建筑工程保障措施范文
时间:2023-06-08 17:40:57
导语:如何才能写好一篇建筑工程保障措施,这就需要搜集整理更多的资料和文献,欢迎阅读由公务员之家整理的十篇范文,供你借鉴。
篇1
关键词:建筑;工程施工;质量;保障措施
Abstract: the engineering quality is the essence of the construction enterprise, and each building enterprise can in the fierce competition in the market the basic survival. A enterprise construction quality is good or bad, directly affect people's production and life, but also related to national economic stability.
Keywords: architecture; Engineering construction; Quality; Security measures
中图分类号:O213.1文献标识码:A 文章编号:
随着我国城市化进程的加快,城乡道路、 桥梁房屋等的不断升级改造,带动了中国建筑的高速发展 。大量的精品建筑不断的展现在人们面前,为城市的增添了许多靓丽的风景。 但在美丽的光环下,建筑企业存在的工程质量问题也不断的浮出水面,且出现越来越严重的趋势,工程质量问题不断,有些新建桥梁出现大的裂缝,刚建起来的高楼整体坍塌等重大事故严重影响到了人民群众的生命安全和社会的安定。工程质量是建筑企业的精髓,也是每一个建筑企业能在激烈的市场竞争中生存的根本。 一个企业施工质量的好坏,直接影响到人民群众的生产、 生活,也关系到国民经济的稳定。因此一个高质量的建筑工程,不仅关系到建筑企业的效益,也为人民群众提供了一个良好的舒心的环境,为社会的长治久安提供了坚实的基础反之则会劳民伤财,企业也难以立足在建筑行业中。 建筑企业应时刻敲醒警钟,提高自己的工程质量,组建一个高素质的施工队伍,一个施工队伍的好坏直接影响到此项工程的质量,由此在现代建筑企业施工中,应充分认识到施工质量的重要性,提高施工企业的管理水平,让建筑企业沿着良性的发展道路走下去,为社会建造优质工程。
一、影响建筑施工质量的主要因素
1、人为因素
人是施工过程的主体, 所以必须做好人的因素的控制。 在建筑工程中起主要作用的是领导者 、技术人员以及服务人员。 领导者在建筑工程施工过程中最重要的是领导者的素质, 领导者的素质越高,决策能力就越强 ,在施工过程中就会采取相应的质量规范, 施工组织质量检测和检查的能力。 技术人员的作用则体现在技术水平上,技术人员的水平,越高工程的技术含量也就越高,质量也就越好;其次一位好的技术人员,往往能够严格按照质量标准和操作规范来实施工程, 因此,能够避免一些由于疏忽而造成的工程质量问题 。而服务人员在建筑工程施工过程中的作用主要体现在服务意识上,好的服务人员有较强的质量观念, 在施工过程中会做好技术和生活两方面的服务。
2、材料因素
材料质量是工程质量的基础,材料质量不符合要求, 工程质量也就不可能符合标准, 所以加强材料的质量控制是提高工程质量的重要保证。据统计资料建筑工程中材料费用占总投资的70% 或更多。一些承包商在拿到工程后, 为谋取更多利益, 不按工程技术规范要求的品种、规格、技术参数等采购相应的成品或半成品,而使用不合格的假冒、伪劣产品及原材料, 给工程留下了质量隐患。有时,因为采购人员素质低下,对原材料质量不进行有效控制,或者有的企业没有完善的管理机制和约束机制, 都会造成此类现象的发生。
3、施工方案因素
施工方案因素主要是指施工方案考虑不周全, 没有结合工程实际,没有从技术、管理、工艺、组织、操作、经济等方面进行全面分析、 综合考虑,或是没有结合考虑施工现场条件、建筑结构形式 、施工工艺和方法、建筑技术经济等 ,导致进度缓慢,质量低下,投资增加的情况。其次,在施工方案中未合理选择机械的类型、 数量和参数,对机械进行错误操作也可能影响到工程的质量。
4、施工环境因素
环境因素对工程质量的影响具有复杂而多变的特点, 如气象条件变化万千,大风、暴雨、酷暑、严寒都能直接影响到工程的质量。在施工过程中工程人员必须考虑施工时的具体环境, 考虑环境可能对施工带来的不利因素, 及时做好防护措施, 确保工程的质量与进度。
二、建筑工程施工质量保障措施
1、完善建筑工程施工质量。管理体系现代建筑工程施工企业应根据工程实际情况工程施工、技术文件以及工艺要求,并结合自身技术水平构建健全的施工质量管理体系。在完善施工质量管理体系过程中,注重质量管理体系的科学性、适用性,保障管理体系能够对施工管理过程进行科学的控制与管理。避免生搬硬套其他企业或工程质量管理体系,影响质量管理工作在施工中的应用。一方面,对建筑工程施工的各环节出现的违法违规者要 “严肃查处,从严处理” ,必须依法降低相关责任单位的资质,后果严重的要吊销执照。对那些明显违法违规并造成工程质量隐患的结构工程师、建筑师,也必须对其执业资格作出严肃处理 。对一般的违法违规行为则按照相关法律法规加以处罚。另一方面对建设工程项目的每一重要环节,应采取终身负责制,并狠抓落实。 因此,要健全建筑施工工程项目的档案管理,建立健全质量管理制度,不但使质量管理有约束力,还可以使建筑工程施工质量逐步纳入法治轨道,这对加强施工质量管理,规范质量管理行为都起到了重要的作用。
2、提高建筑工程施工人员的素质。施工人员是整个建筑工程施工的主体,他们都在工程生产第一线,工程质量的好坏与他们本身的专业知识和素质高低息息相关。因此提高建筑工程施工人员的素质、规范施工安全生产的日常监理工作对建筑工程施工的质量尤为重要。现在的施工人员素质参差不齐,对施工质量的认识也不尽相同,那么就应该对进场的工人进行质量常识教育和管理技能培训,认真组织学习施工技术规范和施工质量守则,提高他们思想认识,增强质量意识和安全防范意识,并统一组织操作技术的摸底测试,经过教育培训掌握了应知应会技能,达到合格后持证上岗是十分必要的同时,也要规范施工管理秩序,杜绝施工人员违规操作这样才能使他们在施工过程中增强质量意识,确保工程质量。
3、施工材料的管理。 施工材料是建筑工程施工质量的基础,在施工成本支出中占有重要比重。 建筑工程施工企业应针对建筑工程施工材料对施工质量的影响,完善材料管理体系,明确材料入场检验、 复核、施工前检验工作的重要性。在进行材料采购中,应注重对供应商资质的审核 、对进场材料的检验,以符合设计要求的施工材料为基础,保障建筑工程施工质量。另外,为了减少施工材料存放对施工材料质量的影响,建筑工程施工企业还应以科学的规划,合理安排进场材 料数量,以减少存放过程对施工材料的影响。 同时注重存放管理工作,以避免存放过程影响施工材料质量。为了确保存放后建筑施工材料能够满足工程设计施工要求,建筑工程施工企业还应加强使用前的二次检验,以此为保障建筑工程施工质量奠定基础。
4、施工工艺参数、 施工技术控制。建筑工程施工工艺参数技术控制与管理对建筑工程施工质量有着重要的影响,是现代建筑工程施工质量控制过程中的关键因素建筑工程施工企业应在工程开工前对施工工艺、施工技术进行综合分析与论证,针对工艺技术要求与施工技术管理重点科学的设置施工质量控制点,并在施工过程中,通过现场技术人员质量管理人员的旁站与巡检对施工质量控制点进行监控,使建筑工程施工过程始终处于受控状态,确保工程的施工质量。
5、 施工设备管理与控制
建筑工程施工设备对工程施工质量有着重要的影响,工程施工企业必须加强对施工设备的管理与控制以此保障建筑工程的施工质量。在工程开工前,施工企业应以工程技术交底文件为基础对工 程施工过程进行分析与讨论,以此为保障建筑工程施工质量奠定基础。 针对建筑工程施工设备养护工作对工程施工质量的影响,建筑工程施工企业还应加强对设备养护管理工作的科学规划。
总之,建筑工程的质量好坏,不但关系到建筑工程本身的安全性、实用性和耐久性,更关系到国民经济的持续发展和人民群众生产、生活的安全稳定,建筑施工企业要深刻认识到建筑工程施工质量的重要性,牢固树立“ 质量第一”的思想,不断地从管理上、 制度上加以规范和完善,确保建筑工程质量,最大限度地避免质量问题。把我们建造的每一项工程都做成经得起时间考验的精品,为社会创造高品质的建筑工程。
篇2
关键词:建筑;装饰装修;结构安全
合理的住宅装修,可以美化建筑空间,改善建筑使用功能和保护建筑主体结构;但是,由于对建筑装修市场的管理力度不够,加上装饰施工人员缺乏基本的建筑结构知识和装修安全知识,造成施工不规范、偷工减料、粗制滥造、设计水平低下,不仅影响了使用,更严重的是给家庭留下了隐患,有的已造成危害,使一些新居变成了“危房”。有关资料表明:在北京、上海等地进行的抽查中,属破坏性装修的占总数的20~50%。对部分省市地区的建筑装饰工程进行调查的结果,合格率仅为55%。
1建筑装修中存在的安全使用问题
1.1对楼板的破坏
目前,住宅建筑中多使用预应力空心板,在做吊顶和木地板时,为了固定吊杆和龙骨,或者是为了安装吊扇、灯具等,在楼板上任意凿孔、打洞,有的甚至将板内的受力钢筋打断,严重影响了楼板的承载能力,同时也加大了楼板的弯曲变形。打洞时的强烈振动使楼板表面的混凝土保护层开裂,严重影响了楼板的使用寿命。
1.2拆除墙体、承重墙开洞
为了便于采光或增加使用面积,有的住房在装修时将卧室、厨房与阳台间的墙体拆除,或将某墙拆掉换成木制柜子;在厨房间的承重墙内开洞,用来放置消毒柜、微波炉和柜子等;在卫生间的承重墙内开洞,用来放置洗漱用品;将坐便器移位放入墙内;门洞移位等。
1.3在悬挑阳台拦板上安装阳台封闭窗或砌墙
有的住户在阳台拦板上砌墙,或者安装阳台封闭窗,改做厨房、居室等,把贮藏柜、煤气灶(罐)、水池等重物移到阳台上,还有的在居室内任意砌墙,所有这些都增加了阳台或者楼板上的局部荷载,严重影响了建筑物的结构安全性。为了解决排水问题,在阳台地板上钻孔穿管,则破坏了阳台的整体性,也影响了阳台结构安全的可靠性。
1.4装修施工中对建筑结构的损坏
在室内装修中较常见情况有:拆除部分承重墙、窗台墙、纵墙;在承重梁上凿打较深的电缆槽和在梁、柱上打洞。在梁板增加额外荷载。如在室内装修时选择较重的花岗岩、大理石等石材地板,作为地面铺装材料,叠加很厚的水泥砂浆层,增加了楼板不应有荷载。特别是在楼板新切墙体,无疑是埋下了安全隐患。装修施工中,在原楼板、梁面上随意射钉、凿洞,破坏了梁板结构;在钢筋混凝土顶棚上随意凿钻打洞,凿出板内钢筋以固定天棚、吊挂风扇和灯具等较重物品,甚至切断板内的受力钢筋。这些做法均严重地破坏了结构构件的承载能力。承重墙、梁、柱都是重要的承重结构构件,它被部分拆除,削弱或增加额外荷载后都会改变原有结构体系的应力状态,可能形成结构体系中的薄弱点,影响建筑的安全度和耐久性,地震作用时就会从那里开始破坏。严重时甚至会引起建筑部分或整体的坍塌。
1.5楼面上加载的危害
楼面装修时,如卧室等采用木格栅单层木地板,则地面净高至少增加55mm。客厅等采用大理石或花岗岩等作面层,这样客厅楼面荷载增加1.26kN/m2。若楼层采用板面允许外加荷载2.5kN/m2的预应力混凝土圆孔板,扣除活载1.5kN/m2,则客厅楼面超载1.26kN/m2。木地面若采用木搁栅双层木地板时,楼面净高增加更大,客厅基层超载更多。以一块4m×4m×0.1m四边固定的现浇钢筋混凝土板为例,在原楼面加厚60mm混凝土,即增加1.5kN/m2的荷载,使板跨中的挠度和弯矩增加30%以上;而在板中砌一道120mm厚的砖墙跨中挠度将增加120%以上,跨中垂直于加墙方向的弯矩将增大140%,平行于墙体方向的弯矩增加100%以上,支座弯矩增加50%,楼板将因原设计的承载力不足出现挠度过大、开裂;钢筋变形甚至屈服;由于裂缝造成钢筋锈蚀,降低结构的强度甚至影响结构的耐久性。
1.6擅自改变建筑使用功能
建筑是按使用功能设计的,有预定的使用荷载,房间的楼板、梁、柱和墙都只具有一定的承载能力,如果超负荷使用,就会造成安全隐患,难免不出安全事故的。例如,把阳台改为厨房就增加了较大的荷载。
2建筑结构体系中不可随意改动的部位
2.1墙体
承重墙:指在砖混结构中支撑着上部楼层重量的墙体。在抗震设防地区,承重墙是经过竖向静力和地震效应动力作用结构计算确定的,如果承重墙受损,就会影响建筑的安全性。一般承重墙是砖混结构的建筑物中非常重要的结构构件,凡是承重墙一律不能拆除、部分拆除或开门开窗。现浇楼板的建筑纵横墙都是承重墙,厚度18cm及其以上的砖墙一般是承重墙。
非承重墙:指在砖混结构中不承受上部楼层重量,只承受自身重量的墙体。它只起建筑分隔、围护,形成整体作用,同时还有承受水平地震荷载和风力的作用。
2.2梁、柱、板
在框架结构中,柱支撑梁,梁支撑板,经过组合构成了建筑结构的整个结构体系。梁板、柱均依据竖向荷载效应和水平地震荷载效应、风荷载效应计算确定;在砖混结构中梁板也是同等重要的结构构件。伤及这些构件,轻则带来安全隐患,重则造成安全事故。
2.3防水层
厨房和厕所地面都有防水层,如果破坏了,楼下就会变成水帘洞。所以在装修更换地面材料时,一定注意不要破坏防水层。如受到破坏重新修补后,一定要做(24小时渗水实验),即在厨房或卫生间地面灌水,如果24小时后不渗漏方算合格。
3主体结构装修的安全保障措施
3.1主体结构安全保障技术的处置原则
①主体结构类型如为墙体承重为主,原则上不得拆除。确有需要拆除的墙体(非承重墙)、应该全面评估结构刚度中心与质心的改变、非承重墙所在方向结构抗侧刚度的变化对结构抗震性能的影响。
②大型装饰构件、重质墙体或重型设备会使楼盖结构变形过大,甚至破坏。应采用专门设计的架越结构系统,将荷载转移到加强过的竖向承重结构上。
③轻质墙体一般不适合承重。墙体应采取措施与周边结构拉接,保证其稳定性。
④严格将装修所增加的荷载控制在结构允许承载力范围内,严禁超载。
⑤采取适当加固措施,保证主体结构有足够的抵抗承载力。
3.2主体结构的安全保障技术措施
⑴楼盖结构
①楼盖上一般不能开槽,非开不可的沟槽,其深度只能凿到楼板面上的垫层。两块楼板之间的拼缱处可开孔。对于较大的洞口,在开洞处一定要采用加同措施。
②需改变用途的房间,必须验算楼板、梁、柱等结构构件的承受能力,根据楼面荷载大小的变化考虑是否需要采取加固措施。
③风道或上下水管道必须穿梁时,在梁跨的中部通过时,一般在深度的中部预留孔洞;在梁端部通过时,对开洞部位必须进行抗剪能力验算,并严格控制孔洞尺寸大小。
⑵墙体结构
墙体上开槽开洞,会改变其受力状态。必须验算墙体的承受能力和稳定性,保证墙体的稳定可靠性。
4装饰构件结构安全技术措施
4.1装饰构件结构安全技术处原则与措施
①装饰构件的组成有时比较复杂结构层次不清晰。必须明确构件结构层次, 采用简化截面及模型, 按结构层次分析计算、设计复核。
②应依据满足装饰效果和总造价最低原则, 综合考虑面板的分格尺寸、骨架的断面大小、布方式与间距。
③面板与骨架之间应采用牢固可靠的连接方式, 必要时通过计算确定。
④采用可靠的结构形式与结构措施, 保证骨架结构的整体稳定, 如在骨架内部架设联系杆件、剪刀撑等, 以形成稳固的骨架。
⑤计算简图与实际工程有差异时, 应采取适当的构造措施使两者尽可能吻合。
4.2常见装饰构件的结构安全技术
⑴吊顶
吊顶的龙骨型号须根据荷重、吊点间距综合确定。吊顶龙骨的间距须结合饰面板的厚度、饰面板材料的特性综合确定。吊杆与龙骨连接的应牢固可靠。上人吊顶内的走道必须单独设吊杆、走道龙骨和铺板。因安装格栅式照明灯具等设施被切断的吊顶龙骨必须采用加固措施。布在吊顶内的风道, 必须单独设吊杆。
⑵隔墙、隔断
立筋式隔墙、隔断的骨架宜选用型钢骨架、轻钢骨架, 砌块式隔端、隔断应加强其块材之间的连接、保证基座刚度。应对隔姗、隔断的强度、刚度、侧向稳定性进行必要验算并加强隔堵、隔断的沿地、沿顶、侧向与主体结构连接。
⑶幕墙、采光顶
根据计算选用幕墙、采光顶的铝合金骨架、饰面板,并进行承载能力、刚度和稳定性的验算。对骨架与饰面板之间的连接、骨架连接节点进行承载能力验算。例如隐框玻璃幕墙的彼面玻璃和铝合金骨架, 以及它们之间连接固定的胶缝宽度。在沿海强风区的幕墙等饰面必须重点考虑风力影响, 保证能抵抗强风所引起的吸力及压力。
篇3
【关键词】建筑节能;工程;保障措施
我国的建筑节能工作面临着非常艰巨的任务,在建筑工程中应该积极应用建筑节能技术,进一步降低建筑行业的能源消耗和环境污染,促进我国节约型社会的建设,打造低碳型的建筑行业,实现我国国民经济的可持续发展。
1 建筑节能的意义
建筑在使用的过程中会产生相应的能耗,主要是用于热水供应、给排水、电梯、家用电器、照明、空调、通风、供暖等等,这些能耗被统称为建筑能耗。在经济发展的过程中,能源消耗是一个非常重要的问题。根据调查发现,我国社会能源消耗量的30%以上都是建筑能耗,房屋建筑材料的生产能耗也超过了10%[1]。尽管我国大力推广节能建筑,然而我国绝大部分建筑仍然是高耗能建筑,无论是在采暖空调系统还是在建筑围护结构上,都要耗费较大的能量。我国正处于经济发展迅速的时期,每年的新建建筑已经达到了20亿平方米,其中绝大部分都是高能耗建筑,对于国民经济的可持续发展造成了严重的阻碍。因此,必须大力推广建筑节能技术,才能降低我国建筑行业的能源消耗,促进我国建筑行业的健康发展。
2 工程实践中对建筑节能技术的应用
2.1在建筑规划和设计方面的节能措施
①在建筑选址方面应用建筑节能技术
选择建筑地址是必须综合周围环境条件、当地地形、水质、地质、气候等多方面的因素。在建筑选址方面使用建筑节能技术,主要是需要在建筑设计中保持合适的微气候环境,不要对整体生态环境的平衡造成破坏。
②外部环境的设计。在确定建筑位置之后就要对其为微气候特征研究,微气候特征可以通过合理的外部环境设计得到改善,将合适的建筑节能环境创造出来。例如为了达到净化空气、遮挡风沙的目的,可以在建筑周围布置相应的植被和树木,植被和树木还能够起到降噪和遮阳的效果。
③设计建筑体型,进行合理的设计规划。为了适应恶劣的微气候环境,必须对建筑体型进行设计,做好建筑规划工作。主要是确定建筑物的朝向、建筑的日照、建筑形体的组合、建筑体型、建筑整体体量等等。这样一来,可以对建筑师环境进行充分的利用,还对建筑室内微环境进行改善,通过合理分隔建筑内部空间,合理的设计建筑各部件的结构构造,来达到改善室内微环境的目的[2]。
2.2推广建筑围护结构节能
采用技术手段使建筑围护结构的保温隔热性能提高是一种有效的建筑节能手段。建筑性能会受到围护结构形式和建筑造型的影响,这种影响不仅包括建筑的自然通风状况和外部环境与建筑物的换热量,也会影响建筑的自然采光水平。门窗、屋面和外墙都属于建筑的围护结构,在建筑围护结构中应用新型材料,保障建筑物的通风、透光和隔热要求的同时能够对室内的物理环境进行维护,从而达到节能降耗的目的。通过使用硬泡聚氨酯、挤塑聚苯乙烯泡沫板、模塑聚苯乙烯泡沫板等有机保温材料,能够提高墙体的保温性能,并且形成复合墙体。
建筑结构面积的1/3都是门窗面积,建筑结构热损失的一半都是门窗能耗,因此建筑围护结构热工性的薄弱环节就是门窗,如果能够对窗墙比进行控制,并且使窗户的保温隔热性能得到提高,则能够使建筑护结构节能指标得到提高。设计人员要尽量减少玻璃材料的使用,在对建筑的通风和采光及保障的前提下,尽量对窗墙比进行控制,使室外窗传递的热量减少。与此同时,还可以积极推广新型节能门窗和节能新型玻璃材料,例如新型太阳能遮阳系统,或者双层中空玻璃、镀膜技术等等,从而使传热量减少,对建筑能耗进行有效的控制。
2.3节约能耗设备和系统的能耗
电梯设备、热水供应系统、照明系统、空调系统是建筑的主要能耗设备和系统,其中民用建筑中主要的能耗系统是照明系统和空调系统,特别是空调系统的能源消耗量很大。因此要实现节能降耗就要对空调系统进行控制。使用节能设备是一种很好的节能方法,例如使用能效比更高的采暖设备和空调等等。与此同时,还可以进行建筑能源的梯级应用,并且应用能源回收技术。对调节系统进行控制,达到节能降耗的目的。
2.4积极利用新能源
在建筑中可以广泛地使用可再生能源,包括海洋能、地热能、水能、风能、太阳能等,其中以太阳能用得最为广泛。为了实现可持续发展,积极开发利用太阳能是一个很好的策略。
3 建筑节能技术在工程施工中的保障措施
为了保障建筑节能效果的实现,还应该在工程施工中实施一些保障措施,从而使建筑节能技术能够充分发挥应有的作用。
如果建筑的内外墙体使用双排孔砼小型砌块围护结构,并且使用了新型节能材料,就应该保障竖向、水平灰缝的饱满度达到施工的要求,按照施工图纸对圈梁、构造柱、墙体拉结筋的施工进行规范,特别是避免空心砖墙体的裂缝问题[3]。
对于内外墙的抹灰,要避免一遍成活,避免抹灰出现裂缝,保障抹灰的平整度和垂直度。
如果建筑使用了节能型断热铝合金门窗,此时要保障正确的技术参数,根据图纸设计的要求来进行施工。按照《墙体节能建筑构造》节点来对门窗洞口处进行节能施工。按照《屋面节能建筑构造》来对屋顶女儿墙进行节能施工。要实用高温保温材料来密封电气、风管、管道等安装工程的过墙洞口,避免过墙洞口出现裂缝,影响电气、风管、管道等安装工程的密封性,造成能量的流失。
4 结语
我国正处于经济飞速发展的时期,而能源短缺又是二十一世纪人类发展中面临的一个普遍问题,制约着人类的继续发展。我国要实行可持续发展战略,就必须在建筑工程中积极实践和应用建筑节能技术,降低建筑行业的能源消耗,提高建筑节能的效率,只有这样才能有效的推动国民经济的可持续发展。
参考文献
[1]余晓平,付祥钊.面向产业需求的建筑节能工程人才培养探讨[J].高等建筑教育. 2012(06).
篇4
关键词:建筑工程;施工进度;管理
中图分类号:TU71 文献标识码:A 文章编号:
工程项目进度的烤制和管理工作,其最终目的就是对工期的控制,和工程的质量管理、成本管理一样,是工程项目施工管理的重要内容之一,是保障工程按时完成、实现工程成本节约的重要措施。
建筑工程进度的影响因素
资金因素
对于建筑工程来说,资金是保证整个工程施工进度的基础性的因素。只有资金充沛且运转正常,才能够提供给工程项目充足的施工建筑材料、技艺精湛且经验丰富的建设团队和先进的施工设备,使得整个工程项目的施工进度得到保证。然而在实际的施工项目进展中,由于业主或者施工方的原因,经常造成施工的资金无法及时到位的现象,或者由于通货膨胀、汇率浮动等因素,致使工程的预算不能满足当前的施工需求。这些资金方面的问题,都会对建筑工程项目的进度造成直接的影响。
技术因素
一般来说,不同的建筑工程对于施工技术有着不同的要求,因此在建筑工程的具体施工之前,应该对整个工程的要求和技术难度进行全面评估,为建筑工程进度的推动提供基础性的技术支持,使得工程进度能够正常开展。然而在具体的工程施工中,由于对项目的实现条件和特点没有足够的认识,致使工程相关人员对技术要求估计的过低,对施工设计和实际施工中的技术性问题没有进行周全的考虑,造成施工现场的部分建筑施工由于技术原因而不能有效地开展,对整个工程进度造成影响。
人为因素
所谓的人为因素,指的是工程的各参与方的人员在工作中发生的失误。一般来说,在建筑工程的施工过程之中,施工图纸设计的不完善或者存在的缺陷和错误、设计部门的失误或者设计考虑不全面、施工单位在施工分包企业的选择中发生失误、建委、质监部门在工程审批工作中的推诿和拖延等,这些人为因素导致的工作失误,都有可能对施工工期造成延误,使工程的正常进度造成影响。
其他因素
在工程的进展过程中,除了资金、技术和人为等方面的因素之外,施工中的设备因素、市场因素、材料因素、环境因素、气候因素等其它因素也会对施工造成影响,致使整个工程的进度发生拖延。对于建筑工程来说,施工进度的影响因素是多种多样的,其中某些因素并非施工单位可控的,如市场因素、环境因素等,然而在大多数的情况之下,工程的施工进度还是能够通过适当的管理策略的使用,来有效地进行保障。
当前工程进度管理中存在的问题
忽视进度计划
在很多建筑工程中,尤其是规模较小的建筑工程,施工的管理者对于施工进度计划的重视程度不够,往往产生进度计划可有可无的思想。然而建筑工程有着工期长、规模较大、施工环节较多的特点,因此其中意外情况也较多,如果没有完善的进度计划来进行指导,就会使现场的施工陷入无序的状态,导致各种拖延进度问题的出现。
制约因素多、管理难以到位
在工程项目的实施过程之中,可能对其进度造成影响的因素有很多,如管理水平、资金、物资的供给、设计的变更、劳动力需求等。工程的承包商没有对这些问题采取有效的措施,项目的成员之间缺乏有效的激励、考核和监督的机制,没有明确的目标分工,进度滞后时现场没有明确的负责人,各个部门之间相互扯皮的现象严重,以致工程的进度目标始终不能如期完成。
项目工程进度管理策略
技术保障措施
施工方案的保障
施工单位应该制定详细的、可操作性和针对性较强的施工方案,然后依照方案来进行施工计划的编制,施工方案应该全面覆盖整个工程的施工,要做到内容详细、图文并茂。施工单位应该组织施工的管理层和操作人员对施工方案进行认真的学习,实现对施工工艺和质量标准的掌握和熟练应用。
施工技术的保障
施工单位应该在施工中使用发展较为成熟的新建筑技术,通过新技术的应用来实现工序施工周期的缩短。比如在工程的混凝土施工中,采用混凝土泵送技术,能够解决混凝土的垂直、水平运输问题,而且能够大大加快混凝土构件的浇筑速度,进而提高施工现场的生产率和整体的工程速度。
工序管理措施
合理的施工工艺选用
选用合理、先进的施工工艺,能够有效地缩短施工的周期,保证施工工序的科学,利用施工中的时差,对某些工序的施工作业时间进行缩短。为了能够最大限度地对某些施工关键线路的潜力进行挖掘,各个施工工序应该做到穿插紧凑,尽量压缩工作施工的时间。在结构施工阶段,应该做到安装预埋随时插入,不造成主导工序时间的占用,在装修阶段,应该在各个工种之间设立联合验收的制度,确保充分利用施工的时间。同时,还应该保证各个施工专业之间有良好的配合,避免相互破坏干扰,影响到施工的进行,造成工序施工时间的延长。
使用流水施工
多项工程实例证明,流水施工的施工方式能够达到工程质量高、工期短、工程投入少的效益。流水施工的组织方法其基本思路是使用先进的施工工艺和施工技术,对施工工序在某一个流水段之上的持续时间进行调整和压缩,以实现各个工序的均衡流水施工。在进行流水施工时,施工单位应该做好施工调度工作,使各个施工工序紧密衔接。
资源调配措施
施工单位应该按照计划来准备施工作业的条件,对人力、财力、物力资源根据施工需要来进行合理的调度分配,保证工程的各个环节能够有序、紧凑地衔接开展。施工中应该使用先进的施工设备和施工材料,根据工程的工作量、工期、平面设计尺寸、施工的需要等来选用施工的工具和机械设备等。材料和施工配件应该做到及时供应,并且按照施工规范对进场的材料进行严格的检验,避免因为材料的质量问题造成施工进度的拖延。
组织保障措施
建立施工进度控制体系
建立有效的进度控制体系,是施工进度得到保障的前提。施工单位应该组建进度控制系统,建立整套检查、贯彻、调整的程序,对工程的进展进行实时的监督,对工程量、设备和材料的使用、人工等因素进行分析统计,并且做好统计表的编制工作,制定进度控制管理制度,落实进度的控制措施。
定期进行质量分析
施工单位应该定期召开质量分析会,对施工中的质量、进度等问题做好预控和解决,为接下来的生产做好准备。应该建立三级计划来对工程进度进行控制和安排,让各个专业队伍能够按照施工总体计划来进行施工的调度。
建立高质量的施工队伍
素质高、信誉良好的施工队伍是工程能够按时完成的条件之一。在项目施工中引进竞争的机制,选择专业素质和施工经验较高的施工队伍,在施工中使用经济赏罚的方法,是经济和施工挂钩,才能真正实现对施工进度的控制。
结语:
在建筑工程项目中如何进行有效的进度管理控制,确保工程按期完成、实现建筑企业经济和社会效益的最大化,真正体现企业在施工管理方面的水平。以此企业在工程的开展中应该不断进行经验的积累,采取科学的措施来对项目进度进行管理,使得工程项目能够按时完成,为项目效益的产生创造有利的条件。
参考文献:
[1] 吕高强. 浅析建筑工程中施工进度的管理与控制[J]. 经营管理者, 2011(19) .
[2] 丁广师. 浅议工程施工进度管理[J]. 中小企业管理与科技(下旬刊), 2011(02) .
[3] 拜贺,刘雪冰. 浅谈工程施工进度管理中存在的问题与解决途径[J]. 科技致富向导, 2011(26) .
篇5
【关键词】建筑工程;安全管理;保障措施
1 引言
随着我国经济的迅猛发展,城镇建设步伐不断加速推进。建筑工程安全施工管理逐渐成为了建筑工程施工中举足轻重的一环;施工工程建设的大规模化成为当前我国城市化的显著特征。近年来,建筑施工凸显安全问题,施工现场事故频出,建筑从业人员的死伤率居高不下,严重阻碍了建筑行业顺利地发展并严重威胁着建筑行业人员的生命财产安全。减少甚至杜绝建筑施工安全事故的发生,必须从施工安全管理存在的问题出发,通过对问题的分析,才能更好地去解决这些问题,才能够给建筑安全施工提供一个保障。
2 建筑施工安全管理所存在的问题
建筑施工安全管理问题是多元化、多层次的问题,既有政府管理部门的原因,也有具体到从业人员自身的问题,这些问题相互交织进而使得建筑施工管理出现各种各样的漏洞。
2.1 政府监管力度不够
在建筑施工方面,我国针对建筑施工方面的执法监察一般是事故发生后才引起相关部门的重视和采取补救措施。随着建筑开工面积的增加,建筑市场准入较多,但与安全事故挂钩的市场退出机制很少,一些多次出现安全事故的施工企业仍活跃在建筑市场上,对于施工安全也是巨大的隐患。当今,建筑事故频发,有关部门所给出的措施是通过管理手段去减少事故发生,从根本上遏制和管理建筑施工的安全问题。政府在建筑施工管理工作中必须起到调控作用,也就是必须通过政府手段,给予建筑施工以宏观上的管理和监督。
2.2建筑工程安全施工管理人员配置不全,安全施工管理机构形同虚设
当前,我国有很多施工现场仍然只是配备了项目经理以及施工员等寥寥数人来进行建筑工程施工的现场管理,并且人不在岗或一人身兼数职的现象非常严重,进而导致了管理人员的大部分精力都投入到工程的施工质量、施工进度、施工造价等方面的管理当中。而对于施工现场的安全施工管理往往没有完整、独立的管理机构,责任也不是很明确,甚至部分施工现场根本就没有配备专职的安全员。
2.3 建筑市场活动不规范,工程层层外包,导致施工安全事故。
工程项目施工阶段,有些承包商为了增加利润、降低成本,将违法分包、工程转包,致使最终进场的某些施工单位无论在资质还是技能方面远不能达到安全施工的资质。一些施工单位为了节约成本,施工过程中不按强制性标准执行,甚至以次充好、偷工减料,加之监理单位没有履行监理职责,发现问题不及时纠正,给安全施工埋下了事故的隐患,这也凸显出建筑施工管理方面的巨大漏洞。
2.4 建筑工程施工的安全防护随意,缺乏规范化
当前我国许多建筑工程施工现场的安全防护十分随意,达不到规范化的要求。其主要表现为施工现场的各项安全设施和防护设备不到位,各种施工机械的安全防护不规范,施工临时用电搭接混乱,且缺少基本的安全警示标牌和标志等。
2.5 建筑施工环境恶劣
在建筑施工管理方面,因为环境的恶劣并不是管理者本身决定的而是其行业本身来决定的,建筑施工环境并不能作为特别重要的一点。但由于在建筑施工安全管理存在问题,这一点是不能被忽略的。因此,行业本身所处的劣势更能彰显安全管理方面的问题。保护设施不完整,保障制度不健全,这些在很大程度上都可以归结到建筑施工环境上,如何更好的保护从业人员的人身安全,应该在这外因上给出合理的管理措施和管理手段。
2.6 从业人员素质较低,安全意识薄弱
在建筑施工行业中,不得不承认从业人员的业务素质相对其他行业来说确实很低。业务素质低下使得部分从业人员在工作过程中对于具体业务的操作甚至细节的把握并不熟悉,因此安全事故就容易发生。当事故发生之后,对于事故的及时处理方面,业务素质不过关则会导致其对事故处理不及时,损失更大。在大部分建筑从业人员中,对于安全问题并没有过多考虑,对于安全隐患很容易忽略,进而造成了安全事故。其实对于这一点在建筑施工管理中是一个非常大的问题,更多的应该是在每天的工作中潜移默化养成的。
3 建筑施工安全管理应对措施
3.1 完善政府职能,加强监管力度
在建筑施工管理工作中,政府必须转变角色,重新定位,发挥自己的职能,运用调控手段,整合建筑施工市场,加强监管力度。在具体工作中,各级政府应该发挥各自的功能,建立建筑施工管理机构,健全各种管理制度。调整建筑施工市场的市场结构,加大对市场的整合力度,稳定秩序。政府应该建立健全各项保障制度来保障从业人员的人身财产安全,在对建筑单位的资质审查方面要从严而定,在事故发生之后的处理一定要彻查到底。
3.2 加强培训,提高从业人员的素质
从业人员素质问题一直是建筑施工安全管理工作中的一个重要但被忽略的问题。而从业人员的素质不仅关系到建筑施工的安全,而且对于建筑的施工质量和进度都有很大的影响。因此,加强培训,提高从业人员素质是改进和解决建筑施工安全问题的重要方面。只有从业人员的素质得到提高,建筑施工管理工作才是落实到实处的表现。
3.3 加大施工安全宣传力度,完整安全保护措施
篇6
关键字:外脚手架施工;技术措施;保障措施
Abstract: with the development of economic growth, China's construction engineering business also rapid development. In recent years in the construction project construction process, because of scaffold and tall template collapsed in the quality and safety of accident frequency, to construction construction personnel life, property brought huge losses, the architecture engineering construction scaffolding, discussed the technology can reduce the scaffolding, improper technical measures to bring the security hidden danger, to reduce the construction safety accident is of great significance. At the same time, the use of advanced scaffolding technology can improve the construction engineering construction efficiency, better security construction safety, save the investment of the construction cost, driving the tall building construction technology development.
Key words: the scaffold construction; Technical measures; Security measures
中图分类号:TU74 文献标识码:A文章编号:
外脚手架是建、构筑物在进行施工组装阶段的临时作业和必须的外部防护体系,脚手架搭设施工时,因脚手架搭设材料、技术措施不当等极易形成建筑工程施工的外部支护结构和空间模板的大规模垮塌,危及建筑工程施工人员的生命安全,造成建筑质量、安全事故,因此外脚手架搭设施工时应严格符合技术规范要求。
一、建筑工程外脚手架施工技术措施
脚手架是为建筑施工或安装施工而搭设的上料、堆料以及施工作业用的临时结构。
1、脚手架的作用。
要保证作业连续性的施工。
能满足施工操作所需的运料和堆料,并方便操作。
对高处作业人员能起防护作用,以确保施工人员的人身安全。
使操作不致影响工效和产品的质量。
可多层作业,交叉流水作业和多工种作业。
2、脚手架的基本要求。
(1)要有足够的牢固性和稳固性,保证在施工期间对所规定的荷载在气候条件下不变形、不摇晃、不倾斜 ,确保作业人员的人身安全。
(2)要有足够的面积满足堆料、运输、操作和行走的要求。
(3)构造简单、搭设、拆除和搬运要方便,使用要安全,并能满足多次周转使用。
(4)因地制宜,就地取材,量材施用,尽量节约用料。
按搭设材料分为木脚手架、钢管脚手架和软梯等。按脚手架的施工性质分为建筑脚手架和安装脚手架。目前,高层建筑施工中较为常用的外脚手架有落地式脚手架(双排架、单排架)、悬挑式脚手架、整体提升脚手架等形式。其中悬挑式脚手架主要有a、b、c三种,如下图所示。建筑工程施工作业时应结合建筑物自身特点,选择适合本项目特点的布置形式方式。
悬挑梁式悬挑三角桁架外伸支挑式
悬挑式脚手架的布置形式
当不考虑风荷载时,采用单立管的敞开式、全封闭和半封闭的脚手架可搭设高度按照下式计算:
其中NG2K —— 构配件自重标准值产生的轴向力
NQ —— 活荷载标准值,NQ = 2.400kN;
gk —— 每米立杆承受的结构自重标准值脚手架搭设高度 Hs等于或大于26米,按照下式调整且不超过50米:
当考虑风荷载时,采用单立管的敞开式、全封闭和半封闭的脚手架可搭设高度按照下式计算:
其中NG2K —— 构配件自重标准值产生的轴向力
NQ —— 活荷载标准值
gk —— 每米立杆承受的结构自重标准值
Mwk —— 计算立杆段由风荷载标准值产生的弯矩
脚手架搭设高度 Hs等于或大于26米,按照下式调整且不超过50米:
在高层建筑施工中,脚手架的搭设高度应根据计算求出,当建筑高度大于计算高度时,应分段搭设,计算高度内搭设落地式脚手架,计算高度以外可根据高层实际情况设置悬挑式脚手架,这样提高了脚手架的周转使用率,节省了建筑施工的成本投入,同时提高了生产效率。
篇7
关键字:施工现场;工程;质量控制;探究
施工现场质量控制作为施工中的重要环节,对于保障工程的安全施工、员工的生命安全至关重要,在现场施工中要注意很多的细节问题,以使工程安全顺利进展。在控制过程中是什么因素影响着控制的质量呢?我们应该采取什么样的改善措施以保证施工的质量?下面对现场施工应注意的细节问题进行深刻的剖析。
一、建筑工程施工现场质量控制的主要内容
建筑工程施工现场的质量控制事关整个施工过程的安全问题和整个工程的最终质量问题,只有严格的控制好施工过程各个环节的质量才能保证工程顺利高质量的完成。施工现场的质量问题不仅包括施工前施工计划、施工人员安排以及工程的成本预算,施工过程的质量监管、人员安全管理和过程中的成本控制。还包括和建筑工程相关的文明施工等的管理项目,具体可以概括为一下几个方面:
(1)严格按照施工方案进行施工,确保施工前的常规准备工作和施工过程中的工程需求都能得到满足。(2)充分做好准备工作,在施工前召集各主要负责人进行图纸、方案、人员、资金、施工组织结构等的审核,确保工程开展顺利。(3)做好工程的组织计划,确定好外包与非外包项目资金及人员工期的安排。(4)施工过程中搞好各项目前后工程间的信息传输及控制管理,确保整个工程能够在最优状态下完成。(5)做好工程竣工前的验收准备工作,顺利完成工程的验收和后期保修工作。
二、建筑工程施工现场质量控制的制约因子
建筑工程施工现场的施工质量跟很多的因素有着关系,这包括外界环境因素,施工人员的素质,施工的技术手段和机械的可靠性等,每一个因素都对施工的质量有着这样或者那样的影响,现在就让我们深入的分析。
1.施工的环境因素
建筑工程施工过程的质量受到环境的影响很大,这些环境因素包裹施工过程的气候环境因素、建筑物所处的地理环境、施工作业的周边环境等。这些环境因素都影响着施工的过程和施工的质量控制。
2.施工人员因素
施工的人员因素不仅包括管理人员安全意识、对安全隐患的洞察能力、管理水平,而且还包括直接施工人员的技术水平、对于施工安全的责任感以及遇到问题及时解决及时和领导汇报的意识。现在很多建筑工程引发的安全和质量问题,大多都是由于现场的管理者和直接施工人员缺乏安全意识、没有责任感。
3.建筑工艺因素
建筑的工艺就是在施工过程中采取什么样的工艺流程、工艺设计以及实施的方法和监测手段。建筑工艺流程设计的是否合理、工艺设计是否遵循美学和力学的原来都影响这施工过程的质量控制。
4.施工机械设备因素
施工过程的机械设备直接影响着施工过程的工程质量,这些设备包括施工该过程的主体工艺设备和各类配套设施及施工场地的各种载举重的机器设备。
5.施工材料因素
材料是组成整个建筑物的最基本的部分,材料的质量、规格的标准程度等都影响这工程的质量,保证工程质量的第一步就是要保证采用合格的施工材料。
三、建筑工程施工现场质量控制的保障措施
1.优化施工环境
施工的环境对于工程的质量具有相当大的影响,其中既有自然环境的影响又有社会因素的干扰。比如,混凝土的凝固跟外界的环境温度有很大的关系,在进行混凝土浇筑时就要根据环境温度的情况适当的选择浇筑时间和采取必要的协助措施。同时对于施工工地周边的社会环境问题,施工工程项目组人员要做好和周边环境相关人员的沟通,既要确保附近相关人群的正常生活,又要保证工程有一个良好的施工环境。
2.注重现场施工人员整体素质的培养
在施工现场的管理人员不仅要精通相应的建筑知识,同时要懂得管理学方面的知识,知道怎样进行团队间的沟通协作,怎样调动员工的工作积极性处理好和他们的关系。在工作过程中管理人员还应该根据该行业的不断发展不断地提高自己的综合能力和素质,加强自身的工作责任感,真正能够以一个榜样表率的作用带领整个团队。
对于现场施工的人员要抽时间组织学习,培养他们新的工作方法与技能,并且他们对工作的态度也会得到提高。
3.严格把控施工流程和建筑工艺
对于施工过程中的建筑工艺要严加把控,在施工前可以请专业的人士对于施工的工艺流程和建筑的工艺设计进行审核,确保没有问题存在。加强施工过程中各个流程的管理和控制,确保所有的过程都按照正常的标准进行。
4.对施工机械和材料的选择要严格把关
在施工过程中要定期的对于施工机械设备进行检修,及时解决机器的故障问题,将机器设备对于工程质量的影响降低的最小的程度。同时还要对工程施工所要的材料进行审查,在原材料的购进过程中要设置多道程序对原材料的质量和尺寸标准进行检测,确保购进的每一批材料都是符合合格产品标准的。
四、结语
综上所述,建筑工程的现场施工对其整体质量有着不可估量的价值。通过总结建筑工程现场施工经验,可以对建筑工控制起到一定的帮助作用, 以此提高建筑施工企业的整体施工质量,保障工人的人身安全,降低企业的成本,最终对其效益的提高意义重大。
参考文献:
[1]周石水.浅谈建筑施工现场质量管理与控制.《中国房地产业》.2011年11期
[2]吴锋.建筑施工现场质量管理研究.《科技视界》.2012年26期
[3]张利平.浅谈建筑施工现场质量标准化管理.《城市建设理论研究(电子版)》.2012年15期
[4]潘如论.建筑施工现场质量管理浅析.《中华民居》.2010年11期
篇8
【关键词】建筑工程 安全监理 安全控制 手段
一、前言
为了提高建筑工程施工过程中的安全管理工作, 减少安全事故的发生, 国家最新颁布实施的《建筑工程安全生产管理条例》中,把工程安全责任明确归入到监理的工作内容中,使得安全问题得到了越来越多的重视。因为在建筑工程项目施工过程中,现场的安全直接影响着工程施工进度, 并最终决定着建筑工程的经济效益,它是工程能否顺利完成的基本保障。然而,如今的建筑工程监理单位在工程质量、生产成本、施工进度方面做的比较到位,往往在安全施工方面没有引起足够的重视,存在着一些的问题, 导致工程经常发生安全事故。
二、工程安全监理工作中存在的问题
(一)监理人员配备不符合要求
由于工程施工单位和工程监理单位对监理工作的安全控制的重要性认识不深刻,在工程施工过程中存在侥幸心理,最大程度的追求高利益,没有配备专业的安全监理人员进行现场监督。此外,由于监理单位的工作人员来源有限,一般数量较少,从而导致监理人员的整体水平层次不齐,使得建筑工程安全监理工作的安全控制的不能按照规范要求正常进行。
(二) 对安全监理的认识不深刻,安全作用不明显
研究发现,一些监理单位对于监理工作的安全控制仅仅只是应付,对工程的安全保障措施、安全施工方案的审核不够重视,审查不够严格,安全监理工作的开展产生不了真正的作用。此外,一部分监理人员的专业知识比较匮乏,对于安全施工工作缺乏必要的了解,比如工程中的高空作业、脚手架安置、起重吊装等等,在工程施工过程中无法提前发现其中隐藏的技术错误和安全隐患,这样使得对于安全监理的安全控制工作成了泡影,不能发挥其真正的作用。
(三)监理工作没有主次,监理工作混乱
由于一些监理单位的工作人员专业知识不足,从而使得他们在施工现场开展安全控制监理工作时,没有主次工作之分,没有一定的顺序,使得监理工作十分混乱,这样就导致在工程施工时,不能及时的发现工程中存在的安全隐患,对工程的整体稳定性造成威胁。
三、工程施工过程中安全监理的工作要点
(一)监督施工单位完善工程安全生产的组织保证体系。并完善工程安全生产责任制度,监督施工单位对施工人员进行安全生产知识的宣传教育,以及检查并督促施工单位对工程的分项分部的安全技术进行交底和安全防护措施工作;
(二)对各类工程相关施工安全资料。施工方案以及安全技术措施等进行严格审查,以及对进场施工作业的各单位的资质和对工程各工序的安全保证体系和安全施工技术措施、人员配备等进行严格谨慎的审查。
(三)对施工现场的消防工作、文明施工以及工程拟应用的新技术、新工艺的安全控制等进行审查,同时,还要定期的进行工程质量、安全的综合检查。
(四)对工程进行跟踪检查。审查工程承包商在不同工序交接检查的安全报告,对每道工序的安全进行确认。
四、建筑工程施工中安全监理的安全控制手段
(一)提前熟悉施工现场,及时发现存在的安全隐患。监理人员应该事先进入施工现场,对现场的情况和周边的环境进行自习的考察分析,对现场机械设备进行严格的检查,对于现场可能出现的安全问题逐以进行排查,及时发现施工现场的安全隐患,确保施工过程中的万无一失。此外, 在工程开工以前,监理人员还应该和施工人员针对安全作业交底工作进行面对面的交流,及时发现存在的危险源并做出相应的消除危险源的措施, 保障现场的安全施工。
(二)做好开工前的安全准备工作,防患于未然。在开工前,监理人员应对施工现场的环境和施工图纸进行仔细的审查,结合工程的特点制定专门的监理工作方案。同时,要特别注意在接下来的日常监理工作中工程容易出现安全隐患的项目。对不同方面的安全监理工作,分派不同的监理人员,实现监理责任到专人。此外,监理人员还要督促施工单位对施工人员的安全教育,提高工人的安全知识,做到防患于未然。
(三)坚持施工现场的安全检查,及时发现安全隐患。监理单位应对于施工过程中安全情况的检查工作,安排专业的监理人员进行严格的检查。由监理单位和施工单位共同组成安全检查小组,对施工现场进行定期检查,同时还要安排不定期的进行现场的抽查,做到专项检查和整体检查协调开展,从而及时发现安全隐患。在检查过程中,要认真负责,不能敷衍了事,检查结束后要有书面检查记录报告。
(四) 在施工中,注重各单位间的沟通工作。在工程施工过程中,要特别注意各单位间的沟通工作。沟通工作的对象除了施工单位外,还要包括业主方,监理单位只有很好的和施工单位以及业主进行沟通,才能顺利的开展安全监理工作。在实际工程中,有的业主为了缩减工期,或是认为工程的安全管理与乙方没有关系,不接受安全监理提出的意见,这就阻碍了安全监理的工作的开展。因此,监理单位应该加强与工程业主间的沟通,从而让业主意识到工程安全非常重要。当工程施工过程中,出现安全问题时,要及时与业主进行沟通,努力得到他们的积极配合,确保工程的顺利开展。此外,也要注意和施工单位进行沟通,让施工单位引起工程安全的意识。这样才可以确保安全监理工作的顺利开展,保证工程的安全性能。
五、结束语
工程安全监理的安全控制工作贯穿于整个施工过程,它确保了工程的施工安全、施工质量,我们必须客观认识到工程施工安全监理的重要性。此外,工程施工过程中,监理人员一定要结合工程实际特点,充分做好工程施工中的安全监理的安全控制工作。同时,还要准确的判断出工程的安全隐患,并提出相应的解决措施,更好地解决工程施工过程中出现的安全问题。
参考文献:
[1] 周保新.论建筑工程项目的安全监理控制[J].技术与市场,2012(3):120-121.
篇9
关键词:工程;成本控制;保障措施
Abstract: the cost control is the basis of project management and core. Construction project cost control is to the construction project all relevant project schedule, quality cost cost control, to ensure the construction engineering reasonable, smooth. The author combined with practical work experience analysis of the cost control of construction project content and its influencing factors, summarizes the pointed measures, to ensure the engineering cost control.
Keywords: engineering; Cost control; Security measures
中图分类号:F406.72 文献标识码:A文章编号:
引言
施工企业面临的竞争是价格的竞争也即是成本的竞争,施工企业如何在保证施工进度与质量的同时控制施工成本是企业需要面对的重要问题。随着市场经济的不断发展,施工企业面临着空前的市场竞争,施工企业的利润空间越来越小,有时还要考虑社会效益,甚至到了亏损的程度,因此工程成本控制成了建设工程施工管理的核心内容。施工企业在接到施工任务时,不但要在规定工期内,以合格质量完成施工项目,而且要求施工企业通过成本控制提高企业经济效益,这就要求施工企业必须以成本控制为核心,加强工程成本控制,降低消耗、提高效率。
1 建筑工程成本控制的内容及其影响因素
1.1 建筑工程成本控制的内容
建筑工程成本包括很多内容,传统意义上主要包括建筑材料成本、人工成本、机械租赁消耗成本以及工程管理成本等,而建筑工程成本控制的内容其实也是针对这四部分来说的。在管理学上对于建筑成本控制的内容有很多种分类方法,但是最常用也是最合理的分类方法是根据建筑施工过程的顺序进行定义的。具体说来,建筑工程成本控制内容包括:工程投标分阶段的工程成本预测控制;施工准备阶段的成本计划编制;对成本进行事前控制;在施工阶段以施工预算和费用标准对实际发生的费用进行控制;在竣工移交及保修期阶段对验收过程发生的费用及保修费支出进行控制。通过对这些内容的控制,包括了建筑工程的所有内容,有效地保障了建筑工程施工的财政预算,以及工程的顺利进行。
1.2 建筑工程成本控制的影响因素
在实际的生产工作过程中,影响建筑工程成本的因素有很多,有些影响因素是可以预测并且进行调控的,但是有些却是非常突然的问题,这些因素严重影响着建筑工程成本的控制。
1.2.1 管理制度不完善
管理制度是建筑工程成本控制工作顺利进行的有机保障,管理制度不完善造成建筑工程成本预算的不明确。管理制度不完善,会增加施工过程中突发事件的发生次数,导致工程成本的增加,打乱了工程成本的预算控制。管理制度不完善主要体现在两个方面的内容,一是对材料管理制度的不完善,二是人员管理制度不完善。材料管理制度不完善导致材料成本的增加,影响建筑工程成本控制预算;人员管理制度不完善,不仅影响工程进度,而且影响成本控制,还有的会损坏机械等,导致机械损耗成本的增加。
1.2.2 设计变更和现场签证
设计变更和现场签证是建筑工程成本控制的非常重要的影响因素,也是增加建筑成本的主要原因。在实际的建筑工程中,由于工程的要求,需要对原有的设计进行变更,这在很大程度上会改变原来的成本预算,影响工程成本控制;现场变更是对现场多有问题的一种重要凭证记录,这些突发性事件会打乱已有的控制计划,增加了工程总体预算,影响了工程进度。
1.2.3 监管力度不够
工程的监管是保障工程质量、进度以及保障建筑工程成本控制的有效手段。但是,在很多建筑工程中,对于工程的监管力度并不够,很多责任领导不到位,工程责任模糊,导致工程成控制工作受到影响。
2建筑工程成本控制措施
2.1 健全材料管理制度 材料成本的控制,是建筑工程控制工程成本的关键。有些施工企业材料核算粗放,重复运输、进料无验收、出料无限额的现象屡有发生。因此,施工企业要按计划定额采购材料,严禁超定额采购,材料采购数量原则上不得超过预算量。材料采购要尽量减少中间环节或直接从厂家进货,“货比三家”后在确保质量过关的前提下选择低价采购,尽量选择质优价廉、供货及时和信誉良好的材料生产厂家,避免在材料采购时就远不就近,就次不就好,就高不就低;要合理组织运输,采用最经济的运输方式,降低运输成本;要对材料资源进行详细地调查,根据施工计划,确保材料的均衡供应,尽可能降低材料储备。
2.2 优化施工方案
优化施工方案是成本控制的灵魂,采取合适的施工方案往往会事半功倍。这也是施工企业降低工程成本的重
要措施。施工方案主要包括四方面内容:施工方法的确定、施工机的选择、施工顺序的安排和流水施工的组织。
2.3 加强预算管理
预算管理作为加强成本控制的一种有效方法,在许多施工企业得以推广。然而,目前仍有部分施工企业不做预算或者走走形式,在编制时只重视数字计划,没有充分认识到预算的管理职能,造成工程预算与计划投资脱节,有的甚至拖延了工期,不利于财务管理,也无法进行财务监督和控制。因此,施工单位应严格预算管理,加强企业预算管理的组织与协调工作,促进全员参与意识与长期的预算目标,避免盲目行为,激励职工完成企业的目标,减少资金浪费和损失,提高资金使用效益,努力减少资金的占用,提高资金周转率。
2.4 发挥项目经理在成本控制中的作用
由于施工企业项目经理在项目建设管理中起着核心的作用,因此,现代施工建设对项目经理的要求也越来越高。项目经理作为施工项目的负责人,在工程项目中占据重要位置,在建设施工中节省资金、降低损耗、节省劳动力保证项目质量目标,这就是对一个优秀的施工
项目经理的要求,对施工现场的施工质量、成本、进度、安全等负全面的责任,这也是项目经理重要的责任。其能力和素质影响着施工企业的经营效果。作为施工企业要想有效的控制成本,必须有一个懂技术、懂管理、懂会计的高素质的项目经理。把成本控制放在首位,审核项目工作准备、组织和管理生产所发生的全部费用支出,严格审核各项成本费用,控制成本支出。建立天、周、月度财务收支计划制度,平衡调度资金,采取针对性的措施来纠正项目成本的偏差。
2.5 加强合同管理,做好索赔工作
索赔是一门科学,更是一门艺术,索赔是挽回经济损失的重要途径之一,是合同管理的重要环节。索赔管理贯穿于工程项目全过程、工程实施的各个环节和各个阶段。要组织好索赔,一是搜集索赔资料。当前有的施工企业索赔事件发生后,没有及时收集证据和在有效期内提出索赔报告,丧失了本应行使的索赔权利,造成了巨大的损失,因此施工企业要按施工合同文件有关规定,认真、如实、合理、正确地计算索赔的时间和费用,撰写索赔文件,及时提出高质量的索赔报告,为索赔成功和企业取得较好的经济效益打下坚实的基础。二是掌握索
赔的技巧,友好协商的方式往往比尖锐对抗的形式更易解决争端,索赔是一项很复杂的工作,它涉及到多个门类,多个学科,与工程技
术、财务管理等各个方面都有密切的联系。这就要求相关人员要提高个人素质和能力,要掌握一些工程技术、法律、FIDIC 的系统知识,并有一定的综合协调管理能力。
2.6重视固定资产的管理
施工企业固定资产往往具有价值高,磨损大的特点,其对固定资产的管理,直接影响着企业自身的发展。
成本控制是项目管理的基础和核心。当前,施工企业面临的竞争是价格的竞争也即是成本的竞争,施工企业如何在保证施工进度与质量的同时控制施工成本是企业需要面对的重要问题。因此,加强项目管理是企业管理的首要任务,而加强成本管理已成为工程施工管理的主线
篇10
关键词:建筑工程;管理
随着建筑事业的高速发展,建筑工程项目管理作为提高建筑施工企业核心竞争力有效手段,越来越得到业界的关注和重视。建筑工程管理项目是一项综合性、系统性的工作,主要包括人员管理、进度管理、成本管理、质量管理等内容,虽说建筑工程项目管理在理论知识及实践技巧方面有了很大提高和完善,但由于其本身的复杂性,不可避免存在着诸多的问题,如质量控制不重视事前计划,工程进度更新不及时,机械设备配置不合理,全员安全教育不到位等,需要不断进行挖掘其中的问题,并加以改进,文章根据自身工作经验,并结合工程实例,分析了建筑工程管理技术措施,以促进建筑施工企业工程质量的提高,施工成本的缩减,企业竞争力的增强。
1建筑工程项目人员管理
建筑工程项目全过程都需要各类人员的参与,所以对人员的管理是建筑工程项目管理的核心。为了达到高效率的人员管理,首先就是要组建高效的项目管理团队,确定项目管理的组织结构和人员。项目经理是项目管理的关键核心人物,项目经理素质应符合政治素质、领导素质、知识素质、实践经验、身体素质五个方面的要求。项目部管理机构的设置及编制,由项目经理申报企业高层领导审批、备案后确定。项目部组织机构要建立项目经理部绩效管理办法及完整的项目HSE监督管理的激励约束机制,有效遏制了“低、老、坏”作风,提高了项目管理的积极性。项目管理工作的从管理职能上来分,主要分为绩效考核、检查监督、项目管理实施三个管理模块,要明确项目管理部门主要负责人和各组主要职责。
2建筑工程项目质量管理
施工质量管理主要是围绕五大因素(人、机、料、法、环)进行的,通过人员培训、管理、评定等以保证施工人员的素质,通过机械养护、检修、使用控制等保证施工机械设备处于最佳状态,通过对所有工程材料的严格管理以保证工程质量满足最基本要求,通过合理利用施工流程,采取先进、科学的施工方法确保本工程的建设任务优质、快速地完成,形成全过程的质量管理体系。
(1)建立完善的质量管理体系。工程质量体系文件按管理手册、程序文件、作业文件三级编制。编制专门的程序文件,作业文件。管理文件后,项目部组织各分包商按照管理文件的要求,针对各自的施工任务编制相应的作业文件,如质量计划书、现场检查表等。
(2)执行全过程质量管理。在工程的开工准备阶段、施工阶段、竣工验收阶段三个阶段的都进行质量控制,安排落实专职人员到每一个质量管理岗位,严格按照制定的项目管理全过程质量控制流程来执行。在每一个阶段,根据阶段的实际情况,按照此阶段质量管理的流程,每一项工作都要认真负责。每一个工作报表,每一个检查,每一次审核,每一次执行都要按照流程图来执行。
(3)发挥“人的因素第一”的主导作用。如上所述,把人的控制作为全过程控制的重点。对项目管理人员,根据职责分工,必须尽职尽责,做好本职工作,同时搞好团结协作,对不称职的管理人员及时调整。对外包施工队伍严格施工资质审查,并进行考核上岗施工。在编制施工计划时,全面考虑各种因素对工程质量的影响和人与任务的平衡,防止造成人为事故。
(4)重视施工机械设备辅助作用。施工机械设备是建筑企业组织生产的重要工具,施工阶段机械设备管理的好坏将直接影响到建筑工程项目的质量,施工机械设备管理是在机械设备质量完好的情况下所采取的一系列选择和使用策略。首先是机械设备的有效选择。在具体的建筑工程项目中,要本着生产上适用,技术上先进,性能上可靠,经济上合理,使用、安装、操作、维修上方便的原则来进行选择。其中,施工机械设备的性能参数是选择的重要依据,必须满足施工需求和质量保障。如在选择起重机的时候,其主要性能参数必须满足构件吊装中的起重量、起重高度和起重半径要求。其次是机械设备的合理使用。施工机城设备的合理使用和正确操作,是保证建筑工程项目施工质量的重要措施,应贯彻“人机固定”原则,实施定机、定人、定岗责任的三定制度。特别是在施工现场,机械设备操作人员务必严格遵守相关规章制度和操作规程,以防止安全质量事故发生。
(5)把握施工材料的选、存、放。建筑工程材料质量好坏将会对建筑工程质量直接产生影响,施工阶段材料的管理不只是保证原材料在施工使用之前是否合格,最重要的是选择合格合适的建筑材料。首先和机械设备一样,要重视施工材料的选择。材料的选择,不仅仅是质量合格的产品,其关键是合适的产品,需要结合建筑工程的实际情况来选择材料,经济、合理、实用,并符合相关要求。其次是施工材料的贮存。在进场施工材料检验合格后,要根据材料的品种、规格、性能选择适宜的场地进行贮存,并对所贮存施工材料的技术文件、数量等信息进行科学的管理,还要采取相对应的防火、防潮、防损等防范措施,堆放整齐、标识清楚,以确保贮存场地材料存放的安全及质量的不变。最后是施工材料的发放。现场施工材料的发放应做到发放有据,材料领用时要求手续齐全,在施工过程中分阶段对材料使用进行分检和核算,防止材料超用。
(4)设置质量控制点。根据工程需要,重点对关键部位或薄弱环节进行设置质量管理点,通过设置质量控制点来保证工程质量目标的实现,保证各工序都处于受控状态,主要包括施工测量管理点、机械挖土质量管理点、钢筋绑扎质量管理点、木模安装与拆除质量管理点、砖砌筑质量管理点、混凝土质量管理点、楼地面质量管理点等关键部位的设置。以混凝土工程项目为例,其详细质量管理点设置如表1所示。
表1 混凝土质量管理点设置
项目
名称 管理
目标 分项
工程 管理点
设置 规范标准
允许偏差 策略 检查
工具
混
凝
土
工
程 无
蜂窝
麻面
露筋
孔洞
夹渣 蜂窝 配合比
振捣 梁柱上一处
≤ lOOcm2
基础、墙、板
≤400cm2 控制配合比;自由倾落度不超过2m。封存浇灌,掌握振捣时间 尺量
孔洞 下料振捣 无孔洞 凿去
露筋 保护层厚度
振捣 无露筋 尺量
缝隙夹渣 振捣 无缝隙夹渣 凿去
位移 浇灌振捣 5~15mm 位置线要正确,及时调整误差。预埋件位置正确,定位牢固严禁撞击钢筋、预埋件 尺量
平整度 标高线
及模板 8mm 5mm 2m靠尺
垂直度 模板
及下料力度 5mm 2m托
线板
截面尺寸 模板
及下料力度 +5mm、-2mm 尺量
标高 模板
及标高线 ±10mm 竖向
尺量
(5)认识施工环境的重要性。施工环境时常对建筑工程施工阶段质量产生影响,施工环境主要包括建筑工程水文、地质、气象等技术环境和邻近工程、管线、交通等周边环境两部分。环境因建筑工程性质、施工地点等不同而差异较大,所以需要具体问题具体解决。
3建筑工程项目进度管理
为了保障工程建设有条不紊地按计划推进,需要对工程进度进行有效的管理。
(1)要做好计划、跟踪、调度三项工作。根据工程特点,项目执行计划可采用国际先进的P3软件编制出倒排式项目计划,对工程总体进度、设计、采办、市场开发等各项工作制定出明晰具体的分级实施计划,明确工作内容、完成时间、责任主体、保障措施、工作标准等,并建立健全了从上至下四级控制体系,将责任层层分解,最终落实,保证了工程建设的顺利进行。
(2)建立流畅、有序的工程调度体系。流畅、有序的工程调度体系,极大地促进了工程协调平衡、整体推进。同时,把工作重点放在控制和协调整个项目进展上,以项目计划为刚性指标,每月召开一次总结会,检查分析上月计划执行情况,安排部署下月计划,并制定措施促使各项指标不折不扣执行。
(3)进度计划及时更新。工程进度控制要重视进度计划的及时更新。项目进度控制的标准是进度计划。进度计划是表示项目中各个单位工程或各个分项工程中的施工顺序、开竣工时间及相互衔接关系的计划,编制进度计划的关键是计划的选择,及时更新的进度计划指导了施工的顺利进行。以某工程项目为例,其完成期限为1年,施工时间进度计划表如表2所示。从表2可以看的出来,针对每一个施工环节都是有具体的时间计划和安排,并且按照这个进度时间表,对工程的施工过程实施全面的跟踪和管理,建立工程调度体系。在总的进度表控制之下,每一个施工环节都有相应的时间进度控制安排,明确工作内容和预期的完成时间、工作标准、保障措施等,建立从高层到项目管理层在到基层实施层由上至下的循环控制体系,及时更新和调整进度计划,以确保工程项目施工进度能够按照预期的目标完成。
表2 工程施工时间进度计划表
项目
名称 1
月 2
月 3
月 4
月 5
月 6
月 7
月 8
月 9
月 10
月 11
月 12
月
施工准备
土工开挖
毛石砌体
基础地梁
一层结构
二层结构
三层结构
四层结构
五层结构
六层结构
室内外抹灰
外墙处理
屋面工程
门窗工程
室内装修
水电工程
完工清理
竣工验收
4建筑工程项目成本管理
对于建筑工程项目,一开始就要将施工部署和安排、资源配置、施工方法和措施、分包价格的确定和分包结算的控制等作为成本控制的关键点,狠抓成本控制,严格成本管理。
(1)合理配置资源,向生产组织要效益。要想提高效益,必须充分利用资源,减少停工、窝工损失。项目部采用分批、分次合理调遣队伍等方法,保证了生产,降低了固定成本。合理配置资源,以最小的投入获得最大的产出。
(2)采用科学的施工方法,在技术上确保成本的节约。有针对性的改善和提升施工工艺和方法。在能够确保项目的质量的同时,通过施工方法的改进来控制整个项目的成本,从而提升企业的施工利润。与此同时,还应采用严格分包管理、配合工管理、定额管理等方法控制成本。多项措施的结合,实现成本控制目标。
5建筑工程项目安全管理
对整个工程项目的安全重点部位制定相应的安全防范措施,以文件形式下发如《做好建筑施工准备工作》、《加强施工运行期间现场安全管理》等通知,对现场施工安全监督做出明确规定和提出具体要求。就如何搞好运输安全管理、作业现场安全管理、工地保护、应对各种突发事件等方面,做出总体安排和部署。按照“一区一预案,一幢一预案,一室一预案”的要求,确定一级预案,二级预案,三级预案及各类子预案,建立和完善了应急求援预案体系,并特别注重与相关上下游的衔接,系统内相关资源的利用,加强协同作战的能力。通过宣传、培训增强全员安全责任意识,努力创造一个安全、和谐、文明的施工现场。
6结语
相关期刊
精品范文
10建筑装饰装修工程