生产、区位、生态4个评价因素出发,对划定的高标准基本农田建设区域进行分析,从而确定各要素的限制区范围及分布。其中,区位条件限制区面积最小,主要分布在乡镇交界处,可通过完善交通路网消除交通死角;其次为自然条件限制区,主要分布在西部及南部,应以地力提升工程为主;生产条件限制区面积较大且限制程度大,主要分布在西部及东南部,应加强农田基础设施建设,改善生产条件;生态条件限制区最广,应注重耕地生态建设,扩大耕地防护面积,推广精准化农业,减轻农田污染负荷,实施土地平整和景观提升工程,降低耕地脆弱度。
3)评价模型能够有效地量化各影响因素,为高标准基本农田建设区域的划定提供了科学依据,具有现实意义。在生态条件刻画上,尝试借助农田防护面积比例、环境污染强度、景观脆弱度来量化耕地的生态良好程度,弥补了以往研究对耕地生态方面刻画的不足。
参考文献:
[1] 邹 健,龙花楼.改革开放以来中国耕地利用与粮食生产安全格局变动研究[J].自然资源学报,2009,24(8):1366-1377.
[2] 李玉平,蔡运龙.区域耕地-人口-粮食系统动态分析与耕地压力预测――以河北省邢台市为例[J].北京大学学报(自然科学版),2007,43(2):230-234.
[3] 刘新卫,李景瑜,赵崔莉.建设4亿亩高标准基本农田的思考与建议[J].中国人口・资源与环境,2012,22(3):1-5.
[4] 郭凤玉,马立军.县域高标准基本农田建设潜力分区研究[J].湖北农业科学,2014,53(10):2287-2289.
[5] 方勤先,严 飞,魏朝富,等.丘陵区高标准基本农田建设条件及潜力分析――以重庆市荣昌县为例[J].西南师范大学学报(自然科学版),2014,39(3):122-130.
[6] 龙雨涵,杨朝现,程相友,等.西南丘陵区高标准基本农田建设潜力测算及模式探讨[J].西南师范大学学报(自然科学版),2014, 39(7):144-150.
[7] 沈 明,陈飞香,苏少青,等.省级高标准基本农田建设重点区域划定方法研究――基于广东省的实证分析[J].中国土地科学, 2012,26(7):28-33.
[8] 王新盼,姜广辉,张瑞娟,等.高标准基本农田建设区域划定方法[J].农业工程学报,2013,29(10):241-250.
[9] 薛 剑,韩 娟,张凤荣,等.高标准基本农田建设评价模型的构建及建设时序的确定[J].农业工程学报,2014,30(5):193-203.
[10] 王 晨,汪景宽,李红丹,等.高标准基本农田区域分布与建设潜力研究[J].中国人口・资源与环境,2014,24(S2):226-229.
[11] 冯 锐,吴克宁,王 倩.四川省中江县高标准基本农田建设时序与模式分区[J].农业工程学报,2012,28(22):243-251.
[12] 韩春兰,刘庆川,么欣欣,等.辽宁省清原县高标准基本农田建设类型分区研究[J].土壤通报,2013,44(5):1041-1046.
[13] 张 忠,雷国平,张 慧,等.黑龙江省八五三农场高标准基本农田建设时序分析[J].经济地理,2014,34(6):155-161.
[14] 马立军,郭凤玉.高标准基本农田建设时序与模式[J].湖北农业科学,2014,53(11):2661-2666.
[15] TD/T1033-2012,高标准基本农田建设标准[S].
[16] GB/T30600-2014,高标准农田建设通则[S].
[17] 郭 龙,张海涛,于 波,等.基本农田易侵占区域的划定[J].华中农业大学学报,2011,30(6):740-745.
[18] 董秀茹,尤明英,王秋兵.基于土地评价的基本农田划定方法[J].农业工程学报,2011,27(4):336-339.
[19] 祁兴芬.区域农田生态系统正、负服务价值时空变化及影响因素分析――以山东省为例[J].农业现代化研究,2013,34(5):622-626.
篇6
一、加强领导、落实责任
以改造中低产田为手段建设高标准农田是确保国家粮食安全,促进现代农业稳步发展的一大重要举措,也是当前乃至今后“三农”工作的一项重要任务。为了加强领导,加大部门沟通与协调,积极推进我县整合资金建设高标准农田工作顺利开展,我县成立了由副县长周世育任组长、县发改委、县财政局、农业局、水务局、国土局、县农办等部门主要负责人为成员的高标准农田建设领导小组。领导小组下设办公室为专门办事机构,办公室设县农业局,具有独立的办公场所,室内各项制度健全,并抽调6名工作人员负责日常管理工作。
二、编制规划、合理布局
我县从发展思路、总体布局、方法步骤、资金筹措、责任要求等方面,对高标准农田项目建设进行了详细规划并制定了工作实施方案。在规划及实施过程中,按照“定好一张单、各炒一盘菜、共办一席宴”的思路,坚持“资金性质不变、管理渠道不变、归口申报、各司其职、各记其功”的原则,实行“统一规划、统一标准、统一设计、统一施工、统一监管、统一验收”,变过去各涉农项目的“单枪匹马”、“各自为战”为集中连片、整体推进的集团作战方式,真正做到共搭一个台,同唱一首歌。一是科学设定项目区。坚持在农田基本保护区选择项目区,依据土地资源潜力大,有一定生产基础和良好生态环境等条件的片区,搞好项目区设定;二是工程合理布局。按照基本达到“土地平整、道路相通、沟渠相连、桥涵配套,农田作业机械化、农田防护林网化,农业设施现代化”的建设目标,结合项目区地形地貌、水系、村庄等内外部条件,进行项目区灌排、交通等工程的合理布局,充分发挥工程的全覆盖作用;三是捆绑项目跟进。项目实行统一规划合理布局后,集中捆绑各负其责,国土、农业、农业综合开发负责土地平整,水利负责解决灌溉渠道“最后一公里”。
三、精心组织、注重实效
本着分工协调,部门配合,各司其职的原则。根据全县整合资金建设高标准农田统一规划和实施意见总体发展思路和工作要求,我县集中统一制定了2011年度工作计划,并在领导小组集中领导下,各职能部门采取分线进行工作衔接和项目申报,分块运作实施,有效地发挥了项目资金最大效益,促进了高标准农田建设工作的整体推进和部门之间的共同发展,整合和建设工作取得了实效。
1、资金整合情况
2011年我县积极组织项目编制与申报工作,争取和整合项目资金共计3138.8万元,其中,农业综合开发土地治理项目资金745.8万元,小农水资金1750万元,种粮大户粮田建设工程项目资金643万元。建设高标准农田计划面积2.1万亩。
2、项目运行情况
我县成立整合资金建设高标准农田领导小组后,县政府高度重视高标准农田建设工作,县主要领导亲自抓,县财政、发改委、水利、国土、农业、农业开发等相关部门密切配合、通力协作,形成了方方面面齐抓共管的格局。领导小组成员经常就建设中的重大问题,尤其是资金整合问题进行研究、协调,及时解决工作中遇到的实际问题。领导小组设有专门办公场所,下设督查组、施工组、协调组、资金监管组,各组分工负责,为工作的顺利推进提供了有力保障。我县重点走好“三步棋”:一是落实项目责任制。按照“一个项目、一套方案、一个指挥部、一支队伍、一抓到底”的要求,成立各个项目建设指挥分部,任务完成情况与指挥分部工作人员业绩挂钩,营造了互促互比的良好工作氛围;二是实行交流互促。不定期组织各项目施工单位负责人、乡镇分管领导、村委会负责人和工程监理人员到各个项目工地进行学习交流、交叉检查,督促先进,鞭策后进;三是狠抓现场监理。我县采取专业监理与群众监理相结合,在项目区选择热心集体事务、有责任心的受益群众担任义务监督员,对项目实施全过程进行监督,并赋予工程计量签字权,形成政府、社会、群众三位一体的监督体系,有效抵制了“豆腐渣”工程出现。
3、资金管理情况
为了充分发挥资金的集聚效益,在资金管理方面,严格实行统一监管。一是对发改、农业、水利、农业综合开发、国土等涉及高标准农田建设项目的资金进行集中管理,统筹安排,重点投入,避免了资金使用的分散性与盲目性,突出了资金使用的“拳头”效应;二是不断完善财务制度,实行报账制,做到专人管理、专户储存、专账核算、专款专用,各部门按照工程进度填写资金申请计划,财政分期分批下拨资金,并向受益区村民公布,接受监督。三是工程竣工后,财政委托中介机构进行工程决算,审计局进行审计,强化资金监督检查,实行跟踪问效,确保建设资金落在实处,真正让农田水利建设资金发挥最大效益。
4、工作宣传情况
篇7
关键词:高标准粮田;建设;丹阳市
中图分类号 F323.211 文献标识码 A 文章编号 1007-7731(2016)13-0139-02
依据《国家粮食安全中长期规划纲要(2009―2020年)》(以下简称《纲要》),2020年全国粮食消费量将达到5 725亿kg,按照保持国内粮食自给率95%测算,国内粮食产量应达到5 450亿kg,比现有粮食生产能力增加近450亿kg。考虑到影响粮食生产和有效供给生产及有效供给的不确定性因素较多,本着提高粮食综合生产能力、确保供给、留有余地的原则,未来12年间需要新增500亿kg生产能力,提高国家粮食安全的保障程度。
《全国新增1000亿斤粮食生产能力建设规划(2009―2020年)》明确了新增500亿kg粮食需要通过高标准粮田建设等途径来实现。而项目建设的核心是提高基础地力,改善耕地质量,增强防灾抗灾能力,保证粮食生产的稳步提高。规定资金投入的主要建设内容是“农田灌排、田间道路、土地平整理、农田林网和地力建设等农田基础设施建设”。丹阳市高标准粮田建设项目的资金投入主要用于农田基础设施建设和地力建设。
1 项目实施情况
1.1 项目概况 丹阳市从2007年开始实施高标准粮田项目,分别实施了2007年国家优质粮食产业工程丹阳市标准粮田建设项目、2008年国家优质粮食产业工程丹阳市标准粮田追加项目、2011―2014年新增500亿kg粮食产能规划田间工程建设(高标准粮田建设)项目,累计建设规模8 733hm2,建设总投资6 681万元。
1.2 建设地点 2007年项目建设地点为延陵镇延陵村、赵巷村和宝林村,珥陵镇护国村、中仙村、丈山村、新庄村和大施村,练湖管委会三分场、九分场和十分场;2008年为珥陵镇丈山村、大施村,延陵镇柳茹村、赵巷村、宝林村;2011年为珥陵镇护国村、珥城村、中仙村,云阳镇花园村、汉皇村;2012年为珥陵镇积庆村、扶城村,司徒镇培棠村、丁庄村、杏村村;2013年为云阳镇双合村、永福村、大钱村;2014年为访仙镇仁里村、陵口镇留墅村、延陵镇麦溪村。
1.3 建设规模 项目实施以来,丹阳市高标准粮田建设累计实施规模8 733hm2,涉及珥陵、延陵、陵口镇、司徒、云阳、访仙、练湖管委会等7个镇、街道,26个行政村。
1.4 建设投资 项目实施以来,丹阳市高标准粮田建设累计投资6 681万元,其中中央资金5 155万元,地方投资1 526万元,中央投资占比77.16%,具体见表1。
1.5 建设内容 项目实施以来,按照实施方案批复,项目实际建设内容为:各类防渗渠244.569km、块石挡墙0.723km、泵站16座、田间道路51.842km(其中砼路32.203km、砂石路19.639km)、方涵4座、农桥1座、田间机行渠桥969座、各类渠系配套建筑物3 503座、渡槽5座,具体见表2。
2 实施效果
通过项目的实施,大大改善了原有的农田基础设施,方便了农民出行和农机作业,提高了灌溉能力,增加了粮食产量。根据项目区农水站和农户调查数据表明:渠道水利用系数由原来35%提高到65%左右,水稻每次灌溉时间减少1~2h、灌溉成本节约45~120元/hm2;水稻产量提高750~1 200kg/hm2、小麦产量提高450~600kg/hm2。
按照项目实施规模8 733hm2,灌溉成本节约75元/hm2计算,项目区每年灌溉可节约成本65万元;按照水稻产量提高975kg/hm2、小麦产量提高525kg/hm2,水稻单价3元/kg、小麦单价2.4元/kg计算,每年项目区农户增加收入3 654.9万元,节本增收3 719.9万元。
3 问题与建议
篇8
一是改善了生产条件。针对项目区“田块不整、沟渠不全,遇旱难灌、遇涝难排”的实际状况,采取了一系列综合治理措施:清沟除杂,畅通水路;改土整地,化零为整;修路建桥,便捷交通;植树造林,保持水土。通过综合整治,项目区基本达到了“渠相连、路通畅、田成方、林成网”的建设标准,农村生产生活条件和生态环境有了明显改善。
二是强化了科技支撑。通过不断加大农业新品种、新技术的引进、推广力度,引进优质粳稻新品种“扬粳4227”,推广稻麦标准化施肥、常见病虫害防治和秸秆全量还田等技术,新扩良种种植面积400亩;注重与省里下河农科所、大学等高校科研所的合作,重点围绕测土配方施肥、节水灌溉、秸秆还田、病虫害防治、标准化种植等开展农民技术培训,共培训1250人次,大大提高了农民科学种田水平。
三是带动了农民增收。在增产增收方面,通过提高项目区农业综合生产能力,新增粮食生产能力18万公斤,亩均增收达50元;在降本节支增收方面,通过衬砌渠道等灌溉设施建设,项目区节地、节工、节水、节电明显,按平均每亩20元计算,每年可节本20万元;在土地流转得益增收方面,通过推进土地依法、自愿、有序流转,实行集约化、规模化经营,提高了土地的产出率,项目区农民每亩可增收100多元。
根据我区2010年—2020年农业综合开发高标准农田建设规划,到2020年,将新建高标准农田15.7万亩,累计达24.89万亩,占耕地面积比重的70%以上。为确保实现上述目标,我区将着力把握好以下几个关键环节:
一、把握基本原则
一是统筹规划、重点开发。科学制定高标准农田建设规划,认真安排实施年度建设内容,注重经济、生态、社会效益相结合。对重点区域和重点项目进行重点投资,做大做强农业主导特色产业和龙头企业。二是多元投入、立体开发。充分发挥国家财政资金的引导作用,积极引导信贷资金、民间资本投入高标准农田建设,注重调动农民群众的积极性和创造性,建立健全多元化投入机制。坚持水利措施、农业措施、林业措施、科技措施、管理措施相结合,全面提升建设水平。三是集中连片、规模开发。在规划区内围绕优势产业、重点区域,集中力量。在规划区内围绕优势产业重点区域,集中力量、重点投入、连片开发,确保高标准农田建设一片、成效一片、带动一片、致富一方。
二、突出建设重点
一是突出基础设施配套。针对丘陵地区水源相对不足的情况,挖塘浚库,节水灌溉,新建灌溉泵站和衬砌渠道;针对沿江、沿湖地区雨季易涝的情况,疏浚排水通道,增建排涝泵站;针对田间交通不畅的情况,新建田间道路,配套田间建筑物。二是突出土壤培肥改良。针对土壤板结、肥力不足的现状,通过施用农家肥、秸秆还田等措施,对土壤进行培肥改良,促进土壤微生物活动,提高土壤理化性能,增强地力。三是突出科技支撑能力。通过强化农民技术培训、建设新品种和新技术示范基地、开展值保专业服务等形式,推广优良品种和先进适用农业技术,进一步提高科学种田水平。四是突出合作组织建设。引导鼓励龙头企业、种养大户领办专业合作经济组织,增强对农户的辐射带动作用,提高农民组织化程度。
三、强化保障措施
一是组织保障。为抓好高标准农田示范工程项目建设,区政府成立了高标准农田示范工程建设领导小组,办公室设在区农业资源开发局,具体负责项目的规划、设计、管理、实施以及指导、检查、考核、验收等日常事务工作,统一管理调配人、财、物。各有关镇也相应建立专门的工作小组,并依据区总体规划,结合自身特点,制定具体实施方案。同时,强化考核激励,区政府每年与各项目镇签订农业综合开发目标责任状,明确任务和职责,为高标准农田建设提供有力的组织保障。
篇9
一、严格招标控制源头
就我镇今年正在实施的1.5万亩农业综合开发主体及追加工程为例,两项工程总投资额达3750万元,中标单位均为外地公司,资质均符合招标要求。但项目的实际中标人确是借用资质的本地个体“包工头”,持被借用资质单位的法人授权委托书,全程参与工程建设。虽然符合招标手续,但实际却他们却不具备承接工程的资质,为支付高额的借资质费用,对分包班组层层压价,小班组必须通过偷工减料才能确保盈利。在项目施工过程中,“五大员”不到位,业主单位除轻微的予以处罚,无其他抓手可管理中标单位。建议区招投标主管部门加强源头控制,明确对投标人注册地或以往业绩实施地点进行限制,尽量限制非南通企业进入本地市场。同时,还应加强打击力度。发现借用资质的,依据有关规定,首先出借资质证书允许他人以本企业的名义承揽工程的,处以罚款并一律取消其在通州的投标人资格。
二、加强培训充实队伍
乡镇作为高标准农田建设的业主单位,在工程的推进及质量管理上不能完全依赖监理单位。这就需要组建一支专业的队伍来参与工程管理,但目前基层最缺乏的就是其相关的年轻技术人员。所以要高度重视基层水利行业整体人力资源的开发。一是从水利站、机关、村居等抽调精干力量,组成专业队伍,参与工程建设,技术骨干做好工作经验的“传帮带”,鼓励年轻同志在一线历练,掌握专业知识,提高整体素质,以适应岗位需要,为专业人员的更新换代充实好后备力量。二是组织部门每年在招聘公务员时对于农田水利、水土保持、水资源管理、地质及地下水等方面的专业人才,适当向项目乡镇倾斜,同时镇组织部门严格按照专业分配到项目建设岗位,通过实践锻炼,结合理论知识,培养能承担起相应的工作专业人才。三是适当考虑返聘原岗位技术骨干,通过签订协议,明确工作职责,奖罚分明,为基层设施建设发挥余热。
篇10
为规范农村综合改革示范试点工作,建立健全奖励约束机制,提高财政资金使用效益,推动农村综合改革示范试点取得实效,根据《国务院农村综合改革工作小组关于开展农村综合改革示范试点工作的通知》(国农改[2012]12号)、《国务院农村综合改革工作小组关于2013年扩大农村综合改革示范试点的通知》(国农改[2013]15号)、《财政部关于印发〈农村综合改革示范试点中央财政奖励资金管理暂行办法〉的通知》(财预[2012]437号)等文件精神,我部制定了《农村综合改革示范试点考核评价试行办法》。现予印发,请各地高度重视,认真贯彻执行,切实做好试点各项工作。
附件:农村综合改革示范试点考核评价试行办法
财 政 部
2013年9月30日
农村综合改革示范试点考核评价试行办法
第一条 为扎实推动农村综合改革示范试点工作,规范各项试点工作管理制度,建立健全奖励约束机制,进一步深化农村综合改革,加快推进城乡发展一体化,制定本办法。
第二条 农村综合改革示范试点考核评价遵循定性考评与定量考评相结合,自我考评与抽查考评相结合,考核结果与激励机制相结合的原则。
第三条 按照分级管理、分级负责的要求,各试点省份对省以下试点开展情况进行考核评价。财政部对各试点省份试点工作开展情况进行考核评价,具体由国务院农村综合改革工作小组办公室组织实施。
第四条 考核评价包括以下内容:
(一)试点工作是否受到重视,工作机制是否健全,工作保障是否得力,宣传培训是否到位等;
(二)试点方案实施情况;
(三)资金预算安排和执行情况;
(四)各项管理制度是否健全,包括资金管理办法、项目管理办法、档案管理制度、监督检查与绩效考评制度等;
(五)试点工作成效,主要包括农民满意程度、试点经验可推广价值等。
(六)试点工作中是否存在违规违纪等问题,包括是否加重农民负担、截留挪用资金,是否出现群众上访等。
第五条 考核评价的依据:国家的法律法规及有关政策文件;国务院农村综合改革工作小组印发的政策文件;财政预算管理制度、国库管理制度以及财务管理办法、资金管理办法;各试点省份出台的有关政策文件。
第六条 考核评价以自然年度为周期,实行自评和抽查考评相结合。除特殊情况外,每年年初各试点省份对上一年度的试点工作全面总结并进行自我考评,自评报告(连同考核评分表)于3月31日前报送财政部(国务院农村综合改革工作小组办公室)。
第七条 抽查考评分为书面考评和实地考评。各试点省份对本省份的自评报告真实性负责。书面考评以各试点省份的自评报告为基础结合平时调研、宣传情况等进行评价;实地抽查以组成检查组形式赴有关省份开展检查,每年抽查比例不低于20%。
第八条 根据具体情况可以开展专家考评和农民满意度调查。专家可以从有关职能部门、高校科研院所、学者中遴选,也可以委托大学、科研院所等机构组织学生利用寒暑假开展农民满意度调查。
第九条 考评的组织实施。包括制定考评方案、下发考评通知、实地检查考核、量化考评结果等环节。
第十条 考评结果的应用。坚持奖优罚劣的原则,量化考核评价结果将作为分配中央财政奖励资金的参考因素。
第十一条 考评工作的纪律要求。应坚持实事求是和客观公正的原则,广泛征求基层干部群众的意见,全面真实地对试点工作进行考核评价。应自觉遵守中央八项规定,注重廉洁自律。
第十二条 各试点省份应参照本暂行办法,结合本地实际,研究制定切实可行的考核评价办法,并报财政部(国务院农村综合改革工作小组办公室)备案。
第十三条 本办法自2013年10月30日开始施行。
附:农村综合改革示范试点考核评价量化评分表(略)
国务院关于全国高标准农田建设总体规划的批复
国函〔2013〕111号
各省、自治区、直辖市人民政府,发展改革委、财政部、国土资源部、水利部、农业部、人民银行、质检总局、统计局、林业局:
发展改革委关于报请审批全国高标准农田建设总体规划的请示收悉。现批复如下:
一、原则同意《全国高标准农田建设总体规划》(以下简称《规划》),请认真组织实施。
二、《规划》实施要加强统筹规划,强化政策支持,加大投入力度,着力改善农田基础设施,着力规范建设标准,着力明确管护责任,着力推进农业发展方式转变,坚持不懈推进高标准农田建设,为保障农产品有效供给、提高农业综合生产能力奠定坚实基础。
三、通过实施《规划》,到2020年,建成旱涝保收的高标准农田8亿亩,亩均粮食综合生产能力提高100公斤以上,其中,“十二五”期间建成4亿亩;高标准农田集中连片,田块平整,配套水、电、路设施改善,耕地质量和地力等级提高,科技服务能力得到加强,生态修复能力得到提升。
四、各省(区、市)人民政府要加强组织领导,根据《规划》确定的目标和任务,抓紧制定本地区高标准农田建设规划,细化配套政策,并督促县级人民政府编制实施方案,确保建设任务落实到地块。要整合资金,集中投入,连片治理,强化项目建设管理和建后管护,提高资金使用效益。
五、发展改革委要会同有关部门,按照职责分工,密切配合,加强协作,不断完善相关标准和制度,做好相关规划间的衔接,对《规划》落实情况进行跟踪分析和督促评价,确保《规划》目标任务实现。